Sewerage Klentnice (Q60295)

From EU Knowledge Graph
Revision as of 13:42, 24 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Jump to navigation Jump to search
Project Q60295 in Czech Republic
Language Label Description Also known as
English
Sewerage Klentnice
Project Q60295 in Czech Republic

    Statements

    0 references
    26,800,669.64 Czech koruna
    0 references
    1,072,026.79 Euro
    10 January 2020
    0 references
    42,040,266.1 Czech koruna
    0 references
    1,681,610.64 Euro
    10 January 2020
    0 references
    63.75 percent
    0 references
    6 September 2017
    0 references
    31 May 2020
    0 references
    Obec Klentnice
    0 references
    0 references
    0 references

    48°49'18.34"N, 16°38'44.34"E
    0 references
    69201
    0 references
    Výstavba oddílné kanalizace s čerpání splaškových vod na ČOV Mikulov. (Czech)
    0 references
    Construction of sewage sewerage with pumping of sewage water at the Mikulov WWTP. (English)
    23 October 2020
    0 references
    Construction d’un système d’assainissement séparé avec pompage des eaux usées à la station d’épuration de Mikulov. (French)
    28 November 2021
    0 references
    Bau einer separaten Kanalisation mit dem Pumpen von Abwasser am Mikulov WWTP. (German)
    2 December 2021
    0 references
    Bouw van een apart rioleringssysteem met het pompen van rioolwater bij de Mikulov WWTP. (Dutch)
    13 December 2021
    0 references
    Costruzione di un sistema fognario separato con il pompaggio di acqua di scarico presso il Mikulov WWTP. (Italian)
    14 January 2022
    0 references
    Construcción de un sistema de alcantarillado separado con el bombeo de aguas residuales en la EDAR Mikulov. (Spanish)
    15 January 2022
    0 references

    Identifiers

    CZ.05.1.30/0.0/0.0/16_042/0004697
    0 references