ITI OLBIA SUB-ACTION 1.2 — WORKS ON THE CYCLE AND PEDESTRIAN PATH FROM THE RAIL BRIDGE TO THE AIRPORT (Q2053222)

From EU Knowledge Graph
Revision as of 10:02, 23 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): SUB-ACTION PROVIDES FOR THE CONSTRUCTION OF A CYCLE AND PEDESTRIAN PATHWAY IN THE SECTION BETWEEN THE RAIL BRIDGE AND THE AIRPORT COSTA SMERALDA. THE TRACK WILL COVER THE WIDTH OF 4 MT, OF WHICH 2,50 MT FOR THE CYCLE TRAIL AND 1,50 MT FOOTPATH, Adding English summary)
Jump to navigation Jump to search
Project in Italy financed by DG Regio
Language Label Description Also known as
English
ITI OLBIA SUB-ACTION 1.2 — WORKS ON THE CYCLE AND PEDESTRIAN PATH FROM THE RAIL BRIDGE TO THE AIRPORT
Project in Italy financed by DG Regio

    Statements

    0 references
    834,722.5 Euro
    0 references
    1,669,445.0 Euro
    0 references
    50.0 percent
    0 references
    2 October 2017
    0 references
    29 February 2020
    0 references
    COMUNE DI OLBIA
    0 references
    0 references

    40°57'15.59"N, 9°28'34.10"E
    0 references
    LA SUB-AZIONE PREVEDE LA REALIZZAZIONE DI UN PERCORSO CICLOPEDONALE NEL TRATTO COMPRESO TRA IL PONTE FERRO E L'AEROPORTO COSTA SMERALDA. IL PERCORSO AVRà LA LARGHEZZA DI 4 MT, DI CUI 2,50 MT PER LA PISTA CICLABILE E 1,50 MT PERCORSO PEDONALE (Italian)
    0 references
    SUB-ACTION PROVIDES FOR THE CONSTRUCTION OF A CYCLE AND PEDESTRIAN PATHWAY IN THE SECTION BETWEEN THE RAIL BRIDGE AND THE AIRPORT COSTA SMERALDA. THE TRACK WILL COVER THE WIDTH OF 4 MT, OF WHICH 2,50 MT FOR THE CYCLE TRAIL AND 1,50 MT FOOTPATH (English)
    0 references

    Identifiers

    F71B17000490001
    0 references
    0 references