Energy modernisation at the company’s site in Csorna (Q3934988)

From EU Knowledge Graph
Revision as of 22:51, 14 February 2022 by DG Regio (talk | contribs) (‎Removed claims)
Jump to navigation Jump to search
Project Q3934988 in Hungary
Language Label Description Also known as
English
Energy modernisation at the company’s site in Csorna
Project Q3934988 in Hungary

    Statements

    0 references
    1 August 2020
    0 references
    31 December 2021
    0 references
    Kristóf József Tamás egyéni vállakozó
    0 references
    0 references

    47°38'18.42"N, 17°14'50.96"E
    0 references
    • A projekt keretén belül a cég tulajdonában levő 9300 Csorna, Soproni út 23/a, hrsz: 176/5 szám alatti ingatlanon található 2 db épület energetikai fejlesztése valósulna meg. Mindkét épület energetikai minőség szerinti jelenlegi besorolása JJ és a fejlesztés után BB minősítést érne el az 1-es épület és CC minősítést érne el a 2-es épület o A két épület esetében a fűtött alapterület összesen: 367,19 m2, (64,88 m2 + 302,31 m2) fűtött térfogat összesen: 1572,80 (170,6 m3+1402,2 m3) és CO2 kibocsájtás összesen/év: 75,76 t. o emeletráépítés az 1-es épület esetében nem valósul meg a projekt keretében és ezen tény figyelembevételével készültek az árajánlatok és az energetikai auditok mind az 1-es és mind a 2-es épületre vonatkozóan. o A projekt keretén belül az alábbi tevékenységek valósulnak meg: Komplett Fűtési, hűtési rendszer korszerűsítés, Fűtött és fűtetlen teret elválasztó, nyílászárók cseréje energiamegtakarítást eredményező korszerűsítés érdekében,  ? Az 1-es épületen (porta-iroda épülete) 136 m2 felület hőszigetelése valósul meg 16 cm-es hungarocell felragasztásával, háló beágyazással, kétszeri gletteléssel, alapozással és 1,5 mm-es kapart vakolattal. Fűtés korszerűsítés klímával, illetve a mellékhelyiségekben NOBO fűtő panel. valamint nyílászáró csere melyek összfelülete: 12,24 m2 illetve 3 db 90-es ajtó beszerelése. ? A 2-es épület esetében (műhely-szortírozó üzem) 264 m2 felület hőszigetelése valósul meg 16 cm-es hungarocell felragasztásával, háló beágyazással, kétszeri gletteléssel, alapozással és 1,5 mm-es kapart vakolattal. Nyílászáró csere is megvalósul és a behelyezendő szekciónált kapuk (1 db 3000*3000, 5 db 1500*2124) összfelülete 29,86 m2. Hőszigetelő állmennyezet kiépítése nem valósul meg a projekt keretében o Fűtött és fűtetlen teret elválasztó, nem nyílászáró szerkezetnek minősülő épülethatároló szerkezetek hőszigetelése. Az épület nem közhasznú, közhasználatú, így az akadálymentességet nem kell biztosítani. o 30,78kWp névleges teljesítményű napelemes kiserőmű telepítése a szükséges villamos energia biztosítására. o az eredetileg becsatolt 01_Szakétői nyilatkozatok nem változtak mivel a felmérés során eleve a bővítés-ráépítés nélkül készültek a felmérések és az energetikai auditok is. • A projekt megvalósítása végett rendelkezünk a szükséges tervekkel és árajánlatokkal. A beruházás tekintve, hogy nem tartalmaz emeletráépítést illetve bővítést nem építési engedély köteles. (Hungarian)
    0 references
    • Within the framework of the project, 9300 Csorna, Soproni út 23/a, hrsz: The energy development of 2 buildings located on the property number 176/5 would be realised. The current energy quality rating of both buildings would be JJ and after the development the BB rating would be achieved by building 1 and the CC rating for Building 2 o The total heated floor area for the two buildings is: Total heated volume of 367.19 m² (64.88 m² + 302.31 m²): 1572,80 (170.6 m³+ 1 402.2 m³) and CO2 emissions total/year: 75.76 t. o floor construction of building 1 is not carried out in the framework of the project and the price quotations and energy audits have been carried out in view of this fact for both Buildings 1 and 2. o. The following activities will be carried out within the framework of the project: Complete heating, cooling system upgrade, Heated and unheated space separation, replacement of doors and windows for energy-saving upgrades? On building 1 (porta office building) 136 m² surface is insulated by gluing 16 cm hungarorocell, mesh embedded, double glet filling, foundation and 1.5 mm scrape plaster. Heating upgrade with air conditioning, NOBO heating panel in the toilets and replacement of doors and windows: Installation of 12.24 m² and 3 doors of 90. In the case of building 2 (workshop-sorting plant), a surface of 264 m² is thermally insulated by gluing 16 cm of hungarocell, net embedding, double glet filling, foundation and 1.5 mm scraped plaster. There is also a change of doors and the total surface area of the gates (1 3000*3000, 5 1500*2124) at the section to be inserted is 29.86 m². In the framework of the project the thermal insulation of building envelopes that are not considered as windows are not realised in the framework of the project o Heated and unheated space. The building is not of public use or used in the public domain and therefore accessibility is not required. O Installation of a small solar power plant with a nominal capacity of 30.78kWp to provide the necessary electricity. o the originally attached 01_Stakeholder declarations have not changed since surveys and energy audits were carried out without expansion. • We have the necessary plans and quotations to complete the project. In view of the fact that the investment does not involve building floors or extensions, no building permit is required. (English)
    8 February 2022
    0 references
    • Dans le cadre du projet, 9300 Csorna, Soproni út 23/a, hrsz: Le développement énergétique de 2 bâtiments situés sur le no 176/5 serait réalisé. L’évaluation actuelle de la qualité énergétique des deux bâtiments serait JJ et, après le développement, la cote BB serait obtenue par le bâtiment 1 et la cote CC pour le bâtiment 2 o La surface totale au sol chauffée pour les deux bâtiments est: Volume chauffé total de 367,19 m² (64,88 m² + 302,31 m²): 1572,80 (170,6 m³+ 1 402,2 m³) et émissions de CO2 totales/an: 75,76 t. o la construction au sol du bâtiment 1 n’est pas réalisée dans le cadre du projet et les prix et les audits énergétiques ont été réalisés à la fois pour les bâtiments 1 et 2. Les activités suivantes seront menées dans le cadre du projet: Chauffage complet, mise à niveau du système de refroidissement, séparation des espaces chauffants et non chauffés, remplacement des portes et des fenêtres pour des améliorations économes en énergie? Sur le bâtiment 1 (bâtiment de bureaux porta) la surface de 136 m² est isolée par collage 16 cm hungarorocell, maille encastrée, double remplissage de glet, fondation et plâtre de ferraille de 1,5 mm. Mise à niveau du chauffage avec climatisation, panneau de chauffage NOBO dans les toilettes et remplacement des portes et fenêtres: Installation de 12,24 m² et 3 portes de 90. Dans le cas du bâtiment 2 (usine de triage d’ateliers), une surface de 264 m² est isolée thermiquement par collage de 16 cm de hungarocell, d’encastrement net, de remplissage double glet, de fondation et de plâtre gratté de 1,5 mm. Il y a également un changement de portes et la surface totale des portes (1 3000*3000, 5 1500*2124) à la section à insérer est de 29,86 m². Dans le cadre du projet, l’isolation thermique des enveloppes du bâtiment qui ne sont pas considérées comme des fenêtres ne sont pas réalisées dans le cadre du projet o Espaces chauffants et non chauffés. Le bâtiment n’est ni d’usage public ni utilisé dans le domaine public et l’accessibilité n’est donc pas nécessaire. O l’installation d’une petite centrale solaire d’une capacité nominale de 30,78 kWp pour fournir l’électricité nécessaire. • Nous avons les plans et les devis nécessaires pour mener à bien le projet. Compte tenu du fait que l’investissement ne concerne ni planchers ni extensions, aucun permis de construire n’est requis. (French)
    10 February 2022
    0 references
    Csorna, Győr-Moson-Sopron
    0 references

    Identifiers

    GINOP-4.1.4-19-2020-01891