RES microinstallations in the Municipality of the City of Brańsk — Grant Project (Q4419321)

From EU Knowledge Graph
Revision as of 13:58, 21 October 2022 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in en, and other parts)
Jump to navigation Jump to search
Project Q4419321 in Poland
Language Label Description Also known as
English
RES microinstallations in the Municipality of the City of Brańsk — Grant Project
Project Q4419321 in Poland

    Statements

    0 references
    1,293,500.0 zloty
    0 references
    287,545.05 Euro
    0 references
    1,990,000.0 zloty
    0 references
    442,377.0 Euro
    0 references
    65.0 percent
    0 references
    4 November 2021
    0 references
    30 June 2023
    0 references
    MIASTO BRAŃSK
    0 references
    0 references
    Planowane przedsięwzięcie dotyczy montażu: 1. Instalacja kolektorów słonecznych: a) dostosowana do potrzeb 1-3 osób: 15 sztuk. b) dostosowana do potrzeb 4-5 osób: 15 sztuk. c) dostosowana do potrzeb 6 i więcej osób: 3 sztuk. Planowana łączna moc instalacji kolektorów słonecznych wynosi: 171,9 kW. 2. Instalacja fotowoltaiczna do 5 kW: 38 sztuk, moc. Planowana łączna moc instalacji fotowoltaicznych wynosi: 190,0 kWp Ilość poszczególnych instalacji OZE został określony na podstawie ankietyzacji mieszkańców gminy. Wszystkie wyżej podane wartości są wartościami orientacyjnymi, właściwe ilości poszczególnych instalacji zostaną określone podczas realizacji projektu po ogłoszeniu naboru na powierzenie grantów. Ogłoszenie naboru dla grantobiorców planowane jest na grudzień 2020. Tryb naboru został określony w Regulaminie naboru będącym załącznikiem do Wniosku o dofinansowanie. Maksymalny termin przyjmowania wniosków od grantobiorców planowany jest na 31 grudnia 2022 roku, natomiast maksymalny termin zakończenia realizacji inwestycji (data wystawienia faktury) przez grantobiorców planowany jest na 30 czerwiec 2023 r. Przewidziany czas na realizację poszczególnej inwestycji dla grantobiorcy to 180 dni od daty złożenia wniosku o udzielnie grantu. Miejsce montażu określane jest przez grantobiorcę na podstawie indywidualnych możliwości i potrzeb lokalizacyjnych. Wielkość instalacji kolektorów słonecznych i fotowoltaicznych dopasowywana będzie do indywidualnych potrzeb grantobiorcy, uwzględniający w przypadku kolektorów ilość zamieszkujących osób, a w przypadku fotowoltaiki roczne zużycie energii elektrycznej. Termin realizacji projektu przewidziany jest od IV kwartału 2020 do II kwartału 2023. (Polish)
    0 references
    The planned project concerns the assembly of: 1. Installation of solar collectors: a) adapted to the needs of 1-3 people: 15 pcs. b) adapted to the needs of 4-5 people: 15 pieces. c) adapted to the needs of 6 and more people: 3 pcs. The planned total power of solar collectors installation is: 171.9 kW. 2. Photovoltaic installation up to 5 kW: 38 pieces, power. The planned total power of photovoltaic installations is: The number of individual RES installations was determined on the basis of the survey of the inhabitants of the municipality. All the above values are indicative values, the appropriate quantities of individual installations will be determined during the implementation of the project after the announcement of the call for grants. The announcement of the recruitment for grantees is planned for December 2020. The selection procedure is set out in the Rules of Application which are attached to the Application for co-financing. The maximum deadline for accepting applications from grantees is planned for 31 December 2022, while the maximum deadline for the completion of the investment (invoicing date) by the grantees is planned for 30 June 2023. The time allowed for the implementation of the individual investment for the grantee is 180 days from the date of submission of the grant application. The place of assembly is determined by the Grant Recipient on the basis of individual capabilities and localisation needs. The size of the installation of solar and photovoltaic collectors will be adjusted to the individual needs of the grantee, taking into account, in the case of collectors, the number of inhabitants, and in the case of photovoltaics, the annual electricity consumption. The project will be implemented from the fourth quarter of 2020 to the second quarter of 2023. (English)
    21 October 2022
    0 references
    WOJ.: PODLASKIE, POW.: bielski
    0 references

    Identifiers

    RPPD.05.01.00-20-0907/20
    0 references