Improved tertiary nodes Turnu Magurele - Nikopole for sustainable development of the region, for a better connection to TEN-T infrastructure (Q4300957)

From EU Knowledge Graph
Revision as of 22:25, 24 June 2022 by DG Regio (talk | contribs) (‎Changed an Item: Change because item Q4373720 was merged with Q4370415)
Jump to navigation Jump to search
Project Q4300957 in Romania, Bulgaria
Language Label Description Also known as
English
Improved tertiary nodes Turnu Magurele - Nikopole for sustainable development of the region, for a better connection to TEN-T infrastructure
Project Q4300957 in Romania, Bulgaria

    Statements

    0 references
    0 references
    0 references
    0 references
    6,063,495.31 Euro
    0 references
    7,133,523.89 Euro
    0 references
    85.0 percent
    0 references
    9 June 2017
    0 references
    30 April 2022
    0 references
    Turnu Magurele Town
    0 references
    0 references
    0 references

    43°45'7.96"N, 24°51'49.32"E
    0 references

    43°42'3.10"N, 24°53'40.78"E
    0 references
    I-TeN project is developed by Turnu Magurele and Nikopole municipalities addressing common problems: the poor connection with TENT core and comprehensive network because of under-developed road infrastructure, with a high risk of accidents, and have insufficient capacity. The problems are important at national level, national institutions in the field supporting I-TeN especially in the perspective of a new bridge. The general objective of I-TeN is to improve the development of cross-border transport system of the Turnu Magurele – Nikopole tertiary nodes in a better connection with TENT infrastructure for sustainable development of the area. One of the specific objectives is to improve the transport infrastructure of the both tertiary nodes: 10 streets along and/or at the intersection of several national roads (DN52, DN51A), which are taking over the national and international traffic and a municipal road PVN 3123. Two joint mechanism will be developed: joint traffic management and a common information system for public transport. The main activities includes elaboration of technical documentations, works contracts, traffic management plan and purchasing the equipment; a specific study, a conference and a workshops for public transport operators in order to generate a common system for passengers. The expected result is: 29,865 population served by modernized infrastructure leading to TENT and the output indicators are total length of 12,223 km modernized and 2 joint mechanisms. The total budget is 7,292,395.76 euro. (English)
    0 references

    Identifiers

    0 references