(10360.14072017.115000303) SECONDARY SCHOOL LEVENE (Q2057138)

From EU Knowledge Graph
Revision as of 10:07, 23 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): THE PROJECT INVOLVES THE FOLLOWING WORK: DISMANTLING OF ALL EXTERNAL WINDOWS AND DOORS OF THE WINDOWS OF THE MAIN ROOMS AND THE MAIN ENTRANCE PORT; CONSTRUCTION OF AN INSULATING SYSTEM FOR CAPOTTO CAPOTTO FOR OUTSIDE BUILDINGS APPROVED IN ACCORDANCE WITH THE ETAG 004 LEGISLATION; FITTING OF NEW ALUMINIUM CUTTING FRAMES (TOTAL VALUE OF 1,3 W/M²??); CONSTRUCTION OF A NEW COVER MADE WITH VERTICAL AND TRANSVERSE SUPPORTS MADE OF STEEL, WITH OVER GAL...)
Jump to navigation Jump to search
Project in Italy financed by DG Regio
Language Label Description Also known as
English
(10360.14072017.115000303) SECONDARY SCHOOL LEVENE
Project in Italy financed by DG Regio

    Statements

    0 references
    140,955.16 Euro
    0 references
    469,850.53 Euro
    0 references
    30.0 percent
    0 references
    3 April 2018
    0 references
    3 April 2020
    0 references
    16 November 2020
    0 references
    COMUNE DI MONTEVARCHI
    0 references
    0 references

    43°46'11.53"N, 11°15'20.09"E
    0 references
    IL PROGETTO PREVEDE LE SEGUENTI LAVORAZIONI :SMONTAGGIO DI TUTTI SERRAMENTI ESTERNI COMPRESO LE PORTE FINESTRE DELLE AULE ED IL PORTONE DI INGRESSO PRINCIPALE;REALIZZAZIONE DI SISTEMA ISOLANTE A CAPPOTTO PER ESTERNI OMOLOGATO AI SENSI DELLA NORMATIVA ETAG 004;MONTAGGIO DEI NUOVI INFISSI IN ALLUMINIO TAGLIO TERMICO ( VALORE TOTALE SERRAMENTO 1,3 W/MQ K?);REALIZZAZIONE DI UNA NUOVA COPERTURA REALIZZATA CON SOSTEGNI VERTICALI E TRAVERSI IN ACCIAIO, CON SOVRASTANTE LAMIERA GRECATA IN ACCIAIO ZINCATO E RIVESTITO A FORMARE LE FALDE, REALIZZAZIONE DI UNO STRATO COIBENTE ALL?ESTRADOSSO DEL SOLAIO PIANO FORMATO DA PANNELLI IN POLIURETANO. CAPPOTTO ESTERNO COIBENTAZIONE: REALIZZAZIONE DI SISTEMA A CAPPOTTO PER FACCIATE ESTERNE DOTATO DI OMOLOGAZIONE DOTATO DI OMOLOGAZIONE AI SENSI DELLA NORMATIVA ETAG 004 E CHE PRESENTI PRESTAZIONI MISURATE NEL RISPETTO DELLE NORME UNI EN 13499 E UNI 13163, SPESSORE 100 MM.SOSTITUZIONE INFISSI ESTERNI: PORTONE PER INGRESSO A DUE ANTE CON TELAIO E SOPRALUCE FISSO (Italian)
    0 references
    THE PROJECT INVOLVES THE FOLLOWING WORK: DISMANTLING OF ALL EXTERNAL WINDOWS AND DOORS OF THE WINDOWS OF THE MAIN ROOMS AND THE MAIN ENTRANCE PORT; CONSTRUCTION OF AN INSULATING SYSTEM FOR CAPOTTO CAPOTTO FOR OUTSIDE BUILDINGS APPROVED IN ACCORDANCE WITH THE ETAG 004 LEGISLATION; FITTING OF NEW ALUMINIUM CUTTING FRAMES (TOTAL VALUE OF 1,3 W/M²??); CONSTRUCTION OF A NEW COVER MADE WITH VERTICAL AND TRANSVERSE SUPPORTS MADE OF STEEL, WITH OVER GALVANISED STEEL SHEETS, COATED AND COVERED TO FORM THE GROUNDWATER, REALISATION OF A LAYER OF INSULATION MADE FROM POLYURETHANE PANELS. EXTERNAL ENCLOSURE INSULATION: CONSTRUCTION OF A CAPOTTO SYSTEM FOR EXTERNAL FAÇADES WITH APPROVAL TO THE ETAG 004 LEGISLATION AND TO CARRY OUT MEASURED PERFORMANCE IN ACCORDANCE WITH THE PROVISIONS OF UNI EN 13499 AND UNI 13163, THICKNESS 100 EXTERNAL WINDOW DOORS: HOLDER WITH FRAME ENTRANCE TO TWO CHASSIS AND SOPRALUCE FIXED (English)
    0 references

    Identifiers