Design of a sports centre in Kiskörén (Q3948710)

From EU Knowledge Graph
Revision as of 03:18, 15 February 2022 by DG Regio (talk | contribs) (‎Removed claims)
Jump to navigation Jump to search
Project Q3948710 in Hungary
Language Label Description Also known as
English
Design of a sports centre in Kiskörén
Project Q3948710 in Hungary

    Statements

    0 references
    0 references
    1 March 2018
    0 references
    30 June 2021
    0 references
    KISKÖRE VÁROSI ÖNKORMÁNYZAT
    0 references
    0 references

    47°31'2.57"N, 20°28'40.48"E
    0 references
    A projekt célja egy jelenleg funkció nélküli, korábban ifjúsági táborként használt, üresen álló, leromlott állapotú terület rehabilitációja, új, energiatakarékos épület építése, a zöldfelületek megújítása és fejlesztése, sportkomplexum funkcióval való megtöltése. A szabadidős kikapcsolódási lehetőségek bővítése által egy több korcsoportos, aktív pihenést szolgáló területté válik a jelenleg kihasználatlan terület. HELYSZÍN: A projekt megvalósítási helyszíne a történelmi településközponttól kb. 1,6 km-re, a Kiskörei Vízerőmű közelében, az üdülőterület elején, a Platár soron található terület. A tervezett projekt megvalósítása illeszkedik a város Településszerkezeti Tervéhez, Helyi Építési Szabályzatához és Szabályozási Tervéhez. A megvalósítás helyszínei a 2280/6. és a 2280/7. helyrajzi számú, 100%-ban a pályázó Kisköre Városi Önkormányzat tulajdonában álló ingatlanok. A megvalósítási helyszín a Szabályozási Terv szerint KG1 jellel ellátott Gazdasági terület: kereskedelmi szolgáltató terület, ezért megfelel a Pályázati felhívás 3.4.1. pontjának. Korábbi Integrált Városfejlesztési Stratégiával rendelkezik a város, melynek alapvető célkitűzéseivel a benyújtott pályázatunk tevékenységei szinkronban vannak, azonban szükséges a jogszabályi feltételeknek megfelelő ITS kidolgozása, mely jelenleg folyamatban van, így a pályázó vállalja, hogy a projektfejlesztés időszakában az ITS elkészül, és a 2. mérföldkő keretében benyújtásra kerül. A TERÜLET BARNAMEZŐS JELLEGE: A fejlesztési helyszín a város keleti részén, a történelmi településmagon kívül, a Tisza-tavi üdülőterület elején helyezkedik el. Korábban gazdasági funkcióval bírt a terület, ifjúsági tábor üzemeltetésére használták. A terület déli, körbekerített részén öt darab leromlott állapotú könnyűszerkezetes, kisméretű (kb. 30 m2) épület található, valamint egy darab, szintén leromlott állapotú kb. 150 m2-es épület. A területen található egy beton burkolatos sportpálya, melynek felszíne töredezett, rossz állapotú, valamint néhány rossz állapotú kültéri bútor (pad, hulladékgyűjtő). Az északi területrészen egy korábbi épület alapjának maradványai találhatók. Az utóbbi időben a terület állapota leromlott, semmilyen célra nem volt használható. A fejlesztési helyszín tehát megfelel a pályázati felhívás fogalomjegyzékében szereplő BARNAMEZŐS TERÜLET kritériumainak, mert használaton kívül került, leromlott fizikai állapotban lévő egykori gazdasági terület. A PROJEKT TEVÉKENYSÉGEI: A projekt megvalósítása során sport, aktív- és passzív rekreációs funkciók létrehozásával egy sportkomplexum kialakítására kerül sor, melyen többféle sportpálya (műfüves futballpálya, multifunkciós sportpálya: kézilabda, kosárlabda, futball, tenisz), és egy szintén többféle sport űzésére alkalmas épület kerül kialakításra. A projekt fontos része a zöldfelületek megújítása, növények telepítése, rekreációs pihenőfelületek kialakítása. A fejlesztés az OTÉK előírásainak megfelelően, az akadálymentesítés kritériumait teljesítve valósul meg. A támogathatósági szempontok szerint a projekt tevékenységei a következők: KÖTELEZŐEN MEGVALÓSÍTANDÓ, ÖNÁLLÓAN TÁMOGATHATÓ GAZDASÁGÉLÉNKÍTŐ TEVÉKENYSÉG: A sportkomplexumban kialakított szabadtéri sportpályák és az épületben elérhető sportolási lehetőségek (squash, játszó szoba, konditerem, tükrös tornaterem, jacuzzi) egyaránt díjfizetés ellenében lesznek használhatók. Az épületben büfé helyiség kialakítására is sor kerül. A kialakítandó funkció a pályázati felhívás B. Főtevékenysége, azon belül a Gazdaságélénkítő tevékenységek közül az 3. pontba sorolható be. ÖNÁLLÓAN TÁMOGATHATÓ TEVÉKENYSÉGKÉNT valósul meg a szabadtéri sportpályák és az épület körüli zöldfelületek rendezése, rekreációs pihenőfelületek kialakítása a pályázati felhívás A. Főtevékenysége, azon belül az 1 , 3 és 4 pontok szerint. ÖNÁLLÓAN NEM TÁMOGATHATÓ, VÁLASZTHATÓ TEVÉKENYSÉGKÉNT valósul meg a kötelezően előírt parkolók kialakítása, valamint a közlekedési útvonalak kialakítása, utcabútorok elhelyezése és a világítás kiépítése. ÖNÁLLÓAN NEM TÁMOGATHATÓ, KÖTELEZŐEN MEGVALÓSÍTANDÓ TEVÉKENYSÉGEK: Megvalósul a projektarányos akadálymentesítés, az energiahatékonysági intézkedések, a nyilvánosság biztosítása, a partnerségi tervezés, a SOFT tevékenységek megvalósítása is. Az azbesztmentesítés nem releváns. Az elektromos járművek használatához szükséges alapvető töltő-infrastruktúra kiépítése is megtörténik. ELŐKÉSZÍTÉSI TEVÉKENYSÉGEK: A projekt előkészítése során elkészült az Igényfelmérés és kihasználtsági terv. A 2. mérföldkőben kerül benyújtásra a Megvalósíthatósági Tanulmány, a Költség-haszon elemzés, valamint az ITS. A 2. mérföldkőben elkészülnek az engedélyes szintű, illetve a kiviteli tervek, valamint a tételes tervezői költségvetés, és lefolytatjuk a közbeszerzési eljárást. MEGVALÓSÍTÁSHOZ KAPCSOLÓDÓ TOVÁBBI TEVÉKENYSÉGEK: A projekt megvalósításához elengedhetetlenül szükséges tevékenységek valósulnak meg: projektmenedzsment, műszaki ellenőrzés. (Hungarian)
    0 references
    The aim of the project is to rehabilitate an empty, degraded area previously used as a youth camp, building a new energy-saving building, renewing and developing green surfaces and filling it with a sports complex. With the expansion of recreational facilities, the area currently unexploited becomes an area for active rest of several age groups. LOCATION: The implementation site of the project is about 1.6 km from the historic town centre, near the Kiskörei Water Power Plant, at the beginning of the recreation area, on the Platár line. The implementation of the planned project is in line with the Town Structure Plan, the Local Construction Regulations and the Regulatory Plan of the City. The venues for the implementation are properties Nos 2280/6 and 2280/7, 100 % owned by the applicant Kisköre Municipality. The site of implementation is the Economic Area marked KG1 in accordance with the Regulatory Plan: it is a commercial service area and therefore complies with point 3.4.1 of the call for proposals. The city has an earlier Integrated Urban Development Strategy, the activities of which are synchronised with the basic objectives of our application. However, it is necessary to develop ITS in accordance with the legal requirements, which is currently underway, so the applicant undertakes to complete the ITS during the project development period and to be submitted under milestone 2. BROWNFIELD NATURE OF THE AREA: The development site is located in the eastern part of the town, outside the historical core of the village, at the beginning of the Lake Tisza recreation area. Previously, the area had an economic function and was used to run a youth camp. In the southern part of the area there are five small, small buildings (approximately 30 m²) with degraded state and one building of approximately 150 m², which is also degraded. In the area there is a concrete paved sports ground with a surface of fragmented, poor condition, as well as some poorly-conditioned outdoor furniture (bench, waste collection). In the north there are remains of the foundation of a former building. Recently, the condition of the area has deteriorated and could not be used for any purpose. The development site therefore fulfils the criteria of the brownfield site in the list of terms of the call for proposals, because it was a former economic area in a degraded physical state which was out of use. PROJECT ACTIVITIES: During the implementation of the project, a sports complex will be developed with the creation of sports, active and passive recreational functions, on which several sports grounds (artificial football field, multifunctional sports field: handball, basketball, football, tennis) and a building suitable for various types of sports. An important part of the project is the renewal of green surfaces, planting of plants, and the creation of recreational rest areas. The development will be carried out in accordance with the requirements of the OTÉK and meeting the accessibility criteria. According to the eligibility criteria, the activities of the project are as follows: SELF-SUPPORTED ECONOMIC RECOVERY ACTIVITY TO BE CARRIED OUT ON A MANDATORY BASIS: Outdoor sports grounds in the sports complex and sport facilities available in the building (squash, playing room, gym, mirror gym, jacuzzi) will be used for a fee. A buffet room is also set up in the building. The function to be developed can be classified under point 3 of the main activity of the call for proposals, including the economic recovery activities. As an independent SUPPORTING activity, the organisation of outdoor sports grounds and the green surfaces around the building and the creation of recreational rest areas are carried out in accordance with the main activity of the call for applications A., including points 1, 3 and 4. The construction of mandatory car parks, as well as the development of transport routes, the location of street furniture and the installation of lighting is carried out as a non-assistive and optional activity on their own. ACTIVITIES THAT ARE NOT ELIGIBLE INDEPENDENTLY AND ARE TO BE CARRIED OUT ON A MANDATORY BASIS: Accessibility in proportion to the project, energy efficiency measures, publicity, partnership planning, implementation of SOFT activities are also achieved. Asbestos removal is not relevant. Basic charging infrastructure for the use of electric vehicles is also being deployed. PREPARATORY ACTIVITIES: During the preparation of the project, the needs assessment and utilisation plan were prepared. Milestone 2 will be submitted to the Feasibility Study, the Cost-Benefit Analysis and the ITS. In milestone 2, the licensee-level and the construction plans, as well as the substantive planning budget, will be completed and the procurement procedure will be carried out. ADDITIONAL ACTIVITIES RELATED TO IMPLEMENTATION: Activities essential to the implementation of the project will be carried out: project management, technical inspection. (English)
    9 February 2022
    0 references
    L’objectif du projet est de réhabiliter une zone vide et dégradée autrefois utilisée comme camp de jeunes, de construire un nouveau bâtiment économe en énergie, de renouveler et de développer des surfaces vertes et de le remplir d’un complexe sportif. Avec l’expansion des installations récréatives, la zone actuellement inexploitée devient une zone de repos actif de plusieurs groupes d’âge. LIEU: Le site de mise en œuvre du projet se trouve à environ 1,6 km du centre historique de la ville, près de la centrale hydroélectrique Kiskörei, au début de la zone de loisirs, sur la ligne Platár. La mise en œuvre du projet est conforme au plan de construction de la ville, au Règlement sur la construction locale et au plan de réglementation de la ville. Les lieux de mise en œuvre sont les propriétés nos 2280/6 et 2280/7, détenues à 100 % par la municipalité de Kisköre. Le site de mise en œuvre est l’Espace économique marqué KG1 conformément au plan de réglementation: il s’agit d’une zone de service commerciale et est donc conforme au point 3.4.1 de l’appel à propositions. La ville a déjà une stratégie intégrée de développement urbain, dont les activités sont synchronisées avec les objectifs de base de notre application. Cependant, il est nécessaire de développer les STI conformément aux exigences légales, qui sont actuellement en cours, de sorte que le demandeur s’engage à compléter le STI pendant la période de développement du projet et à être soumis dans le cadre de l’étape 2. NATURE DES FRICHES INDUSTRIELLES DE LA RÉGION: Le site d’aménagement est situé dans la partie est de la ville, à l’extérieur du centre historique du village, au début de la zone de loisirs du lac Tisza. Auparavant, la région avait une fonction économique et était utilisée pour gérer un camp de jeunes. Dans la partie sud de la zone, il y a cinq petits bâtiments (environ 30 m²) à l’état dégradé et un bâtiment d’environ 150 m², qui est également dégradé. Dans la région, il y a un terrain de sport en béton pavé avec une surface fragmentée, mauvais état, ainsi que quelques meubles d’extérieur mal conditionnés (banc, collecte des déchets). Dans le nord, il y a des vestiges de la fondation d’un ancien bâtiment. Récemment, l’état de la zone s’est détérioré et n’a pu être utilisé à quelque fin que ce soit. Le site de développement répond donc aux critères du site contaminé figurant dans la liste des termes de l’appel à propositions, car il s’agissait d’une ancienne zone économique dans un état physique dégradé qui était hors d’usage. ACTIVITÉS DU PROJET: Au cours de la mise en œuvre du projet, un complexe sportif sera développé avec la création de fonctions sportives, actives et passives, sur lesquelles plusieurs terrains de sport (champ de football artificiel, terrain de sport multifonctionnel: handball, basket-ball, football, tennis) et un bâtiment adapté à différents types de sports. Une partie importante du projet est le renouvellement des surfaces vertes, la plantation de plantes et la création d’aires de repos récréatif. Le développement sera réalisé conformément aux exigences de l’OTÉK et répondant aux critères d’accessibilité. Selon les critères d’éligibilité, les activités du projet sont les suivantes: ACTIVITÉ DE RELANCE ÉCONOMIQUE AUTOSUFFISANTE À EXERCER SUR UNE BASE OBLIGATOIRE: Les terrains de sport extérieurs dans le complexe sportif et les installations sportives disponibles dans le bâtiment (squash, salle de jeux, salle de gym, salle de sport miroir, jacuzzi) seront utilisés moyennant un supplément. Une salle buffet est également aménagée dans le bâtiment. La fonction à développer peut être classée au point 3 de l’activité principale de l’appel à propositions, y compris les activités de relance économique. En tant qu’activité de soutien indépendante, l’organisation des terrains de sport en plein air et des surfaces vertes autour du bâtiment et la création d’aires de repos récréatif sont réalisées conformément à l’activité principale de l’appel à candidatures A., y compris les points 1, 3 et 4. La construction de parkings obligatoires, ainsi que l’aménagement des voies de transport, l’emplacement du mobilier urbain et l’installation d’éclairage sont effectués en tant qu’activité non-assistive et facultative. LES ACTIVITÉS QUI NE SONT PAS ÉLIGIBLES DE MANIÈRE INDÉPENDANTE ET QUI DOIVENT ÊTRE EXERCÉES SUR UNE BASE OBLIGATOIRE: L’accessibilité proportionnelle au projet, les mesures d’efficacité énergétique, la publicité, la planification des partenariats, la mise en œuvre des activités SOFT sont également assurées. L’élimination de l’amiante n’est pas pertinente. Une infrastructure de recharge de base pour l’utilisation des véhicules électriques est également déployée. ACTIVITÉS PRÉPARATOIRES: Au cours de la préparation du projet, l’évaluation des besoins et le plan d’utilisation ont été élaborés. L’étape 2 sera soumise à l’étude de faisabilité, à l’analyse coûts-avantages et à la STI. À l’étape 2, les plans de construction et les pla... (French)
    10 February 2022
    0 references
    Kisköre, Heves
    0 references

    Identifiers

    TOP-2.1.1-16-HE1-2017-00001
    0 references