Revision as of 04:08, 26 July 2022 by DG Regio (talk | contribs) (‎Changed label, description and/or aliases in da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et, nl, fr, de, it, es, and other parts: Adding translations: da, el, hr, ro, sk, mt, pt, fi, sl, cs, lt, lv, bg, hu, ga, sv, et,)
Jump to navigation Jump to search
Project Q85412 in Poland
Language Label Description Also known as
English
Sanitary sewage and sewage treatment plant in Staszów – Stage II
Project Q85412 in Poland

    Statements

    0 references
    21,337,987.87 zloty
    0 references
    5,121,117.09 Euro
    13 January 2020
    0 references
    25,103,515.15 zloty
    0 references
    6,024,843.64 Euro
    13 January 2020
    0 references
    85.0 percent
    0 references
    1 January 2014
    0 references
    31 December 2019
    0 references
    PRZEDSIĘBIORSTWO GOSPODARKI KOMUNALNEJ I MIESZKANIOWEJ SP. GMINY Z O.O.
    0 references
    0 references
    0 references

    50°33'40.3"N, 21°10'4.1"E
    0 references
    Projekt będzie realizowany w województwie świętokrzyskim, w aglomeracji Staszów (29.219 RLM). W ramach Projektu zostanie wybudowana kanalizacja sanitarna o długości 33 km oraz nowa biologiczno-mechaniczna oczyszczalnia ścieków o przepustowości Qśrd = 400 m3/d (4.200 RLM) w miejscowości Wiązownica Duża. W wyniku realizacji Projektu zostanie podłączonych 3.515 RLM. (Polish)
    0 references
    The project will be implemented in Świętokrzyskie Voivodship, in the Staszów agglomeration (29.219 RLM). As part of the project, a sanitary sewage system with a length of 33 km and a new biological-mechanical sewage treatment plant with Qśrd capacity = 400 m³/d (4.200 RLM) will be built in the town of Big Belt. As a result of the project, 3.515 RLM will be connected. (English)
    14 October 2020
    0 references
    Le projet sera mis en œuvre dans la voïvodie de Świętokrzyskie, dans l’agglomération de Staszów (29.219 p.e.). Le projet permettra la construction d’un système d’assainissement sanitaire d’une longueur de 33 km et d’une nouvelle station d’épuration biomécanique d’une capacité de Qśrd = 400 m³/j (4200 EH) dans le village de Wiązownica Duża. À la suite du projet, 3.515 EH seront connectés. (French)
    30 November 2021
    0 references
    Das Projekt wird in der Woiwodschaft Świętokrzyskie in der Gemeinde Staszów (29.219 S. E.) durchgeführt. Das Projekt wird im Dorf Wiązownica Duża eine sanitäre Kanalisation mit einer Länge von 33 km und eine neue biologisch-mechanische Kläranlage mit einer Kapazität von Qśrd = 400 m³/d (4.200 EW) errichten. Als Ergebnis des Projekts werden 3.515 S.E. verbunden. (German)
    7 December 2021
    0 references
    Het project zal worden uitgevoerd in het woiwodschap Świętokrzyskie, in de agglomeratie Staszów (29.219 i.e.). Het project bouwt een sanitair rioleringssysteem met een lengte van 33 km en een nieuwe biologisch-mechanische zuiveringsinstallatie met een capaciteit van Qśrd = 400 m³/d (4.200 i.e.) in het dorp Wiązownica Duża. Als gevolg van het project zal 3.515 i.e. worden aangesloten. (Dutch)
    16 December 2021
    0 references
    Il progetto sarà attuato nel voivodato di Świętokrzyskie, nell'agglomerato di Staszów (2 919 a.e.). Il progetto costruirà un sistema fognario sanitario di 33 km di lunghezza e un nuovo impianto di trattamento delle acque reflue biologico-meccanico con una capacità di Qśrd = 400 m³/giorno (4 200 a.e.) nel villaggio di Wiązownica Duża. A seguito del progetto, saranno collegati 3 515 a.e. (Italian)
    16 January 2022
    0 references
    El proyecto se ejecutará en el voivodato de Świętokrzyskie, en la aglomeración de Staszów (29.219 e-h). El proyecto construirá un sistema sanitario de alcantarillado con una longitud de 33 km y una nueva depuradora biomecánica de aguas residuales con una capacidad de Qśrd = 400 m³/d (4.200 e-h) en el pueblo de Wiązownica Duża. Como resultado del proyecto, se conectarán 3.515 e-h. (Spanish)
    19 January 2022
    0 references
    Projektet vil blive gennemført i ÅwiÄtokrzyskie Voivodship i byområdet Staszów (29.219 RLM). Som en del af projektet vil der blive bygget et kloaksystem med en længde på 33 km og et nyt biologisk-mekanisk spildevandsrensningsanlæg med QÅrd-kapacitet = 400 m³/d (4.200 RLM) i byen Big Belt. Som et resultat af projektet vil 3.515 RLM blive forbundet. (Danish)
    26 July 2022
    0 references
    Το έργο θα υλοποιηθεί στο βοεβοδάτο ÅwiÄtokrzyskie, στον οικισμό Staszów (29.219 RLM). Στο πλαίσιο του έργου θα κατασκευαστεί στην πόλη Big Belt ένα σύστημα αποχέτευσης με μήκος 33 km και μια νέα μονάδα βιολογικής-μηχανικής επεξεργασίας λυμάτων χωρητικότητας QÅrd = 400 m³/d (4.200 RLM). Ως αποτέλεσμα του έργου, θα συνδεθούν 3.515 RLM. (Greek)
    26 July 2022
    0 references
    Projekt će se provoditi u ÅwiÄtokrzyskom vojvodstvu, u aglomeraciji Staszó³w (29.219 RLM). U sklopu projekta izgradit će se sustav sanitarnih otpadnih voda duljine 33 km i novo biološko-mehaničko postrojenje za pročišćavanje otpadnih voda s kapacitetom QÅrd = 400 m³/d (4.200 RLM) u gradu Velikom pojasu. Kao rezultat projekta bit će spojeno 3.515 RLM-a. (Croatian)
    26 July 2022
    0 references
    Proiectul va fi implementat în Voievodatul ÅwiÄtokrzyskie, în aglomerarea Staszów (29.219 RLM). Ca parte a proiectului, în orașul Centura Mare se va construi un sistem sanitar de canalizare cu o lungime de 33 km și o nouă stație de epurare a apelor uzate biologic-mecanice cu capacitate QÅrd = 400 m³/d (4.200 RLM). Ca urmare a proiectului, 3.515 RLM va fi conectat. (Romanian)
    26 July 2022
    0 references
    Projekt sa bude realizovať v ÅwiÄtokrzyskie vojvodstve v aglomerácii Staszów (29.219 RLM). V rámci projektu bude v meste Big Belt vybudovaná sanitárna kanalizačná sústava s dĺžkou 33 km a nová biomechanická čistička odpadových vôd s kapacitou QÅrd = 400 m³/d (4,200 RLM). V dôsledku projektu bude pripojených 3,515 RLM. (Slovak)
    26 July 2022
    0 references
    Il-proġett se jiġi implimentat f’ÅwiÄ‹tokrzyskie Voivodship, fl-agglomerazzjoni ta’ Staszów (29.219 RLM). Bħala parti mill-proġett, sistema sanitarja tad-drenaġġ b’tul ta’ 33 km u impjant tat-trattament tad-drenaġġ bijoloġiku-mekkaniku ġdid b’kapaċità QÅrd = 400 m³/d (4.200 RLM) se jinbnew fil-belt ta’ Big Belt. B’riżultat tal-proġett, 3.515 RLM ser ikunu konnessi. (Maltese)
    26 July 2022
    0 references
    O projeto será executado na voivodia de ÅwiÄtokrzyskie, na aglomeração Staszów (29.219 RLM). Como parte do projeto, será construído um sistema de esgoto sanitário com um comprimento de 33 km e uma nova estação de tratamento de esgoto biomecânico com capacidade de QÅrd = 400 m³/d (4.200 RLM) na cidade de Big Belt. Como resultado do projeto, 3.515 RLM serão conectados. (Portuguese)
    26 July 2022
    0 references
    Hanke toteutetaan ÅwiÄtokrzyskien voivodikunnassa Staszów’n taajamassa (29.219 RLM). Osana hanketta rakennetaan 33 km pitkä saniteettijätevesijärjestelmä ja uusi biologisesti mekaaninen jäteveden käsittelylaitos, jonka kapasiteetti QÅrd on 400 m³/d (4.200 RLM) Big Beltin kaupungissa. Hankkeen tuloksena kytketään 3,515 RLM. (Finnish)
    26 July 2022
    0 references
    Projekt se bo izvajal v ÅwiÄtokrzyskie Voivodship, v aglomeraciji Staszów (29.219 RLM). V okviru projekta bosta v mestu Big Belt zgrajena sanitarni kanalizacijski sistem dolžine 33 km in nova biološko-mehanska čistilna naprava z zmogljivostjo QÅrd = 400 m³/d (4.200 RLM). Kot rezultat projekta bo povezanih 3,515 RLM. (Slovenian)
    26 July 2022
    0 references
    Projekt bude realizován v ÅwiÄtokrzyskie Voivodship, v aglomeraci Staszów (29.219 RLM). V rámci projektu bude ve městě Big Belt postavena sanitární kanalizace o délce 33 km a nová biologicky-mechanická čistírna odpadních vod s kapacitou QÅrd = 400 m³/d (4,200 RLM). Výsledkem projektu bude připojení 3.515 RLM. (Czech)
    26 July 2022
    0 references
    Projektas bus įgyvendinamas ÅwiÄ-tokrzyskie vaivadijoje, Staszów aglomeracijoje (29.219 RLM). Įgyvendinant projektą, Didžiojo Belto mieste bus pastatyta 33 km ilgio sanitarinė nuotekų sistema ir nauji biologinio-mechaninio nuotekų valymo įrenginiai, kurių QÅrd talpa = 400 m³/d (4.200 RLM). Įgyvendinus projektą, bus sujungta 3.515 RLM. (Lithuanian)
    26 July 2022
    0 references
    Projekts tiks īstenots Švitokržijas vojevodistē, Staszó³w aglomerācijā (29.219 RLM). Projekta ietvaros Big Belt pilsētā tiks uzbūvēta 33 km gara sanitārā kanalizācijas sistēma un jauna bioloģiski mehāniskā notekūdeņu attīrīšanas iekārta ar QÅrd jaudu = 400 m³/d (4200 RLM). Projekta rezultātā tiks savienots 3,515 RLM. (Latvian)
    26 July 2022
    0 references
    Проектът ще бъде изпълнен във ÅwiÄtokrzyskie Voivodship в агломерацията Staszów (29 219 RLM). Като част от проекта в град Големия пояс ще бъде изградена санитарна канализационна система с дължина 33 км и нова биологично-механична пречиствателна станция с капацитет QÅrd = 400 m³/d (4,200 RLM). В резултат на проекта ще бъдат свързани 3.515 RLM. (Bulgarian)
    26 July 2022
    0 references
    A projekt ÅwiÄtokrzyskie vajdaságban, a Staszúw agglomerációban (29.219 RLM) valósul meg. A projekt részeként egy 33 km hosszú egészségügyi szennyvízrendszert és egy új biológiai-mechanikai szennyvíztisztító telepet építenek, amelynek kapacitása = 400 m³/nap (400 m³/nap) (4.200 RLM). A projekt eredményeként 3,515 RLM lesz csatlakoztatva. (Hungarian)
    26 July 2022
    0 references
    Cuirfear an tionscadal i bhfeidhm in ÅwiÄtokrzyskie Voivodship, sa cheirtleán Staszó³w (29.219 RLM). Mar chuid den tionscadal, tógfar córas séarachais sláintíochta le fad 33 km agus gléasra cóireála séarachais nua bitheolaíoch le toilleadh QÅrd = 400 m³/d (4.200 RLM) i mbaile Big Belt. Mar thoradh ar an tionscadal, beidh 3.515 RLM ceangailte. (Irish)
    26 July 2022
    0 references
    Projektet kommer att genomföras i vojvodskapet ÅwiÄtokrzyskie, i tätorten Staszów (29.219 RLM). Som en del av projektet byggs ett avloppssystem med en längd av 33 km och en ny biologisk-mekanisk avloppsreningsanläggning med QÅrd kapacitet = 400 m³/d (4.200 RLM) i staden Big Belt. Som ett resultat av projektet kommer 3.515 RLM att anslutas. (Swedish)
    26 July 2022
    0 references
    Projekt viiakse ellu ÅwiÄtokrzyskie vojevoodkonnas Staszów linnastus (29.219 RLM). Projekti raames ehitatakse Big Belti linna 33 km pikkune sanitaarreoveesüsteem ja uus bioloogiline ja mehaaniline reoveepuhasti QÅrd võimsusega 400 m³/d (4.200 RLM). Projekti tulemusena ühendatakse 3,515 RLM-i. (Estonian)
    26 July 2022
    0 references

    Identifiers

    POIS.02.03.00-00-0163/16
    0 references