PROCESS EFFICIENCY INNOVATION (Q2033265)

From EU Knowledge Graph
Revision as of 23:07, 24 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): THE PROPOSED CONSULTANCY PROCESS CONSISTS OF 4 STEPS AND ÃS GEARED TO THE DESIGN OF A PRODUCTION SYSTEM ACCORDING TO INDUSTRY 4.0 SCHEMES, ALLOWING EFFICIENCY RECOVERY BY MEANS OF ADVANCED SYSTEMS FOR CONTROL AND MANAGEMENT OF PRODUCTION OPERATIONS., Adding English summary)
Jump to navigation Jump to search
Project in Italy financed by DG Regio
Language Label Description Also known as
English
PROCESS EFFICIENCY INNOVATION
Project in Italy financed by DG Regio

    Statements

    0 references
    7,500.0 Euro
    0 references
    15,000.0 Euro
    0 references
    50.0 percent
    0 references
    25 September 2017
    0 references
    10 January 2019
    0 references
    31 March 2018
    0 references
    M. C. M. SRL
    0 references
    Q281674 (Deleted Item)
    0 references
    IL PERCORSO CONSULENZIALE PROPOSTO SI COMPONE DI 4 FASI ED Ê ORIENTATO ALLA CONFIGURAZIONE DI UN SISTEMA PRODUTTIVO SECONDO GLI SCHEMI DI INDUSTRIA 4.0 CHE PERMETTA ALL'AZIENDA UN RECUPERO DI EFFICIENZA GRAZIE A SISTEMI AVANZATI PER IL CONTROLLO E LA GESTIONE DELLE OPERAZIONI PRODUTTIVE. (Italian)
    0 references
    THE PROPOSED CONSULTANCY PROCESS CONSISTS OF 4 STEPS AND ÃS GEARED TO THE DESIGN OF A PRODUCTION SYSTEM ACCORDING TO INDUSTRY 4.0 SCHEMES, ALLOWING EFFICIENCY RECOVERY BY MEANS OF ADVANCED SYSTEMS FOR CONTROL AND MANAGEMENT OF PRODUCTION OPERATIONS. (English)
    0 references

    Identifiers

    C89J17000270007
    0 references