URGENT WORK TO SECURE, RESTORE AND CONSOLIDATE AS A RESULT OF AN EMERGENCY RESPONSE TO THE SAFETY, REHABILITATION AND REHABILITATION OF THE S. P. 143 MOUNTAIN AREA AND ABATEMARCO, EMERGENCY CIVIL PROTECTION OPERATIONS. (Q2023237)

From EU Knowledge Graph
Revision as of 09:24, 23 March 2020 by DG Regio (talk | contribs) (‎Created claim: summary (P836): THE AIM OF THE INTERVENTION IS TO SECURE PART OF THE ROAD SECTION OF THE SP 143 BY ACTING ON THE SUPPORT STRUCTURES OF THE PLANE RACK IN CONNECTION WITH THE BREAKOUT MOVEMENT, WHICH AFFECTS THE ROAD IN AT LEAST TWO POINTS OF THE ROAD, WHICH COVERS THE ROAD IN AT LEAST TWO PARTS OF THE ROAD. A PARTITION OF STAKES IS TO BE CARRIED OUT IN ORDER TO CURB THE VALLEY AND WILL COMBINE UP TO AN EARLIER STAGE BY WORKS WHICH ARE SUITABLE FOR THE PROPER MAN...)
Jump to navigation Jump to search
Project in Italy financed by DG Regio
Language Label Description Also known as
English
URGENT WORK TO SECURE, RESTORE AND CONSOLIDATE AS A RESULT OF AN EMERGENCY RESPONSE TO THE SAFETY, REHABILITATION AND REHABILITATION OF THE S. P. 143 MOUNTAIN AREA AND ABATEMARCO, EMERGENCY CIVIL PROTECTION OPERATIONS.
Project in Italy financed by DG Regio

    Statements

    0 references
    337,500.0 Euro
    0 references
    450,000.0 Euro
    0 references
    75.0 percent
    0 references
    3 October 2016
    0 references
    29 October 2018
    0 references
    PROVINCIA DI SALERNO
    0 references

    40°9'44.28"N, 15°21'55.66"E
    0 references
    L'INTERVENTO SI IDENTIFICA CON LA MESSA IN SICUREZZA DI PORZIONE DEL TRACCIATO STRADALE DELLA SP 143, INTERVENENDO SULLE STRUTTURE DI SOSTEGNO DEL PIANO CARRABILE IN CORRISPONDENZA DEL MOVIMENTO FRANOSO CHE INTERESSA LA STRADA IN ALMENO DUE PUNTI TRANCIANDOLA COMPLETAMENTE. SI PREVEDE LA REALIZZAZIONE DI UNA PARATIA DI PALI A CONTENIMENTO DEL FRONTE FRANA A VALLE E GABBIONATE PIù A MONTE COMPLETATE DA OPERE ATTE AD UNA CORRETTA REGIMENTAZIONE DELLE ACQUE SUPERFICIALI. (Italian)
    0 references
    THE AIM OF THE INTERVENTION IS TO SECURE PART OF THE ROAD SECTION OF THE SP 143 BY ACTING ON THE SUPPORT STRUCTURES OF THE PLANE RACK IN CONNECTION WITH THE BREAKOUT MOVEMENT, WHICH AFFECTS THE ROAD IN AT LEAST TWO POINTS OF THE ROAD, WHICH COVERS THE ROAD IN AT LEAST TWO PARTS OF THE ROAD. A PARTITION OF STAKES IS TO BE CARRIED OUT IN ORDER TO CURB THE VALLEY AND WILL COMBINE UP TO AN EARLIER STAGE BY WORKS WHICH ARE SUITABLE FOR THE PROPER MANAGEMENT OF SURFACE WATERS. (English)
    0 references

    Identifiers

    H47H14002270006
    0 references