MEASURES TO REDUCE ENERGY CONSUMPTION (Q2074072)

From EU Knowledge Graph
Revision as of 15:27, 24 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): ENERGY AUDITS SUGGESTED 4 INTERVENTIONS FOR: REDUCING FARM ENERGY NEEDS; REDUCING CO2 EMISSIONS THROUGH THE USE OF RENEWABLE SOURCES. THE SOLUTIONS IDENTIFIED ARE: REPLACEMENT OF NEON LAMPS USING A HIGH NUMBER OF HOURS/YEAR WITH LED LAMPS; INSTALLATION OF A PHOTOVOLTAIC INSTALLATION OF 50 KWP; — TOOLS CABLING FOR MEASURING THE ELECTRIC CARRIER; — TOTAL REFURBISHMENT OF WATER VAPOUR DISTRIBUTION LINES; — INSTALLATION OF WATER AND GAS MEASUR...)
Jump to navigation Jump to search
Project in Italy financed by DG Regio
Language Label Description Also known as
English
MEASURES TO REDUCE ENERGY CONSUMPTION
Project in Italy financed by DG Regio

    Statements

    0 references
    21,930.3 Euro
    0 references
    43,860.6 Euro
    0 references
    50.0 percent
    0 references
    27 November 2017
    0 references
    17 October 2018
    0 references
    16 July 2018
    0 references
    MAGLIFICIO GIORDANO'S S.R.L.
    0 references
    0 references

    45°58'10.34"N, 12°21'42.01"E
    0 references
    LA DIAGNOSI ENERGETICA HA CONSENTITO DI PROPORRE 4 INTERVENTI PER: RIDURRE IL FABBISOGNO ENERGETICO AZIENDALE; DIMINUIRE LE EMISSIONI DI CO2 EQUIVALENTE ATTRAVERSO L'IMPIEGO DI FONTI RINNOVABILI. LE SOLUZIONE INDIVIDUATE SONO LE SEGUENTI: - SOSTITUZIONE DELLE LAMPADE NEON FUNZIONANTI UN NUMERO ELEVATO DI ORE/ANNO CON LAMPADE A LED; - INSTALLAZIONE DI UN IMPIANTO FOTOVOLTAICO DA 50 KWP; - CABLAGGIO DI STRUMENTI PER LA MISURA DEL VETTORE ELETTRICO; - RIFACIMENTO TOTALE DELLE LINEE DI DISTRIBUIZIONE DEL VAPOR D'ACQUA; - INSTALLAZIONE DI STRUMENTI PER LA MISURA DELL'ACQUA E DEL GAS NATURALE ATTI ALLA GENERAZIONE DI VAPOR D'ACQUA E PRELEVATI DALLE RETI IDRICA E METANIFERA. (Italian)
    0 references
    ENERGY AUDITS SUGGESTED 4 INTERVENTIONS FOR: REDUCING FARM ENERGY NEEDS; REDUCING CO2 EMISSIONS THROUGH THE USE OF RENEWABLE SOURCES. THE SOLUTIONS IDENTIFIED ARE: REPLACEMENT OF NEON LAMPS USING A HIGH NUMBER OF HOURS/YEAR WITH LED LAMPS; INSTALLATION OF A PHOTOVOLTAIC INSTALLATION OF 50 KWP; — TOOLS CABLING FOR MEASURING THE ELECTRIC CARRIER; — TOTAL REFURBISHMENT OF WATER VAPOUR DISTRIBUTION LINES; — INSTALLATION OF WATER AND GAS MEASUREMENT INSTRUMENTS SUITABLE FOR STEAM GENERATION AND COLLECTED FROM WATER AND GAS NETWORKS. (English)
    0 references

    Identifiers

    B65H17000060007
    0 references