Building energy development at Monden Market Kft. (Q3934574)

From EU Knowledge Graph
Revision as of 22:42, 14 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: fix budget)
Jump to navigation Jump to search
Project Q3934574 in Hungary
Language Label Description Also known as
English
Building energy development at Monden Market Kft.
Project Q3934574 in Hungary

    Statements

    0 references
    0 references
    80,189,732.7 forint
    0 references
    226,696.37 Euro
    0.002827 Euro
    14 February 2022
    0 references
    145,799,514.0 forint
    0 references
    412,175.23 Euro
    0.002827 Euro
    14 February 2022
    0 references
    55.0 percent
    0 references
    1 February 2020
    0 references
    31 January 2022
    0 references
    Monden Market Korlátolt Felelősségű Társaság
    0 references
    0 references

    47°13'44.83"N, 16°37'7.54"E
    0 references
    A projekt során az alábbi tevékenységek valósulnak meg: A projekt során eddig elkészültek az energetikai számítások, elkészültek a tervek. A projekt legfontosabb következő lépései a kivitelezési munkák megrendelése, és a kivitelezés nyomon követése, dokumentálás és elszámolás. A megvalósítás során külsős, tapasztalattal rendelkező projkektmenedzser segíti majd a megvalósítást. Megvalósítani kívánt célterületek: A. Megújuló energiafelhasználás növelését célzó tevékenységek III. Napelemes rendszer telepítése hálózati villamosenergia-termelés céljából, kizárólag a fejlesztésben érintett épület és az abban folyó gazdasági-termelési folyamatok villamosenergia-ellátásához Ide terveztünk be 1200db panelből álló, Luxor Eco Line MonoPERC 405WP Monokristályos napelemekből álló, összesen 486 kWp teljesítményű napelemrendszer díját. A napelemek a tetőn kerülnek elhelyezésre. A rendszerhez 5 db SolarEdge 3 Phase SE82,8K Inverter tartozik. (Hungarian)
    0 references
    The following activities will be carried out during the project: In the course of the project, energy calculations have been completed so far, and the plans have been completed. The most important next steps of the project are the ordering of construction works and the monitoring, documentation and accounting of the implementation. The implementation will be supported by an external and experienced projkekt manager. Target areas to be achieved: A. Activities to increase renewable energy use III. Installation of a solar system for grid electricity generation, exclusively for the electricity supply of the building involved in the development and the economic and production processes involved in the development. This is the time when we planned the charge of a solar system consisting of 1200pcs panels, Luxor Eco Line MonoPERC 405WP Monocrystalline solar panels with a total capacity of 486 kWp. Solar panels are placed on the roof. The system includes 5 SolarEdge 3 Phase SE82,8K Inverters. (English)
    8 February 2022
    0 references
    Les activités suivantes seront menées au cours du projet: Dans le cadre du projet, les calculs de l’énergie ont été achevés jusqu’à présent et les plans ont été achevés. Les prochaines étapes les plus importantes du projet sont la commande des travaux de construction et le suivi, la documentation et la comptabilité de la mise en œuvre. La mise en œuvre sera soutenue par un gestionnaire projkekt externe et expérimenté. Domaines cibles à atteindre: A. Activités visant à accroître l ' utilisation des énergies renouvelables III. Installation d’un système solaire pour la production d’électricité du réseau, exclusivement pour la fourniture d’électricité du bâtiment impliqué dans le développement et les processus économiques et de production impliqués dans le développement. C’est le moment où nous avons prévu la charge d’un système solaire composé de 1200pcs panneaux, Luxor Eco Line MonoPERC 405WP Monocrystalline panneaux solaires d’une capacité totale de 486 kWp. Des panneaux solaires sont placés sur le toit. Le système comprend 5 onduleurs SolarEdge 3 Phase SE82,8K. (French)
    10 February 2022
    0 references
    Szombathely, Vas
    0 references

    Identifiers

    GINOP-4.1.4-19-2020-01304
    0 references