Increase the energy efficiency of K Z INVEST Kft. (Q3934178)

From EU Knowledge Graph
Revision as of 22:34, 14 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: fix budget)
Jump to navigation Jump to search
Project Q3934178 in Hungary
Language Label Description Also known as
English
Increase the energy efficiency of K Z INVEST Kft.
Project Q3934178 in Hungary

    Statements

    0 references
    4,323,440.0 forint
    0 references
    12,222.36 Euro
    0.002827 Euro
    14 February 2022
    0 references
    7,860,800.0 forint
    0 references
    22,222.48 Euro
    0.002827 Euro
    14 February 2022
    0 references
    55.0 percent
    0 references
    1 June 2020
    0 references
    5 April 2021
    0 references
    K Z INVEST Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság
    0 references
    0 references

    47°48'56.59"N, 21°30'2.45"E
    0 references
    A fejlesztés során kialakításra kerülne egy komplett napelemes rendszer, amely 80 db Trina HoneyM TSM-340 Wp panelből, az ehhez tartozó 1 db SMA STP 25000 TL-30 inverterbőll és a hozzá tartozó tetőre kerülő állványzatból áll. A fejlesztést megelőzően felmérték a tető méretét, a szükséges energiaigényt. A fejlesztésre vonatkozóan megkérték, hogy nem építési engedélyköteles a beruházás. Statikus és energetikus került alkalmazásra a fennálló feltételek megismerésének érdekében. Több napelemet forgalmazó cégtől kértek árajánlatot a legjobb ár-érték arány megtalálásának érdekében. Igény bejelentő kerül megküldésre a szolgáltató részére. A lehetséges szállító garantálja a szakszerű ellátást, szervizelést, megfelelő garanciális háttérrel rendelkezik. A projekt elvégzéshez szükséges menedzsment feladatok ellátásról az ügyvezető igazgató és egy külsős projektmenedzser felelős. A felelősek szorosan együttműködnek a pénzügyi feltételek megteremtését követően a kiválasztott szállítóval és a műszaki ellenőrrel. A beszerelést követően a kivitelezővel együttműködve megkötik a hálózati csatlakozási szerződést, majd ezt követően műszaki ellenőrzés és próbaüzem következik, amennyiben nem észlelhető probléma megtörténik a fejlesztés átadása. A kivitelező kiadja a teljesítmény nyilatkozatot, a távfelügyeletet biztosítja. A 80 db napelem együttes maximális névleges teljesítménye 27200 Wp, amely összesen 2 körön csatlakozik az inverter munkapontjaira. A csatlakozáshoz 4, illetve 6 mm2-es napelemekhez kifejlesztett dupla szigetelt, UV álló kábel kerül alkalmazásra. Az inverter előtt kialakított túlfeszültség és túláram védelmi berendezések gondoskodnak rendszer egyenáramú oldali védelméről. A háromfázisú inverterek elmenő vezetékei 0,4 kV-os kábelen csatlakoznak a hálózatra egy-egy önálló 32 A-es kismegszakítón keresztül. A rendszer normál üzemben automatikusan működik. A napelem táblák az időjárás viszontagságainak ellenállnak. A megvásárolni kívánt panel innovatív módon elrendezett elemekkel (cellákkal) és az azok gyártására vonatkozó új technológiával rendelkezik. Ezzel az újítással nagyobb teljesítmény és élettartam érhető el. Ezáltal fokozható a megtérülési ráta és a cég költségei csökkennek. A fejlesztés a kevesebb szolgáltatói villamos energia felhasználással és a megújuló energia használatával óvja a környezetet és hozzájárul a természeti értékek megőrzéséhez, illetve üvegházhatást okozó gázok kibocsátásának csökkentéséhez. Az új építési épület tetőszerkezete megfelel az előírásoknak. (Hungarian)
    0 references
    During the development, a complete solar panel system would be set up, consisting of 80 Trina HoneyM TSM-340 Wp panels, 1 SMA STP 25000 TL-30 inverter and the related scaffolding on the roof. Before the development, the size of the roof and the required energy demand were assessed. With regard to the development, it was requested that the project was not subject to a construction permit. Static and energetic was used to understand the prevailing conditions. A number of solar panel companies were asked for quotations to find the best value for money. A claim notification will be sent to the service provider. The potential supplier guarantees professional care, servicing, and has a proper warranty background. The managing director and an external project manager are responsible for the management tasks required to perform the project. They shall cooperate closely with the selected supplier and the technical inspector once the financial conditions have been established. After installation, the network connection contract will be concluded in cooperation with the contractor, and then technical inspection and testing will be carried out if no detectable problem is transferred. The contractor issues a declaration of performance and ensures remote monitoring. The maximum rated power of 80 solar panels is 27200 Wp, connected to the inverter’s working points for a total of 2 rounds. Double insulated UV standing cables for 4 and 6 mm² solar panels are used for connection. Overvoltage and over current protection devices before the inverter ensure the DC side protection of the system. The three-phase inverters are connected to the network via a 0.4 kV cable via a stand-alone 32 A cut-off. The system operates automatically in normal operation. Solar panels are resistant to weather conditions. The panel to be purchased has innovatively arranged elements (cells) and new technology for their production. With this innovation, greater performance and life can be achieved. This will increase the rate of return and reduce the company’s costs. The development will protect the environment by using less electricity suppliers and renewable energy and contribute to the preservation of natural assets and the reduction of greenhouse gas emissions. The roof structure of the new building meets the requirements. (English)
    8 February 2022
    0 references
    Au cours du développement, un système complet de panneaux solaires serait mis en place, comprenant 80 panneaux Trina HoneyM TSM-340 Wp, 1 onduleur SMA STP 25000 TL-30 et l’échafaudage connexe sur le toit. En ce qui concerne le développement, il a été demandé que le projet ne soit pas soumis à un permis de construire. Statique et énergétique ont été utilisés pour comprendre les conditions prévalant. Un certain nombre d’entreprises de panneaux solaires ont été invitées à obtenir des devis pour trouver le meilleur rapport qualité-prix. Une notification de réclamation sera envoyée au prestataire de services. Le fournisseur potentiel garantit des soins professionnels, l’entretien, et a une bonne base de garantie. Le directeur général et un chef de projet externe sont responsables des tâches de gestion nécessaires à l’exécution du projet. Ils coopèrent étroitement avec le fournisseur sélectionné et l’inspecteur technique une fois les conditions financières établies. Après l’installation, le contrat de raccordement au réseau sera conclu en coopération avec le contractant, puis un contrôle technique et des essais seront effectués si aucun problème détectable n’est transféré. Le contractant émet une déclaration de performance et assure un suivi à distance. La puissance nominale maximale de 80 panneaux solaires est de 27200 Wp, reliée aux points de travail de l’onduleur pour un total de 2 tours. Des câbles UV isolés doubles pour des panneaux solaires de 4 et 6 mm² sont utilisés pour le raccordement. Les dispositifs de protection contre les surtensions et les surintensités avant l’onduleur assurent la protection latérale CC du système. Les onduleurs triphasés sont connectés au réseau via un câble de 0,4 kV via une coupure autonome de 32 A. Le système fonctionne automatiquement en fonctionnement normal. Les panneaux solaires résistent aux conditions météorologiques. Le panneau à acheter dispose d’éléments (cellules) disposés de manière innovante et de nouvelles technologies pour leur production. Grâce à cette innovation, plus de performance et de vie peuvent être réalisées. Cela augmentera le taux de rendement et réduira les coûts de l’entreprise. Le développement protégera l’environnement en utilisant moins de fournisseurs d’électricité et d’énergie renouvelable et contribuera à la préservation des actifs naturels et à la réduction des émissions de gaz à effet de serre. La structure du toit du nouveau bâtiment répond aux exigences. (French)
    10 February 2022
    0 references
    Hajdúdorog, Hajdú-Bihar
    0 references

    Identifiers

    GINOP-4.1.4-19-2020-00738
    0 references