New ENERGY DEVELOPMENT at DroidX Kft. (Q3935107)

From EU Knowledge Graph
Revision as of 22:54, 14 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: fix budget)
Jump to navigation Jump to search
Project Q3935107 in Hungary
Language Label Description Also known as
English
New ENERGY DEVELOPMENT at DroidX Kft.
Project Q3935107 in Hungary

    Statements

    0 references
    7,947,500.0 forint
    0 references
    22,467.58 Euro
    0.002827 Euro
    14 February 2022
    0 references
    14,450,000.0 forint
    0 references
    40,850.15 Euro
    0.002827 Euro
    14 February 2022
    0 references
    55.0 percent
    0 references
    1 September 2020
    0 references
    31 December 2021
    0 references
    DROIDX Ipari, Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság
    0 references
    0 references

    47°6'20.38"N, 17°33'31.43"E
    0 references
    Jelen fejlesztés keretében egy 50Kw-os rendszer kerül kiépítésre. Az épület jelenlegi energiafogyasztása a számlák alapján: 364 979 kWh. A fejlesztés eredményeként a primer energiafogyasztásunk jelentősen csökkeni fog. A fejlsztés tartalma: Sharp 330 Wp napelem 150 db SMA STP 50-4 1db (inverter) DC-AC védelmi berendezések 1 db Telepítéshez szükséges villamos anyagok 1 db Tűzeseti leválasztó 1 db Szerelési segédanyagok (védőcső) 1 db (Hungarian)
    0 references
    As part of this development, a 50Kw system will be installed. Current energy consumption of the building based on invoices: 364 979 kWh. As a result of the development, our primary energy consumption will be significantly reduced. Content of the development: Sharp 330 Wp solar panel 150 pcs SMA STP 50-4 1pcs (inverter) DC-AC protection equipment 1 pcs electrical materials for installation 1 fire separator 1 pcs mounting aids (protection tube) 1 pc (English)
    8 February 2022
    0 references
    Dans le cadre de ce développement, un système de 50Kw sera installé. Consommation énergétique actuelle du bâtiment sur la base des factures: 364 979 kWh. Grâce à ce développement, notre consommation d’énergie primaire sera considérablement réduite. Contenu du développement: Panneau solaire de 330 Wp 150 pcs SMA STP 50-4 1pcs (onduleur) Équipement de protection DC-AC 1 pcs matériaux électriques pour l’installation 1 séparateur d’incendie 1 pcs aides de montage (tube de protection) 1 pc (French)
    10 February 2022
    0 references
    Ajka, Veszprém
    0 references