Revitalisation of railway lines no. 317 and 336 on the section Gryfów Śląski-Mirsk-Świeradów, Stage I Gryfów Śląski-Mirsk (Q4426586)

From EU Knowledge Graph
Revision as of 21:00, 21 October 2022 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en, and other parts: Adding translation)
Jump to navigation Jump to search
Project Q4426586 in Poland
Language Label Description Also known as
English
Revitalisation of railway lines no. 317 and 336 on the section Gryfów Śląski-Mirsk-Świeradów, Stage I Gryfów Śląski-Mirsk
Project Q4426586 in Poland

    Statements

    0 references
    22,113,821.14 zloty
    0 references
    4,915,902.44 Euro
    0 references
    26,016,260.16 zloty
    0 references
    5,783,414.63 Euro
    0 references
    85.0 percent
    0 references
    10 November 2021
    0 references
    30 December 2022
    0 references
    WOJEWÓDZTWO DOLNOŚLĄSKIE REPREZENTOWANE PRZEZ DOLNOŚLĄSKĄ SŁUŻBĘ DRÓG I KOLEI WE WROCŁAWIU
    0 references
    0 references
    Przedsięwzięcie polega na rewitalizacji linii kolejowej nr 317 i 336 na odcinku Gryfów Śląski–Mirsk–Świeradów Etap I-Gryfów Śląski–Mirsk. Projekt realizowany będzie w województwie dolnośląskim, w powiecie lwóweckim. Przedmiotowa rewitalizacja zgłoszona została do dofinansowania przez Województwo Dolnośląskie,reprezentowane przez Dolnośląską Służbę Dróg i Kolei we Wrocławiu, będącą wojewódzką jednostką organizacyjną, która pozostaje podmiotem właściwym dla realizacji inwestycji w zakresie transportu i dróg.Celem projektu jest poprawa dostępności transportowej regionu Województwa Dolnośląskiego i jego obszarów peryferyjnych poprzez rewitalizację linii kolejowej nr 317 Gryfów Śląski–Mirsk, co następnie pozwoli na połączenie tego odcinka z linią kolejową nr 336 z odcinkiem Mirsk–Świeradów Zdrój, a w konsekwencji włączenie tych miast do kolejowej sieci Dolnego Śląska. Grupą docelową pozostają mieszkańcy województwa dolnośląskiego, w tym przede wszystkim obszaru i okolicy Gryfowa Śląskiego i Mirska (szczególnie dzieci, młodzież, osoby pracujące poza granicami wskazanych miast), władze samorządowe oraz Województwo Dolnośląskie. W ramach projektu zmodernizowana zostanie linia kolejowa 317 na odcinku Gryfów Śląski–Mirsk od km 72,178 do km 80,061.Przedmiotowy projekt przewiduje przeprowadzenie prac modernizacyjnych obejmujących zaprojektowanie i wykonanie robót polegających na wycince drzew i krzewów oraz robotach pomiarowych, rozebranie toru, usunięcie podsypki tłuczniowej, ścięcie ławy torowiska, renowacja systemu odwodnienia, układanie toru na podkładach betonowych, zaprojektowanie i zabudowę urządzeń samoczynnej sygnalizacji przejazdowej oraz modernizacja obiektów inżynieryjnych, przystanków osobowych oraz przejazdów kolejowych. Przedmiotowy projekt stanowi części większej inwestycji, realizowany będzie jako I Etap inwestycji, połączony z II Etapem inwestycji tj. Rewitalizacją linii kolejowej nr 317 i 336 Gryfów Śląski – Mirsk–Świeradów–Etap II Mirsk–Świeradów Zdrój. (Polish)
    0 references
    The project consists of the revitalisation of railway lines no. 317 and 336 on the section Gryfów Śląski-Mirsk-Świeradów Stage I-Gryfów Śląski-Mirsk. The project will be implemented in the Lower Silesian Voivodeship, in the Lwówecki district. This revitalisation was submitted for co-financing by the Lower Silesian Voivodeship, represented by the Lower Silesian Road and Rail Service in Wrocław, which is a regional organisational unit, which remains the competent entity for the implementation of investments in transport and roads.The aim of the project is to improve the transport accessibility of the Lower Silesian Voivodeship and its peripheral areas by revitalising the railway line No. 317 Gryfów Śląski-Mirsk, which will then allow for the connection of this section with railway line No 336 with the section of Mirsk-Świeradów Zdrój, and the railway network of Lower Silesia. The target group remains the inhabitants of the Lower Silesian Voivodeship, including primarily the area and surroundings of Gryfów Śląski and Mirska (especially children, young people, people working outside the designated cities), local authorities and the Lower Silesian Voivodeship. As part of the project, railway line 317 will be modernised on the section Gryfów Śląski-Mirsk from km 72,178 to km 80,061.The aim of the project is to carry out modernisation works involving the design and execution of works consisting of cutting down trees and shrubs and measuring works, dismantling the track, removing the ballast, cutting the track down the track, renovating the drainage system, laying the track on concrete sleepers, designing and building automatic traffic signalling devices and modernisation of engineering facilities, passenger stops and railway crossings. This project is part of a larger investment, it will be implemented as the I stage of the investment, combined with the second stage of the investment, i.e. Revitalisation of railway lines no. 317 and 336 Gryfów Śląski — Mirsk-Świeradów-Stage II Mirsk-Świeradów Zdrój. (English)
    0 references
    WOJ.: DOLNOŚLĄSKIE, POW.: lwówecki
    0 references

    Identifiers

    RPDS.05.02.01-02-0002/21
    0 references