Reduction of pressure on protected species and habitats in the area of Lake Gołdap by building a cycle track (Q4427972)

From EU Knowledge Graph
Revision as of 00:19, 22 October 2022 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en, and other parts: Adding translation)
Jump to navigation Jump to search
Project Q4427972 in Poland
Language Label Description Also known as
English
Reduction of pressure on protected species and habitats in the area of Lake Gołdap by building a cycle track
Project Q4427972 in Poland

    Statements

    0 references
    2,129,920.26 zloty
    0 references
    473,481.27 Euro
    0 references
    2,505,788.54 zloty
    0 references
    557,036.79 Euro
    0 references
    85.0 percent
    0 references
    17 July 2019
    0 references
    30 September 2023
    0 references
    GMINA GOŁDAP
    0 references
    Projekt zostanie zrealizowany w miejscowości uzdrowiskowej Gołdap. Działki objęte realizacją inwestycji graniczą z obszarem Parku Krajobrazowego Puszczy Rominckiej i stanowią wspólny obszar o powierzchni 153,77 ha na którym stwierdzono występowanie siedlisk 109 chronionych gatunków fauny i flory objętych projektem. W celu zmniejszenia presji wynikającej z ruchu turystycznego na gatunki i ich siedliska wyszczególnione w ekspertyzie przyrodniczej z sierpnia 2020 roku, planuje się: 1) budowę ścieżki pieszo-rowerowej, o długości 1,46 km, linii oświetleniowej z lamp parkowych, ustawienie wzdłuż ścieżki 9 ławek i 17 koszy; 2) budowa Miejsca Obsługi Rowerzystów (MOR), wyposażonego w: zadaszoną wiatę z ławkami i stolikami, ławki, taras widokowy, hamaki, leżaki, stacji naprawy rowerów, stojaki na rowery, lornetkę, pojemniki, kosze i 3 kamery; 3) ustawienie 10 tablic edukacyjnych, 25 budek lęgowych i 4 koszy, 6 hoteli dla owadów, 2 kaczkomatów, założenie łąki kwietnej o powierzchni 2000m2 oraz nasadzeń z bluszczu, przyczyni się do ochrony różnorodności biologicznej flory i fauny na tym terenie. W ramach działań informacyjno-edukacyjnych zaplanowano również warsztaty ekologiczne z nagrodami, liczba os. Korzystających z działań edukacyjnych - 500. Cały obszar objęty projektem, w tym powstała infrastruktura będą dostępne dla osób z niepełnosprawnościami. Etapy, sposób wdrażania proj: 1.Oprac. dokumentacji techn. i SW. Wykonanie ekspertyzy przyr. 2.Złożenie wniosku, umowa o dofinansowanie. 3.Wybór wykonawców wg PZP– roboty budowlane, nadzór inwestorski, promocja, kampania infor. -edukacyjna. 4.Realizacja prac wg harmonogramu rzecz.-finans. 5.Odbiór prac (protokoły) 6.Zakończ. proj. 7.Finans. rozliczenie proj. Projekt wpisuje się w SzOOP RPO WiM poprzez zmniejszenie presji na gatunki i siedliska występujące na obszarze oddziaływania poprzez właściwe ukierunkowanie ruchu turystycznego oraz edukację ekologiczną. (Polish)
    0 references
    The project will be implemented in the spa town of Gołdap. The plots covered by the implementation of the investment border the area of the Landscape Park of the Romincka Forest and constitute a common area with an area of 153.77 hectares in which habitats of 109 protected species of fauna and flora covered by the project have been identified. In order to reduce the pressure resulting from tourist traffic on the species and their habitats listed in the August 2020 Nature Expertise, it is planned to: 1) construction of a walking-bike path, with a length of 1.46 km, lighting line with park lamps, setting along the path of 9 benches and 17 baskets; 2) construction of the Cycling Service Centre (MOR), equipped with: covered shed with benches and tables, benches, observation deck, hammocks, deck chairs, bicycle repair stations, bicycle stands, binoculars, containers, baskets and 3 cameras; 3) setting up 10 educational boards, 25 breeding booths and 4 baskets, 6 hotels for insects, 2 ducks, the establishment of a flower meadow with an area of 2.000 m² and ivy plantings, will contribute to the protection of the biodiversity of flora and fauna in this area. As part of the information and education activities, ecological workshops with prizes, number of people, were also planned. Benefiting from educational activities — 500. The entire area covered by the project, including the infrastructure created, will be accessible to persons with disabilities. Stages, method of implementation of the project: 1.Elaboration of technical documentation and SW. Carrying out an expert opinion on the aerial. 2.Submission of an application, a grant agreement. 3.Selection of contractors according to PZP- construction works, investor supervision, promotion, infor campaign. it’s educational. 4.Execution of works according to the schedule of the item.-financial. 5.Receipt of works (protocols) 6.Finish.project. 7.Finans. billing project. The project fits into the SzOOP ROP WiM by reducing pressure on species and habitats present in the affected area through proper targeting of tourist traffic and ecological education. (English)
    0 references
    WOJ.: WARMIŃSKO-MAZURSKIE, POW.: gołdapski
    0 references

    Identifiers

    RPWM.05.03.00-28-0029/20
    0 references