(A19_075_2015_0750049_1054) IEP UPELLA (Q2065912)
Jump to navigation
Jump to search
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | (A19_075_2015_0750049_1054) IEP UPELLA |
Project in Italy financed by DG Regio |
Statements
55,170.0 Euro
0 references
110,340.0 Euro
0 references
50.0 percent
0 references
13 March 2015
0 references
12 December 2018
0 references
13 March 2017
0 references
CARBONIZZO USELLA SRL
0 references
IL PROGETTO ? RELATIVO ALL'EFFICIENTAMENTO DEL PROCESSO PRODUTTIVO DELL?AZIENDA CARBONIZZO USELLA SRL. IN PARTICOLARE CON I TRE INTERVENTI CHE SI VANNO A REALIZZARE SI VOGLIONO DIMINUIRE SENSIBILMENTE I CONSUMI ENERGETICI COMPLESSIVI DELL?AZIENDA. INFATTI NOTO IL PROCESSO PRODUTTIVO ANDREMO AD INTERVENIRE SU QUELLE FASI DI LAVORAZIONE CHE SONO LE MAGGIORMENTE ENERGIVORE: ASCIUGANTI E ?LAVAGGIONI?. INTERVENTO 1: ATTUALMENTE IL CARBONIZZO USELLA SRL UTILIZZA DUE MACCHINARI, CHE VENGONO ALIMENTATI A VAPORE, PER ASCIUGARE IL PRODOTTO USCENTE PRIMA DAI ?LAVAGGIONI? E POI DALLE CENTRIFUGHE. INFATTI OGGI IL PRODOTTO VIENE SCALDATO E ASCIUGATO TRAMITE ARIA CALDA CHE PASSA ATTRAVERSO DELLE BATTERIE DI SCAMBIO TERMICO FRA ARIA E VAPORE. QUESTO PARTICOLARE INTERVENTO HA L?OBIETTIVO DI ELIMINARE LA CENTRALE TERMICA COSTITUITA DA UNA CALDAIA DI VECCHIA GENERAZIONE DA 1'500 KG/H DI VAPORE CON DEI BRUCIATORI DIRETTAMENTE MONTATI SULLA MACCHINA. IN QUESTO MODO SARANNO DRASTICAMENTE RIDOTTE (SE NON QUA (Italian)
0 references
THE PROJECT? RELATING TO THE EFFICIENCY OF THE PRODUCTION PROCESS OF THE COMPANY CARBONIZO USELLA SRL. IN PARTICULAR, DO THE THREE MEASURES PUT IN PLACE SEEK TO SIGNIFICANTLY REDUCE THE OVERALL ENERGY CONSUMPTION OF THE COMPANY? IT IS WELL KNOWN THAT THE PRODUCTION PROCESS IS GOING TO TAKE ACTION ON THOSE PROCESSING STAGES THAT ARE THE MOST ENERGY-INTENSIVE: IS YOU AND A LAVAGGIONI? ACTION 1: CURRENTLY, MR USELLA SRL USES TWO MACHINES, WHICH ARE FED WITH STEAM, TO DRY UP THE OUTGOING PRODUCT FOR THE FIRST TIME FROM? LAVAGGIONI? AND THEN FROM THE CENTRIFUGES. THE PRODUCT IS NOW HEATED AND DRIED BY MEANS OF AIR HOT AIR HEATING BATTERIES. THE AIM OF THIS PARTICULAR INTERVENTION IS TO ELIMINATE THE THERMAL POWER PLANT IN THE FORM OF A 1-500 KG/HOUR STEAM BOILER WITH DIRECTLY MOUNTED BURNERS ON THE MACHINERY. IN THIS WAY THEY WILL BE DRASTICALLY REDUCED (IF NOT (English)
0 references
Identifiers
D58I15002000009
0 references