ENERGY ADJUSTMENT BEAKERS SPA (Q2074054)

From EU Knowledge Graph
Revision as of 15:27, 24 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): THE ANALYSIS OF THE DATA COLLECTED IN THE COURSE OF THE ENERGY AUDIT HAS LED TO THE EXCLUSION OF CERTAIN MORE COMPLEX EFFICIENCY INITIATIVES TO BE DEFINED AND DETAILED IN THE SHORT PERIOD OF TIME FORESEEN IN THE CALL FOR TENDERS IN FAVOUR OF OTHER CLEAR AND EFFECTIVE MEASURES FOR THE PURPOSES OF ENERGY SAVING, SUCH AS THE INITIATIVE TAKEN BY THE DIRECTORATE FOR THE EFFICIENCY OF THE POWER GENERATION PLANT. BY VIRTUE OF THE FACT THAT THE SITE IS...)
Jump to navigation Jump to search
Project in Italy financed by DG Regio
Language Label Description Also known as
English
ENERGY ADJUSTMENT BEAKERS SPA
Project in Italy financed by DG Regio

    Statements

    0 references
    17,968.41 Euro
    0 references
    35,936.81 Euro
    0 references
    50.0 percent
    0 references
    27 November 2017
    0 references
    28 August 2018
    0 references
    16 July 2018
    0 references
    BECHER SPA
    0 references
    0 references

    45°43'25.86"N, 12°11'39.19"E
    0 references
    L'ANALISI DEI DATI RACCOLTI NEL CORSO DELL'AUDIT ENERGETICO HA PERMESSO DI ESCLUDERE TALUNE INIZIATIVE DI EFFICIENTAMENTO PIU' COMPLESSE DA DEFINIRE E DETTAGLIARE NEL BREVE LASSO DI TEMPO PREVISTO DAL BANDO A FAVORE DI ALTRE PIU' EVIDENTI ED EFFICACI AI FINI DELL'ENERGY SAVING COME L'INIZIATIVA GIA' INTRAPRESA DALLA DIREZIONE RIGUARDO L'EFFICIENTAMENTO DELLA CENTRALE DI PRODUZIONE VAPORE. IN VIRTU' DEL FATTO CHE IL SITO BEN SI PRESTA ALL'INSERIMENTO DI FONTI RINNOVABILI IN COPERTURA TRA LE SOLUZIONI E' STATA PROPOSTA E VALUATA ANCHE L'APPLICAZIONE DI UN IMPIANTO FOTOVOLTAICO DELLA POTENZA DI 150 KWP E TALE DA ESSERE INTERAMENTE UTILIZZATO PER IL CICLO PRODUTTIVO. VISTA LA TIPOLOGIA DEGLI AMBIENTI E' STATO POSSIBILE PROPORRE UN RELAMPING A LED PER GLI APPARECCHI ILLUMINANTI PRESENTI NEL REPARTO PRODUTTIVO. L'ADEGUAMENTO PIU' SIGNIFICATIVO RIGUARDA COMUNQUE L'AMMODERNAMENTO DELLA CENTRALE PER LA PRODUZIONE DI VAPORE SOPRATTUTTO PER LE *individuo* IN GIOCO. (Italian)
    0 references
    THE ANALYSIS OF THE DATA COLLECTED IN THE COURSE OF THE ENERGY AUDIT HAS LED TO THE EXCLUSION OF CERTAIN MORE COMPLEX EFFICIENCY INITIATIVES TO BE DEFINED AND DETAILED IN THE SHORT PERIOD OF TIME FORESEEN IN THE CALL FOR TENDERS IN FAVOUR OF OTHER CLEAR AND EFFECTIVE MEASURES FOR THE PURPOSES OF ENERGY SAVING, SUCH AS THE INITIATIVE TAKEN BY THE DIRECTORATE FOR THE EFFICIENCY OF THE POWER GENERATION PLANT. BY VIRTUE OF THE FACT THAT THE SITE IS WELL SUITED TO THE INTEGRATION OF RENEWABLE SOURCES INTO THE SOLUTIONS, THE APPLICATION OF A PHOTOVOLTAIC POWER PLANT OF 150 KWP WAS ALSO PROPOSED AND CURRENCY IS ALSO USED FOR THE PRODUCTION CYCLE. IN VIEW OF THE NATURE OF THE ENVIRONMENTS, IT WAS POSSIBLE TO PROPOSE A LED RELAMING FOR THE ILLUMINATING EQUIPMENT IN THE PRODUCTION DEPARTMENT. Adaptation of the central body for the development of central energy for the production of dangerous goods for the benefit of any individual * in GAME. (English)
    0 references

    Identifiers

    B45H17000060007
    0 references