111_MUROS_411_IMPROVING THE EFFICIENCY OF THE HOST BUILDING, THE LIBRARY AND THE CULTURAL CENTRE (Q2155012)

From EU Knowledge Graph
Revision as of 11:40, 23 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): THERMAL INSULATION, INSTALLATION OF AIR CONDITIONING SYSTEMS, EFFICIENCY OF ENERGY PRODUCTION SYSTEMS OF HOT WATER........., Adding English summary)
Jump to navigation Jump to search
Project in Italy financed by DG Regio
Language Label Description Also known as
English
111_MUROS_411_IMPROVING THE EFFICIENCY OF THE HOST BUILDING, THE LIBRARY AND THE CULTURAL CENTRE
Project in Italy financed by DG Regio

    Statements

    0 references
    179,069.0 Euro
    0 references
    358,138.0 Euro
    0 references
    50.0 percent
    0 references
    31 December 2018
    0 references
    28 February 2020
    0 references
    COMUNE DI MUROS
    0 references

    40°40'41.02"N, 8°37'2.35"E
    0 references
    OPERE ISOLAMENTO TERMICO, INSTALLAZIONE DI IMPIANTI CLIMATIZZAZIONE, EFFICIENTAMENTO DEI SISTEMI DI PRODUZIONE DI ACQUA CALDA......... (Italian)
    0 references
    THERMAL INSULATION, INSTALLATION OF AIR CONDITIONING SYSTEMS, EFFICIENCY OF ENERGY PRODUCTION SYSTEMS OF HOT WATER......... (English)
    0 references

    Identifiers