Building a green city in Battonya (Q3948739)

From EU Knowledge Graph
Revision as of 03:18, 15 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: fix budget)
Jump to navigation Jump to search
Project Q3948739 in Hungary
Language Label Description Also known as
English
Building a green city in Battonya
Project Q3948739 in Hungary

    Statements

    0 references
    0 references
    156,970,000.0 forint
    0 references
    443,754.19 Euro
    0.002827 Euro
    15 February 2022
    0 references
    220,000,000.0 forint
    0 references
    621,940.0 Euro
    0.002827 Euro
    15 February 2022
    0 references
    71.35 percent
    0 references
    1 June 2017
    0 references
    31 July 2021
    0 references
    BATTONYA VÁROS ÖNKORMÁNYZATA
    0 references
    Q3962182 (Deleted Item)
    0 references

    46°18'52.42"N, 21°1'17.18"E
    0 references
    A támogatási kérelem a Felhívás Területspecifikus Mellékletének 1.2 a) pontjában megjelölt forráskeretre irányul. A projekt tervezett tevékenységei a 1485 helyrajzi számú (Hősök tere), a 2880/2 helyrajzi számú, 11 helyrajzi számú és a 14/14 helyrajzi számú ingatlanokon valósulnak meg. A projekt elemei önálló és önállóan nem támogatható tevékenységek szerint: A) Főtevékenység – zöld város kialakítása a) pont keretében megvalósul az 1485 helyrajzi számú Hősök tere teljes növényfelület és növényállomány rekonstrukciója az élőhelyek és biodiverzitás növelésének érdekében, helyreállításra illetve kialakításra kerül a több szintes növényállomány (gyepfelületek, cserjesorok és foltok kialakítása és megújítása, a kiegészítő tevékenység keretében eltávolított beteg fák pótlása) kiépítésre kerül a LED technológiás térvilágítás, a telepítésre kerülő növényfajok pontos listája a pályázat keretében elkészítendő Zöld infrastruktúra hálózat fejlesztési- és fenntartási akcióterv keretében kerül meghatározásra. Költséghányad 22,7% A tevékenységhez kapcsolódóan, egyszeri beavatkozásként megvalósul a gyomirtás/beteg fák eltávolítása, 1,3% d) pont keretében a 2880/2 helyrajzi számú területen kialakításra kerül egy játszótér és egy szabadtéri sport/tornapálya. Költséghányad 8,7% g) pont keretében megvalósul a parkot körülvevő épületek (templom, óvoda) csapadékvízének közvetlen hasznosítása tárolók és öntöző rendszer kiépítésével az a) pontban rekonstruált és megújított zöldfelületek hosszú távú fenntartása érdekében. Költséghányad 6,2% C) Főtevékenység - az akcióterületen önkormányzat vagy önkormányzati többségi tulajdonban lévő gazdasági társaság tulajdonába kerülő szolgáltató épület kialakítása b) pont esetében gazdaságélénkítési céllal megvalósul a Korona Szálló (Hrsz.:11) egykori kávézó teraszának rekonstrukciója a jelenlegi, az épület jellegéhez méltatlan, településképet zavaró fémszerkezetű toldalék épület bontását követően, annak helyén a fellelt történelmi dokumentációk alapján. A kávézóterasz használatára vonatkozólag az önkormányzat bérbeadási szerződést köt a szomszédos étterem üzemeltetőjével, aki jelenleg ideiglenes jellegű, nem megfelelő kapacitású vendégfogadó képességét a megfelelő szintre tudja emelni. Költséghányad 7,5% Önállóan nem támogatható, választható tevékenységek A) főtevékenység a) pont esetében „Zöld infrastruktúra hálózat fejlesztési- és fenntartási akcióterv” készítése Költséghányad ~1% g) pont esetében teljes rétegrendjében vízáteresztő burkolatú sétautak nyomvonal rekonstrukciója és felújítása, nem vízáteresztő burkolatok cseréje Költséghányad 1,3% i) a terület rendeltetésszerű használathoz szükséges eszközbeszerzés keretében környezetbe illő, minőségi utcabútorok, hulladéktárolók elhelyezése Költséghányad 0,5% k) keretében a területen megtartott rendezvényekhez kapcsolódóan nyilvános mosdók és öltözők kialakítása Költséghányad 5,8% Valamennyi főtevékenység esetében támogatható tevékenységek közül 3. a) a gyalogos és gépjármű forgalom elválasztásának érdekében a 2880/2 és a 14/14 helyrajzi számú ingatlanok között gyalogos fahíd kerül kiépítésre a Királyhegyesi-Száraz éren átívelően. Költséghányad 5,3% b) meglévő parkolóhelyek felújítása Költséghányad 8% Önállóan nem támogatható, kötelezően megvalósítandó tevékenységek közül a) és b) pont nem releváns c) pont a tervezett tevékenységek része, d) Nyilvánosság biztosítása ~0,5%; e) Partnerségi tervezés – kapcsolódó marketing és kommunikáció ~1% f) „soft” elemek ~2%. A tervezett "Soft" elemek a városi rendezvénynaptárra épülve: Környezet-tudatosság és integrált szemlélet erősítése a lakosság körében 1. Önkormányzat által vezérelt, környezettudatosságot erősítő, szemléletformálási kampány szervezése; 2. Önkormányzat által vezérelt, környezettudatosságot erősítő, energiatudatosságra nevelő, programok szervezése; Települési arculat és identitás fejlesztése 3. Helyi kézműves termékek és élelmiszerek népszerűsítése, promótálása; Projektmenedzsment tevékenység ~2,5%, Műszaki ellenőri tevékenység ~1%, közbeszerzés ~1%, projekt előkészítés megalapozó dokumentumai ~3%, tervezés és engedélyezés ~2% A projekt tevékenység keretében létrehozott gazdaságélénkítés és kapcsolódó szemléletformálás valamint az új zöldfelületek és közösségi terek (játszótér, szabadtéri tornapark) kialakításának és a kapcsolódó egészségtudatos viselkedésformák terjedésének köszönhetően, várhatóan csökken az alacsony státuszú lakosság aránya. A projekt tartalmi összeállítása során elsődleges szempont volt a költséghatékony, reális és takarékos tervezés. A projekt jelentősen hozzájárul a területi szereplőre vonatkozó kötelező releváns indikátorteljesítéshez. További energiahatékonysági eredmények: a csapadékvíz öntözésre történő felhasználásával jelentősen csökken az ivóvíz ez irányú használata. A megújított és kialakított terület megvilágításához szükséges villamos energia biztosítására napelemes működtetésű kandeláberek kerülnek telepítésre. (Hungarian)
    0 references
    The aid application relates to the funding framework indicated in point 1.2(a) of the Area-specific Annex to the Call. The planned activities of the project will be carried out on properties No 1485 (H Heroes’ Square), No 2880/2, No 11 and No 14/14. Elements of the project by autonomous and ineligible activities: A) Main activity — in the framework of point (a) the reconstruction of the entire area and plant stock of Heroes No. 1485 will be carried out in order to increase habitats and biodiversity, the restoration and renewal of the multi-level plant stock (grass surfaces, shrub rows and stains, replacement of sick trees removed as part of the additional activity) will be completed, and the exact list of plant species to be planted will be determined in the framework of the development and maintenance action plan of the Green Infrastructure Network to be prepared in the framework of the tender. The cost ratio is 22.7 % The activity involves the removal of weed control/patient trees as a one-off intervention, a playground and an outdoor sports/gymnastics field will be set up under point 1.3 % (d) in the area 2880/2. The cost ratio is realised under point 8.7 % (g) for the direct utilisation of the rainwater of the buildings surrounding the park (church, kindergarten) by building storages and irrigation systems for the long-term maintenance of the green surfaces reconstructed and renewed in point (a). Cost ratio 6.2 % C) Main activity — in the case of point b) of point b), the reconstruction of the terrace of the former café Korona Hotel (Hrsz.:11) will be realised after the demolition of the current building with metal structure that interferes with the nature of the building, which interferes with the townscape, on the basis of the historical documentation found. Regarding the use of the cafeteria, the municipality concludes a lease agreement with the operator of the neighbouring restaurant, who is currently able to raise the capacity of a temporary host with insufficient capacity to the right level. Cost ratio 7.5 % Ineligible activities A) for main activity (a) preparation of “Green infrastructure network development and maintenance action plan” in the case of point ~1 % g) reconstruction and refurbishment of pathways with permeable coverings in the entire strata, and replacement of non-permeable coverings 1.3 % i) fit into the environment in the context of the purchase of equipment necessary for the proper use of the area, in connection with the events held in the area, the cost ratio of public toilets and changing rooms is 5.8 % of the eligible activities for all the main activities: (a) a pedestrian wooden bridge will be built across Királyhegyesi-Száraz in order to separate pedestrian and car traffic between properties Nos 2880/2 and 14/14. Cost ratio 5.3 % (b) Renovation of existing parking spaces 8 % of non-eligible mandatory activities (a) and (b) are not relevant points (c) are part of the planned activities, d) Publicity ~0.5 %; e) Partnership Planning — related marketing and communication ~1 % f) “soft” elements ~2 %. The planned “Soft” elements build on the urban calendar of events: Strengthening environmental awareness and an integrated approach among the population 1. Organisation of an awareness-raising and awareness-raising campaign guided by a municipality; 2. Organisation of programmes guided by local governments, promoting environmental awareness, promoting energy awareness; Development of municipal identity and identity 3. Promotion and promotion of local handicraft products and foodstuffs; Project management activity ~2.5 %, Technical audit activity ~1 %, public procurement ~1 %, project preparation documents ~3 %, planning and authorisation ~2 % The proportion of the low-status population is expected to decrease due to the development of new green spaces and community spaces (playground, outdoor gymnastics) and related health-conscious behaviours created in the framework of the project activity. Cost-effective, realistic and cost-effective planning was a primary consideration when compiling the content of the project. The project contributes significantly to the mandatory relevant indicator implementation for the territorial actor. Additional energy efficiency results: using rainwater for irrigation significantly reduces the use of drinking water in this regard. Solar-powered candeladers are installed to provide the electricity needed to illuminate the renewed and constructed area. (English)
    9 February 2022
    0 references
    La demande d’aide concerne le cadre de financement indiqué au point 1.2 a) de l’annexe spécifique à l’appel à propositions. Les activités prévues pour le projet seront réalisées sur les propriétés no 1485 (Place H Heroes), no 2880/2, no 11 et no 14/14. Éléments du projet par activités autonomes et inéligibles: A) L’activité principale — dans le cadre du point a) la reconstruction de l’ensemble de la zone et du stock végétal de Heroes no 1485 sera réalisée afin d’accroître les habitats et la biodiversité, la restauration et le renouvellement du parc végétal à plusieurs niveaux (surfaces d’herbe, rangées d’arbustes et taches, remplacement des arbres malades enlevés dans le cadre de l’activité complémentaire) seront achevés, et la liste exacte des espèces végétales à planter sera établie dans le cadre du plan d’action de développement et d’entretien du réseau d’infrastructures vertes à préparer dans le cadre de l’appel d’offres. Le ratio de coût est de 22,7 % L’activité implique l’enlèvement des arbres de lutte contre les mauvaises herbes/patients en tant qu’intervention ponctuelle, un terrain de jeux et un terrain de sport/gymnastique de plein air seront mis en place au point 1,3 % d) dans la zone 2880/2. Le ratio de coût est réalisé au point 8,7 % (g) pour l’utilisation directe de l’eau de pluie des bâtiments entourant le parc (église, jardin d’enfants) par des stockages et des systèmes d’irrigation pour l’entretien à long terme des surfaces vertes reconstruites et renouvelées au point a). Ratio coût 6,2 % C) Activité principale — dans le cas du point b) du point b), la reconstruction de la terrasse de l’ancien café Korona Hôtel (Hrsz.:11) sera réalisée après la démolition du bâtiment actuel avec structure métallique qui interfère avec la nature du bâtiment, qui interfère avec le paysage urbain, sur la base de la documentation historique trouvée. En ce qui concerne l’utilisation de la cafétéria, la municipalité conclut un contrat de bail avec l’exploitant du restaurant voisin, qui est actuellement en mesure d’augmenter la capacité d’un hôte temporaire avec une capacité insuffisante au niveau approprié. 7,5 % d’activités inéligibles A) pour l’activité principale (a) préparation du «plan d’action pour le développement et la maintenance du réseau d’infrastructures vertes» dans le cas du point ~1 % g) reconstruction et remise en état des voies avec des revêtements perméables dans l’ensemble des strates et remplacement des revêtements non perméables 1,3 % i) dans le cadre de l’achat d’équipements nécessaires à la bonne utilisation de la zone, dans le cadre des manifestations organisées dans la région, le ratio coût des toilettes publiques et des vestiaires est de 5,8 % des activités éligibles pour toutes les activités principales: a) un pont piétonnier en bois sera construit sur Királyhegyesi-Száraz afin de séparer la circulation piétonne et la circulation automobile entre les propriétés nos 2880/2 et 14/14. Ratio des coûts 5,3 % b) Rénovation des places de stationnement existantes 8 % des activités obligatoires non admissibles (a) et (b) ne sont pas pertinents, c) font partie des activités prévues, d) publicité ~0,5 %; e) Planification des partenariats — marketing et communication connexes ~1 % f) éléments «douces» ~2 %. Les éléments «Soft» prévus s’appuient sur le calendrier urbain des événements: Renforcement de la sensibilisation à l’environnement et d’une approche intégrée de la population 1. L’organisation d’une campagne de sensibilisation et de sensibilisation guidée par une municipalité; 2. Organisation de programmes guidés par les autorités locales, sensibilisation à l’environnement et sensibilisation à l’énergie; Développement de l’identité et de l’identité municipales 3. La promotion et la promotion des produits artisanaux et alimentaires locaux; Activité de gestion de projet ~2,5 %, activité d’audit technique ~1 %, marchés publics ~1 %, documents de préparation de projet ~3 %, planification et autorisation ~2 % La proportion de la population de faible statut devrait diminuer en raison du développement de nouveaux espaces verts et d’espaces communautaires (terrain de jeu, gymnastique extérieure) et des comportements liés à la santé créés dans le cadre de l’activité de projet. Une planification rentable, réaliste et rentable a été une considération primordiale dans la compilation du contenu du projet. Le projet contribue de manière significative à la mise en œuvre obligatoire des indicateurs pertinents pour l’acteur territorial. Résultats supplémentaires en matière d’efficacité énergétique: L’utilisation de l’eau de pluie pour l’irrigation réduit considérablement l’utilisation de l’eau potable à cet égard. Des candeladers solaires sont installés pour fournir l’électricité nécessaire pour éclairer la zone rénovée et construite. (French)
    10 February 2022
    0 references
    Battonya, Békés
    0 references

    Identifiers

    TOP-2.1.2-15-BS1-2016-00013
    0 references