Creation of a green city in Sümeg (Q3948845)

From EU Knowledge Graph
Revision as of 03:20, 15 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: fix budget)
Jump to navigation Jump to search
Project Q3948845 in Hungary
Language Label Description Also known as
English
Creation of a green city in Sümeg
Project Q3948845 in Hungary

    Statements

    0 references
    308,284,500.0 forint
    0 references
    871,520.28 Euro
    0.002827 Euro
    15 February 2022
    0 references
    435,000,000.0 forint
    0 references
    1,229,745.0 Euro
    0.002827 Euro
    15 February 2022
    0 references
    70.87 percent
    0 references
    1 July 2017
    0 references
    31 December 2020
    0 references
    SÜMEG VÁROS ÖNKORMÁNYZATA
    0 references
    0 references

    46°57'41.33"N, 17°18'33.66"E
    0 references
    A fejlesztések célja Sümeg városi közterületeinek környezettudatos, család- és klímabarát megújítása, annak érdekében, hogy a beavatkozások területe alkalmas legyen a családok és a fiatalok számára szabad idejük hasznos eltöltéséhez, mindeközben a fejlesztések a környezeti fenntarthatóság követelményeit szolgálják, a városi zöld környezet megteremtéséhez, ezek gazdaságos fenntartásához járulnak hozzá. A fejlesztés hozzájárul a TOP gazdaságfejlesztési céljaihoz, ezzel pedig a települések lakosságának megtartásához. A gazdasági szereplőket célzó, a vonzó üzleti környezetet biztosító, a város térségi gazdasági központi szerepét erősítő, a helyi gazdaságot ösztönző beruházások vonatkozásában célunk a kijelölt akcióterületen található zöldfelületek és a hozzájuk kapcsolódó önkormányzati tulajdonban lévő jövedelemtermelésre alkalmas infrastruktúraelemek megújítása/megteremtése. A fejlesztés során az alábbi az igényfelmérésben részletezett beavatkozásokat tervezzük: Pannon Park - a település nyugati részén, egy kb. 3,6 ha nagyságú területen kialakítandó rekreációs közpark, helyi termelői bolt, tó Petőfi Sándor – Árpád utcai - A település ÉK-DNY-i irányú közlekedési útvonalán, annak mint 900 méter hosszú szakaszán „zöldfolyosót” terveztünk. A zöld folyosóhoz kapcsolódóan kialakításra kerül a csapadékvíz elvezető rendszer lezárásával 63 db parkolóhely Fejlesztésünk az alábbi, Sümeg Város ITS-ében rögzített és a városrész céljaihoz is illeszkedő célterületekre irányul: ?A város közterületeinek állapot javítása, parkolók kialakítása. ?Szabadtéri rendezvények helyszínének kialakítása. ?A lezúduló felszíni vizek rendezése. ?Közvilágítás energiatakarékos átalakítása. ?A köztereken kamera rendszer telepítése ?Helyi termék bolt bővítése és fejlesztése A fejlesztés összhangban van Sümeg Város helyi esélyegyenlőségi programjával, a tervezett fejlesztések megfelelnek a helyi építési szabályzatban és szerkezeti tervben foglaltaknak Az OTÉK szerinti terület-felhasználási besorolás bemutatása mellett, röviden mutassa be az akcióterületet, annak határait, főbb jellemzőit. A fejlesztés helyszínei: Sümeg Város Szabályozási Terve alapján a fejlesztendő területek a Vk2, K4 és KÖu övezeti besorolásban vannak. Fejlesztendő akcióterület: Belváros Az akcióterület Sümeg belvárosát foglalja magába. A határait a hatályos településszerkezeti terv lehatárolása adja. Az akcióterületet az alábbi utcák határolják: 84. sz. főút – vasút – Árpád utca – Mogyorós-domb bekötő út. Az akcióterület kiterjedése mintegy 340 hektár. Az akcióterület fejlesztésének általános cél, hogy a városközpont mind a turisztikai szolgáltatások, mind az itt helyt kapó intézmények, mind pedig a közösségi funkciók tekintetében váljon Sümeg egyedi hangulatú, élhető és vonzó centrumává. A fejlesztés részletes szakmai tartalma: Tevékenységek: 311 A a-0,8693%; 312 A a Tó-13,8791%; 313 A c-14,0520%; 311 A d-7,9966%; 311 C b- 9,6184%; 312 d-0,2409%; 312 i-4,5408%; 312 g-9,2622%; 312 1-13,5017%; 312 2 -8,1584%; 312 3 a-1,0633%; 312 3 g-0,8934%; 312 4-0,3330%; 312 6-0,9389%; 313 a-3,4305%; Területelőkészítés-1,0515%; 312 4 (az e parkolókiépítése a 312 2 tev. belül terveztünk) A önállóan nem támogatható tevékenységek összesen 39,224470% (ZIFFA-val együtt); 3.1.3 f)-0,5839%; 3.1.3 d) 0,0862%; Előkészítés-4,9708%, egyéb 4,5% A felhívás 3.2 pontjában előírt feltételek teljesülésének bemutatása helyhiány miatt az Igényfelmérés 2.1.1 pontjában kerül bemutatásra. A felhívás 4.4 Tartalmi értékelés alábbi szempontjainak teljesülése: Az alacsony státuszú lakosság arányának változása nem releváns; A projekt költséghatékony, reális és takarékos A projekt hozzájárul a területi szereplőre vonatkozó kötelező releváns indikátorok teljesítéshez. Főbb műszaki-szakmai eredmények 1. A projekt keretében építendő vízáteresztő burkolatú járdák Eredmény célértéke: 3360 Mértékegysége: m2 Egyéb tulajdonsága: 3.1.2 Önállóan nem támogatható, választható tevékenységek A g); 2. A projekt keretében kiépítendő parkolók száma (zöldfolyosó) Eredmény célértéke: 63, Mértékegysége: db, Egyéb tulajdonsága: 3.1.2 Önállóan nem támogatható, választható tevékenységek 2. 3. A projekt keretében kiépítendő kerékpártárolók száma Eredmény célértéke: 42, Mértékegysége: db, Egyéb tulajdonsága: 3.1.2 Önállóan nem támogatható, választható tevékenységek 3. g) 4. A projekt keretében kihelyezett napelemes kandeláberek száma Eredmény célértéke: 25 Mértékegysége: db Egyéb tulajdonsága: 3.1.3 Önállóan nem t., kötelezően megvalósítandó tevékenységek a) 5. A projekt keretében kiépítendő helyi termék bolt mérete Eredmény célértéke: 124,62, Mértékegysége: m2, Egyéb tulajdonsága: 3.1.1 Önállóan tám. tevékenységek C) b) 6.A projekt keretében beszerzendő a terület rendeltetésszerű használathoz szükséges utcabútorok mennyisége Eredmény célértéke: 88, Mértékegysége: db, Egyéb tulajdonsága: 3.1.2 Önállóan nem t., választható tevékenységek i) A fejlesztésnek nincs elrőre látható klímakockázata! (Hungarian)
    0 references
    The aim of the developments is to renovate the urban areas of Sümeg in an environmentally friendly, family- and climate-friendly way, in order to ensure that the area of interventions is suitable for families and young people to spend their free time usefully, while at the same time the developments serve the requirements of environmental sustainability, the creation of the urban green environment and their economical maintenance. Development contributes to the economic development goals of the TOP and thus to the retention of the population of the settlements. With regard to investments aimed at economic operators, providing an attractive business environment, strengthening the central role of the city in the regional economy and encouraging the local economy, our aim is to renew/create the green surfaces in the designated action area and the infrastructure elements that are suitable for local government-owned income generation. During the development we plan the following interventions detailed in the needs assessment: Pannon Park — in the western part of the settlement, a recreational public park, a local producer shop, lake Petőfi Sándor — Árpád Street — on the ÉK-DNY-directional transport route of the settlement, on the 900 m long section of the village, we planned a green corridor. With the closure of the rainwater drainage system, 63 parking spaces will be developed in connection with the green corridor. Our development is aimed at the following target areas, which are recorded in the ITS of the City of Sümeg and are also compatible with the objectives of the district: Improving the state of the city’s public areas, creating car parks. Setting up a venue for open-air events. The settlement of the falling surface waters. Energy-saving conversion of public lighting. Installation of a camera system in public spaces?Development and development of a local product store The development is in line with the local equal opportunities programme of the City of Sümeg, the planned developments comply with the local building regulations and structural plan. Besides presenting the land use classification according to OTÉK, please briefly describe the action area, its boundaries and its main characteristics. Development sites: According to the Sümeg City Regulatory Plan, the areas to be developed are classified as zones Vk2, K4 and KÖu. Action area to be developed: Downtown The action area includes the city center of Sümeg. Its boundaries are defined by the delimitation of the current settlement structure plan. The action area is bounded by the following streets: Highway 84 — railway — Árpád street — Mogyorós-domb road. The scope of the action area is about 340 hectares. The general objective of the development of the action area is to make the city centre a unique, liveable and attractive centre of Sümeg, both in terms of tourism services, the institutions hosting it and the community functions. Detailed professional content of the development: Activities: 311 A a-0.8693 %; 312 A in Lake-13.8791 %; 313 A c-14.0520 %; 311 A d-7.9966 %; 311 C b- 9.6184 %; 312 d-0.2409 %; 312 i-4.5408 %; 312 g-9.2622 %; 312 1-13.5017 %; 312 % TO 8.1584 %; 312 3 a-1.0633 %; 3 123 g-0.8934 %; 312 4-0.3330 %; 312 6-0.9389 %; 313 a-3.4305 %; Area preparation-1.0515 %; 312 4 (the construction of this car park was planned within 312 2 Acts) Total ineligible activities 39.224470 % (including ZIFFA); 3.1.3 (f)-0.5839 %; 3.1.3 (d) 0.0862 %; Preparation-4.9708 %, other 4.5 % The presentation of compliance with the conditions set out in point 3.2 of the call will be presented in section 2.1.1 of the Requests Survey due to lack of space. 4.4 Compliance with the following aspects of the content assessment: The change in the proportion of the population with a low status is not relevant; The project is cost-effective, realistic and economical The project contributes to the fulfilment of the relevant mandatory indicators for the territorial actor. Main technical-professional results 1. The permeable pavements to be built under the project are the target result: 3360 Units of measurement: m² Other property: 3.1.2 Optional activities that are not self-eligible A g); 2. Number of parking areas to be built under the project (green corridor) Result target: 63, Units of measurement: DB, Other property: 3.1.2 Optional actions that are not self-eligible 2. 3. Number of bicycle storage units to be built under the project Result target: 42, Units of measurement: DB, Other property: 3.1.2 Optional activities that are not self-eligible 3. g) 4. Number of solar candelegers deployed under the project Result target: 25 Units of measurement: DB Other property: 3.1.3 Activities that are not self-sufficient and must be carried out a) 5. Size of the local product store to be built under the project Result target: 124,62, Units of measurement: m², Other property: 3.1.1 Self-supported activities C) b) 6.The amount of street furniture required for the proper ... (English)
    9 February 2022
    0 references
    L’objectif de ces développements est de rénover les zones urbaines de Sümeg d’une manière respectueuse de l’environnement, de la famille et du climat, afin de garantir que la zone d’intervention soit adaptée aux besoins des familles et des jeunes à passer utilement leur temps libre, tout en répondant aux exigences de la durabilité environnementale, de la création d’un environnement urbain vert et de leur entretien économique. Le développement contribue à la réalisation des objectifs de développement économique du POT et, partant, au maintien de la population des colonies. En ce qui concerne les investissements destinés aux opérateurs économiques, la création d’un environnement commercial attractif, le renforcement du rôle central de la ville dans l’économie régionale et l’encouragement de l’économie locale, notre objectif est de renouveler/créer les surfaces vertes dans la zone d’action désignée et les éléments d’infrastructure adaptés à la génération de revenus appartenant aux collectivités locales. Au cours du développement, nous planifions les interventions suivantes détaillées dans l’évaluation des besoins: Pannon Park — dans la partie ouest de la colonie, un parc public récréatif, un producteur local, le lac Petőfi Sándor — rue Árpád — sur l’itinéraire de transport directionnel ÉK-DNY du village, sur la section de 900 m du village, nous avons planifié un couloir vert. Avec la fermeture du système de drainage des eaux pluviales, 63 places de stationnement seront aménagées en liaison avec le corridor vert. Notre développement vise les zones cibles suivantes, qui sont enregistrées dans le STI de la ville de Sümeg et sont également compatibles avec les objectifs du district: Amélioration de l’état des espaces publics de la ville, création de parkings. Mise en place d’un lieu pour des événements en plein air. Le tassement des eaux de surface tombantes. Conversion économe en énergie de l’éclairage public. Installation d’un système de caméras dans les espaces publics?Développement et développement d’un magasin de produits locaux Le développement est conforme au programme local d’égalité des chances de la ville de Sümeg, les aménagements prévus sont conformes aux règlements locaux du bâtiment et au plan structurel. Outre la présentation de la classification de l’occupation des sols selon OTÉK, veuillez décrire brièvement la zone d’action, ses limites et ses principales caractéristiques. Sites de développement: Selon le plan de réglementation de la ville de Sümeg, les zones à développer sont classées dans les zones Vk2, K4 et KÖu. Domaine d’action à développer: Centre-ville La zone d’action comprend le centre-ville de Sümeg. Ses limites sont définies par la délimitation du plan de structure de règlement actuel. La zone d’action est délimitée par les rues suivantes: Autoroute 84 — chemin de fer — rue Árpád — route Mogyorós-domb. L’étendue de la zone d’action est d’environ 340 hectares. L’objectif général du développement de la zone d’action est de faire du centre-ville un centre unique, vivant et attrayant de Sümeg, tant sur le plan des services touristiques, des institutions qui l’accueillent que des fonctions communautaires. Contenu professionnel détaillé du développement: Activités: 311 A a-0,8693 %; 312 A dans le lac-13,8791 %; 313 A c-14,0520 %; 311 A d-7,9966 %; 311 C b- 9,6184 %; 312 d-0,2409 %; 312 i-4,5408 %; 312 g-9,2622 %; 312 1-13,5017 %; 312 % À 8,1584 %; 312 3 a-1,0633 %; 3 123 g-0,8934 %; 312 4-0,3330 %; 312 6-0,9389 %; 313 a-3,4305 %; Préparation de la surface — 1,0515 %; 312 4 (la construction de ce parking était prévue dans 312 2 Actes) Total des activités inéligibles 39,224470 % (y compris Ziffa); 3.1.3 f)-0,5839 %; 3.1.3 d) 0,0862 %; Préparation-4,9708 %, autres 4,5 % La présentation du respect des conditions énoncées au point 3.2 de l’appel sera présentée à la section 2.1.1 de l’enquête sur les demandes en raison d’un manque d’espace. 4.4 Respect des aspects suivants de l’évaluation du contenu: La variation de la proportion de la population ayant un statut inférieur n’est pas pertinente; Le projet est rentable, réaliste et économique Le projet contribue à la réalisation des indicateurs obligatoires pertinents pour l’acteur territorial. Principaux résultats techniques et professionnels 1. Les chaussées perméables à construire dans le cadre du projet sont le résultat cible: 3360 Unités de mesure: m² Autre propriété: 3.1.2 Activités facultatives qui ne sont pas auto-éligibles A g); 2. Nombre d’aires de stationnement à construire dans le cadre du projet (corridor vert) Cible de résultat: 63, Unités de mesure: DB, Autres biens: 3.1.2 Mesures facultatives qui ne sont pas auto-éligibles 2. 3. Nombre d’unités de stockage de vélos à construire dans le cadre du projet Cible de résultat: 42, Unités de mesure: DB, Autres biens: 3.1.2 Activités facultatives qui ne sont pas auto-éligibles 3. g) 4. Nombre de candélégataires solaires déployés dans le cadre du projet Résultat: 25 unités de mesure... (French)
    10 February 2022
    0 references
    Sümeg, Veszprém
    0 references

    Identifiers

    TOP-2.1.2-15-VE1-2016-00005
    0 references