Prevention and cross border management of landslides risk (Q4301924)

From EU Knowledge Graph
Revision as of 21:25, 24 June 2022 by DG Regio (talk | contribs) (‎Changed an Item: Change because item Q4387436 was merged with Q4384553)
Jump to navigation Jump to search
Project Q4301924 in France, Andorra, Spain
Language Label Description Also known as
English
Prevention and cross border management of landslides risk
Project Q4301924 in France, Andorra, Spain

    Statements

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    673,493.53 Euro
    0 references
    1,042,144.82 Euro
    0 references
    64.63 percent
    0 references
    1 November 2019
    0 references
    1 June 2022
    0 references
    Universitat Politècnica de Catalunya
    0 references
    0 references
    0 references
    Q4391396 (Deleted Item)
    0 references

    42°27'10.66"N, 1°29'30.55"E
    0 references

    41°21'49.00"N, 2°9'8.60"E
    0 references

    44°53'8.52"N, 0°44'30.30"W
    0 references

    41°23'21.37"N, 2°6'56.66"E
    0 references

    47°49'47.75"N, 1°56'17.88"E
    0 references
    Landslides in the Pyrenees cause continuous damage to roads, dams, villages and activities. The objective of the project is to develop and implement two tools to reduce and manage the risk associated with these dangers. It will focus on the dangers with most consequences in the territory: large landslides involving complete slopes overled by towns, infrastructures and activities and susceptible to accelerate and end into a catastrophic failure; the multiple landslides caused by episodes of intense rainfalls that simultaneously affect large areas of the territory (MORLES crisis). Cross-border methodologies are proposed in the project to assess the risk associated with these two types of dangers, as well as tools to quantify, forecast and manage it. The tools will be validated on real events in pilot sites and can be afterwards applied to other areas and / or future climatic scenarios. One result of the project is to reduce the exposure of people in these areas to the risk of landslides (around 35,000 people). A second result includes: the development of a MORLES crisis simulator designed to provide and help Civil Protection authorities to manage crises of this type and the installation in the territory of survey and warning systems for large landslides. (English)
    0 references

    Identifiers

    0 references