Renovation of existing drainage systems in Tótvázsony settlement, construction of new open and closed channels (Q3949217)

From EU Knowledge Graph
Revision as of 03:28, 15 February 2022 by DG Regio (talk | contribs) (‎Removed claims)
Jump to navigation Jump to search
Project Q3949217 in Hungary
Language Label Description Also known as
English
Renovation of existing drainage systems in Tótvázsony settlement, construction of new open and closed channels
Project Q3949217 in Hungary

    Statements

    0 references
    1 June 2017
    0 references
    29 June 2021
    0 references
    TÓTVÁZSONY KÖZSÉG ÖNKORMÁNYZATA
    0 references
    0 references

    47°1'46.70"N, 17°47'23.50"E
    0 references
    A fejlesztés során Tótvázsony település meglévő vízelvezető rendszereinek a felújítása, valamint új nyílt és zárt csatornák kiépítése fog megtörténni. Az elvezetett vizet a jelenleg is működő helyi vízfolyásokba fogjuk bevezetni, valamint egy helyen kialakításra kerül egy víztározó, ami a felfogott víz későbbi felhasználását teszi lehetővé. A fejlesztés során 1950 méter nyílt árok kerül kialakításra. Ahol lehetséges nyílt árok kialakítását tervezzük, mert ezek fenntartása, működtetése sokkal jobban megoldható mint a zárt árkoké. 380 méter zárt csatorna kerül kialakításra, mert vannak olyan területek, - pl. magánudvarok -, ahol nyílt árok kialakítása nem lehetséges, ezért szükséges a zárt rendszerek kiépítése, 135 méter rácsos folyóka. 980 méter jelenleg rossz állapotban lévő árok helyreállítása fog megtörténni. Összesen 3 445 méter csapadékvíz elvezető csatorna készül a projektben. Problémák és megoldási tervek 1. Az Iskola utca keleti végében a 653 hrsz. önkormányzati ingatlan keleti szélén húzódó lokális völgyön keresztül a környező szántóterületekről lefolyó víz hevesebb csapadéktevékenység esetén elönti az utat, udvarokat, pincéket. Megoldás A szántófölddel határos 653 hrsz.-ú önkormányzati ingatlan keleti felén egy árkot kell létesíteni mintegy 80 fm hosszúságban. Ezt az árkot be kell kötni a Hidegkúti út árkába, ami a vizet levezeti a Keleti patakba. Az útárokba vezetés előtt egy hordalékfogó aknát is kell kialakítani, hogy a szántókról lemosott föld ne az útárkot terhelje. A Hidegkút felé vezető út mentén lévő árok kialakítását korrigálni kell. Az árok oldalait rézsűsen kell kialakítani, és füvesíteni kell. 2. Az Iskola utca nyugati végében a Kereszt utcai csomópont környékén az Iskola utcai árok megszűnik. Ez azt eredményezi, hogy az Iskola utca burkolatán lefolyó csapadékvíz elönti a kapubejárókon keresztül a Kereszt utca 6. (202 hrsz.), 7. (196 hrsz.) szám alatti, az utca szintjénél mélyebben fekvő ingatlanokat. A Kereszt utca déli felében a további ingatlanok kapubejáróihoz már került némi szegély a víz eltereléséhez, azonban nagyobb intenzitású csapadék esetén ezek a művek nem elegendőek. Veszélyeztetve van továbbá a Kereszt utca déli végében lévő Kereszt utca 1. (228 hrsz.) ingatlan. Megoldás Ki kell építeni a hiányzó csapadékvíz elvezető műveket az Iskola és a Kereszt utcákban. 3. Szintén az Iskola utcáról nyíló Telep utca déli része (96 hrsz.) azért problémás, mert ezen a területen halad át egy kisebb lokális völgy, amelyen keresztül, és a Telep u. 11. sz. (112 hrsz.) ingatlanon átvezetett 111 hrsz.-ú árkon át lefolyó csapadékvíz elönti a Telep utca 121és 122 hrsz.-ú ingatlanán álló 2/1, 2/2 és a 3/1, 3/2 számú épületeket. Megoldás Egyrészt csökkenteni kellene a Telep utcára jutó csapadékvíz mennyiségét úgy, hogy az Iskola utcai csomópontban rácsos víznyelőt kell beépíteni és a meglévő 600-as csőbe való bekötésével csökkentjük a Telep utca terhelését. Szintén a Telep utca csapadékterhelésének csökkentésére a Telep utca keleti végében az István utca végén lévő övárokhoz hasonló árokkal a külterületi vizeket kell a terepen levezetni. A maradék csapadékvizet a Telep utcán kiépített árokkal vagy zárt csatornával lehet elvezetni a Kereszt utca felé. 4. A Magyar utca déli végében épült lakóházakat (777/2-5 hrsz.-ú ingatlanok) a Balatonszőlősi útra keleti irányból becsatlakozó 0292/11 hrsz.-ú földútról lefolyó víz veszélyezteti. Megoldás A földútról lefolyó vizet meg kell osztani. A vízválasztótól keletre lévő útszakaszról a Keleti patak völgyébe lehet a vizet elvezetni, a vízválasztótól nyugatra pedig a közút árkába lehet a vizet vezetni. Ehhez megfelelő szelvényűre ki kell építeni mind a földút, mind pedig a közút árkát. Tervezéssel kell meghatározni a szükséges árok méreteket. 5. Problémát jelent a Hajnal utca-Virág utca csomópontjában a Hajnal utcával párhuzamosan, a Bodonkúti patakig vezetett zárt csatorna állapota. Ez a cső vélhetőleg teljesen be van iszapolódva, funkcióját nem látja el. A Hajnal utca északi felén húzódó csapadékvíz elvezető ároknak ez a cső a továbbvezetése, azonban mivel ez a cső nem funkcionál, ezért a Hajnal utcai árok be van fordítva a Virág utca északi részére és a terepen folyik le az idáig levezett csapadékvíz, ami veszélyezteti az ottani 5 ingatlant. Megoldás A Hajnal utcai árkot rácsos folyókával át kell vezetni a Virág utca kereszteződésen, és újjá kell építeni a patakig tartó szakaszon a tönkrement zárt csatornát. 6. További problémát jelent a Virág utcába a Malom utcai csomópont, mivel a Malom utcából lefolyó víz a Virág utcai ingatlanokat (544/2, 540/7, 540/8 hrsz.) öntötte el nagycsapadékok esetén, mivel az utcából lefolyó csapadékvíz nem talált már utat a terület mélypontjáig, a befogadó Bodonkúti patakig. Megoldás A Virág utcában az útburkolat mellett is kell egy árkot építeni, amely az utcából lefolyó csapadékvizet kivezeti az 549 hrsz.-ú ingatlan után húzódó a patak felé vezető földútra. A malom utca felől jövő vizet a két utca csomópontjában épít (Hungarian)
    0 references
    During the development, the existing drainage systems of Tótvázsony settlement will be refurbished and new open and closed channels will be built. The drained water will be introduced into existing local watercourses and a reservoir will be set up in one place, which will allow for the subsequent use of the water captured. An open trench of 1950 meters will be created during the development. Where possible, we plan to create an open ditch, because their maintenance and operation can be done much better than closed ditches. 380 meters of closed channel is created because there are areas, such as private yards, where it is not possible to create an open ditch, therefore it is necessary to build closed systems, 135 m trench rivers. 980 meters at present will be restored to a ditch in poor condition. A total of 3,445 meters of rainwater drainage is being prepared in the project. Problems and Solution Plans 1. At the eastern end of the school street, through the local valley on the eastern edge of the 653 municipal property, the water drains from the surrounding arable land in case of heavier rainfall activity, flooding the road, courtyards and cellars. Solution A ditch on the eastern half of the 653 municipal property bordering the arable land has to be built at a length of about 80 fm. This ditch must be connected to the trench of the Hidegkúti Road, which leads the water down into the East Stream. Before entering the trench, a sewage pit shall be constructed so that the land washed from the arable land does not burden the trench. The construction of the ditch along the road to Hidegkút should be corrected. The sides of the ditch must be shaped and grassed. 2. In the western end of School Street, the school street ditch is abolished in the area of the Cross Street junction. This results in the drainage of the school street pavement flooding through the gateways of 6. Cross Street Regulation No 202, 7. Property under number (196), lower than the street level. In the southern half of Cross Street, there was already some border to divert the water to the gateways of other properties, but in case of higher intensity of rainfall, these works are not sufficient. In addition, Cross Street 1 is endangered at the south end of Cross Street. (Hrs. 288) real estate. Solution You need to build the missing rainwater drainage works in the School and Cross streets. 3. The southern part of Telep utca, which opens from School Street (hrsz. 96), is also problematic because a small local valley passes through this area, and through a ditch no. 111 Hrsz. 11 Telep u. 11 (112 hrsz.) it floods the buildings 2/1, 2/2 and 3/1, 3/2 and 3/1, 3/2 of the property of Telep utca 121 and 122. On the one hand, we should reduce the amount of rainwater on the Telep street by installing a lattic sinkhole in the school street junction and by connecting it to the existing 600 pipe, we reduce the load on Telep Street. In order to reduce the rainfall on Telep Street, the outskirts must be drawn down in the terrain at the eastern end of Telep utca with a ditch similar to that at the end of István Street. The remaining rainwater can be led to the direction of Cross Street with a ditch or a closed channel on Telep Street. 4. The residential buildings built at the south end of Magyar utca (777/2-5 properties) are threatened by the water draining from the land road 0292/11 which connects the eastern direction of Balatonszőlősi út. Solution Water draining from the dirt road should be shared. From the road to the east of the watershed, the water can be flown to the valley of the East Stream, and to the west of the watershed the water can be led to the ditch of the road. For this purpose, both the dirt road and the road trench must be constructed on a suitable section. Design should be used to determine the required trench sizes. 5. There is a problem in the junction of Hajnal utca-Virág utca, parallel to Hajnal Street, the condition of the closed canal leading to the Bodonkút stream. This tube is likely to be completely muddy and does not perform its function. This pipe is the continuation of the drainage ditch on the northern side of Hajnal Street, however, as this pipe does not function, the ditch in Hajnal Street is translated into the northern part of Virág Street and the rainwater flowing down in the terrain, which threatens the 5 properties there. Solution The trench in Hajnal Street must be driven through the intersection of the Flower Street with a lattice river, and the ruined closed canal must be rebuilt on the section to the stream. 6. Another problem is the Malom Street junction into Virág utca, as the water draining from Malom Street poured the properties of the Flower Street (544/2, 540/7, 540/8) in case of large condensations, as the rainwater from the street could not find any way to the low point of the area, the receiving Bodonkút stream. Solution In Flower Street a ditch must be built next to the pavement, which leads the ra... (English)
    9 February 2022
    0 references
    Pendant le développement, les systèmes de drainage existants du village de Tótvázsony seront rénovés et de nouveaux canaux ouverts et fermés seront construits. L’eau drainée sera introduite dans les cours d’eau locaux existants et un réservoir sera installé en un seul endroit, ce qui permettra l’utilisation ultérieure de l’eau captée. Une tranchée ouverte de 1950 mètres sera créée pendant le développement. Dans la mesure du possible, nous prévoyons de créer un fossé ouvert, car leur entretien et leur fonctionnement peuvent être beaucoup mieux réalisés que les fossés fermés. 380 mètres de canal fermé est créé parce qu’il y a des zones, telles que des chantiers privés, où il n’est pas possible de créer un fossé ouvert, il est donc nécessaire de construire des systèmes fermés, 135 m rivières de tranchée. À l’heure actuelle, 980 mètres seront restaurés dans un fossé en mauvais état. Un total de 3445 mètres de drainage des eaux de pluie est en cours de préparation dans le cadre du projet. Problèmes et plans de solution 1. À l’extrémité est de la rue scolaire, à travers la vallée locale à la limite est de la propriété municipale, l’eau s’écoule des terres arables environnantes en cas d’activité pluviale plus lourde, d’inondation de la route, de cours et de caves. Solution Un fossé sur la moitié est des 653 propriétés municipales bordant les terres arables doit être construit sur une longueur d’environ 80 pim. Ce fossé doit être relié à la tranchée de la route Hidegkúti, qui conduit l’eau vers l’East Stream. Avant d’entrer dans la tranchée, une fosse d’égouts doit être construite de manière à ce que le terrain lavé des terres arables n’entrave pas la tranchée. La construction du fossé le long de la route de Hidegkút doit être corrigée. Les côtés du fossé doivent être façonnés et herbés. 2. À l’extrémité ouest de la rue School, le fossé de rue de l’école est aboli dans le secteur de la jonction de la rue Cross. Il en résulte le drainage des chaussées scolaires inondées par les portes d’entrée de 6. Cross Street Règlement no 202, 7. Propriété sous le numéro (196), inférieure au niveau de la rue. Dans la moitié sud de Cross Street, il y avait déjà une certaine frontière pour détourner l’eau vers les portes d’autres propriétés, mais en cas d’intensité de pluie plus élevée, ces travaux ne sont pas suffisants. De plus, la rue Cross 1 est en voie de disparition à l’extrémité sud de Cross Street. (Hrs. 288) immobilier. Solution Vous devez construire les ouvrages manquants de drainage des eaux de pluie dans les rues de l’école et de Cross. 3. La partie sud de Telep utca, qui s’ouvre de School Street (hrsz. 96), est également problématique parce qu’une petite vallée locale traverse cette zone, et à travers un fossé no 111 Hrsz. 11 Telep u. 11 (112 hrsz.) il inonde les bâtiments 2/1, 2/2 et 3/1, 3/2 et 3/1, 3/2 de la propriété de Telep utca 121 et 122. D’une part, nous devrions réduire la quantité d’eau de pluie sur la rue Telep en installant un évier lattique dans le carrefour de la rue de l’école et en le connectant au tuyau existant 600, nous réduisons la charge sur Telep Street. Afin de réduire les précipitations sur la rue Telep, les abords doivent être tirés sur le terrain à l’extrémité est de Telep utca avec un fossé similaire à celui de l’extrémité de la rue István. Le reste de l’eau de pluie peut être conduit à la direction de Cross Street avec un fossé ou un canal fermé sur Telep Street. 4. Les bâtiments résidentiels construits à l’extrémité sud de Magyar utca (777/2-5 propriétés) sont menacés par le drainage d’eau de la route terrestre 0292/11 qui relie la direction est de Balatonszőlősi út. Solution L’évacuation de l’eau de la route de terre doit être partagée. De la route à l’est du bassin versant, l’eau peut être transportée jusqu’à la vallée de l’East Stream, et à l’ouest du bassin versant, l’eau peut être amenée au fossé de la route. À cette fin, le chemin de terre et la tranchée doivent être construits sur un tronçon approprié. La conception doit être utilisée pour déterminer la taille des tranchées requises. 5. Il y a un problème dans la jonction de Hajnal utca-Virág utca, parallèle à la rue Hajnal, l’état du canal fermé menant au ruisseau Bodonkút. Ce tube est susceptible d’être complètement boueux et ne remplit pas sa fonction. Ce tuyau est la continuation du fossé de drainage du côté nord de la rue Hajnal, cependant, comme ce tuyau ne fonctionne pas, le fossé de la rue Hajnal est traduit dans la partie nord de la rue Virág et l’eau de pluie coule dans le terrain, ce qui menace les 5 propriétés là-bas. Solution La tranchée de la rue Hajnal doit être conduite à travers l’intersection de la rue Flower avec une rivière en treillis, et le canal fermé en ruine doit être reconstruit sur la section du ruisseau. 6. Un autre problème est la jonction de la rue Malom dans Virág utca, car l’eau qui s’écoule de la rue Malom a versé les propriétés de la rue Flower (544/2, 540/7, 540/8) en cas de grandes c... (French)
    10 February 2022
    0 references
    Tótvázsony, Veszprém
    0 references

    Identifiers

    TOP-2.1.3-15-VE1-2016-00035
    0 references