(A19_093_2016_0930040_1038) E.E. (Q2066474)
Jump to navigation
Jump to search
Project in Italy financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | (A19_093_2016_0930040_1038) E.E. |
Project in Italy financed by DG Regio |
Statements
26,552.54 Euro
0 references
53,105.07 Euro
0 references
50.0 percent
0 references
14 September 2016
0 references
10 December 2018
0 references
14 September 2018
0 references
ECO-TECH FINISH S.R.L.
0 references
Q291255 (Deleted Item)
0 references
L PROGETTO MIRA A RAZIONALIZZARE I CONSUMI ENERGETICI DELL'INTERO FABBRICATO, DI CUI LA ECO-TECH ? AFFITTUARIO, OPERANDO SPECIALMENTE NEL MIGLIORAMENTO DELLA DOTAZIONE IMPIANTISTICA A SERVIZIO DEGLI IMPIANTI DI CLIMATIZZAZIONE INVERNALE ED ESTIVA, DI PRODUZIONE DELL'A.C.S. E DELL'ILLUMINAZIONE. GLI INTERVENTI SULL'INVOLUCRO SONO LIMITATI ALLA SOSTITUZIONE DI PARTE DEGLI INFISSI, ORMAI OBSOLETI E NON FUNZIONANTI. LA ECOTECH FINISH SRL ? UNA AZIENDA CHE OPERA NEL SETTORE DELLA LAVORAZIONE DI MANUFATTI MEDIANTE L?APPORTO DI METALLI ESTERNI DI FINITURA, DEPOSTI MEDIANTE PROCESSI GALVANICI REALIZZATI NELLO STABILIMENTO SITO IN LOC. SAN ZENO, STRADA C 27, AREZZO. VISTI I CONSUMI CONTEMPORANEI DI ENERGIA ELETTRICA E DI CALORE, VIENE PROPOSTO UN INTERVENTO DI EFFICIENTAMENTO ENERGETICO DELL?IMMOBILE, COSTITUITO: 1. DALLA INSTALLAZIONE DI UN COGENERATORE DELLE POTENZA ELETTRICA DI 20 KW E TERMICA DI 39 KW; 2. DALLA INSTALLAZIONE DI UN IMPIANTO SOLARE TERMICO; 3. DALLA SOSTITUZIONE DI UNA PARTE (Italian)
0 references
DOES THE PROJECT AIM AT RATIONALISING THE ENERGY CONSUMPTION OF THE ENTIRE BUILDING, OF WHICH ECOT-TECH? LESSEE, IN PARTICULAR BY IMPROVING THE EQUIPMENT USED FOR HEATING SYSTEMS IN THE WINTER AND SUMMER HEATING SYSTEMS, PRODUCTION OF THE A.C.S. AND LIGHTING. INTERVENTION ON THE ENVELOPE IS LIMITED TO REPLACING SOME OF THE FRAMES, WHICH ARE NOW OBSOLETE AND ARE NOT FUNCTIONING. ECOTECH FINISH SRL? A HOLDING ACTIVE IN THE MANUFACTURING OF MANUFACTURED GOODS THROUGH THE SUPPLY OF EXTERNAL FINISHING METALS, WHICH ARE LAID DOWN BY GALVANIC PROCESSES CARRIED OUT AT THE SITE IN THE LOC. SAN ZENO, ROAD C 27, AREZZO. IN VIEW OF THE SIMULTANEOUS CONSUMPTION OF ELECTRICITY AND HEAT, IS THE ENERGY EFFICIENCY OF THE BUILDINGS PROPOSED, NAMELY: 1 THE INSTALLATION OF A POWER GENERATOR OF 20 KW AND A THERMAL POWER OF 39 KW; 2 THE INSTALLATION OF A SOLAR HEATING SYSTEM; 3 REPLACING A PARTY (English)
0 references
Identifiers
D58I16002230009
0 references