MUNICIPALITY OF BRONTE — UPGRADING OF THE SCHOOL BUILDING “G. MAZZINI” WITH THE RULES ON ELIGIBILITY AND SAFETY OF INSTALLATIONS (Q2054252)

From EU Knowledge Graph
Revision as of 10:12, 23 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): INSTALLATION OF THE FIRE-FIGHTING SYSTEM, REPLACEMENT OF INTERIOR AND EXTERIOR WINDOWS, REVISION OF ROOF COVERING, REVISION OF THE EXTERNAL RENDERING (FACADE), ETC., Adding English summary)
Jump to navigation Jump to search
Project in Italy financed by DG Regio
Language Label Description Also known as
English
MUNICIPALITY OF BRONTE — UPGRADING OF THE SCHOOL BUILDING “G. MAZZINI” WITH THE RULES ON ELIGIBILITY AND SAFETY OF INSTALLATIONS
Project in Italy financed by DG Regio

    Statements

    0 references
    412,886.03 Euro
    0 references
    6 October 2017
    0 references
    27 December 2019
    0 references
    COMUNE DI BRONTE
    0 references
    0 references

    37°47'13.78"N, 14°50'1.82"E
    0 references
    REALIZZAZIONE IMPIANTO ANTINCENDIO, SOSTITUZIONE INFISSI INTERNI ED ESTERNI, REVISIONE TETTO DI COPERTURA, RIFACIMENTO INTONACO ESTERNO (FACCIATA) ETC. (Italian)
    0 references
    INSTALLATION OF THE FIRE-FIGHTING SYSTEM, REPLACEMENT OF INTERIOR AND EXTERIOR WINDOWS, REVISION OF ROOF COVERING, REVISION OF THE EXTERNAL RENDERING (FACADE), ETC. (English)
    0 references

    Identifiers

    D94H15000300002
    0 references