Installation of a solar system at the Perfekt Motor Renovation Ltd. in Tata
Project Q3934147 in Hungary

    Statements

    0 references
    1 June 2020
    0 references
    31 August 2022
    0 references
    PERFEKT MOTORFELÚJÍTÁS Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság
    0 references
    0 references

    47°39'0.32"N, 18°19'5.27"E
    0 references
    A Perfekt Motorfelújítás Kft. önfogyasztás csökkentő beruházása 3 épületen valósul meg. A napelemes rendszerek össz. DC oldali névleges villamos teljesítménye 40,95 kWp lesz, az inverterek névleges csatlakozási teljesítménye 37,6 kVA, ezért a tevékenység nem építési engedély köteles (ld 2007. évi LXXXVI. törvény a villamos energiáról 116.§/ 3./ a). A fotovillamos rendszer az épület belső 0,4 kV-os hálózatára táplálja fel a megtermelt energiát. A tervezett napelemes rendszer ferde és lapos tetőre kerül fel. A ferde tetős irodára 36 db, a lapos tetős irodára 72 db, míg a műhelyre 22 db Hyundai HiE-S315RG típusú, 315W-os napelempanel kerül felhelyezésre. Két darab SolarEdge SE típusú inverterrel lesz ellátva a rendszer: egy 27,6kVA-es a műhelyhez és a lapos tetős iroda, egy 10kVA-es a ferde tetős iroda rendszeréhez kapcsolódóan. A projekt tervezése során bekértük az elmúlt 12 havi villamosenergia fogyasztását a megvalósítási helyszínnek, majd az összesített fogyasztási adatok alapján ajánlatokat kértünk be. Az ajánlati és a fogyasztási adatokat energetikai szakértővel megvizsgáltattuk, és felkértük a szakértői nyilatkozat elkészítésére. A kiválasztott rendszerteljesítmény alapján elkészíttettük a tervdokumentációt, majd a panel db-számok és típusok ismeretének fényében statikussal nézettük át az épületet, aki megállapította, hogy a tetőszerkezet teherbírása megfelelő, megerősítés nem szükséges. Egyeztettünk műszaki ellenőrrel a megvalósítás során szükséges feladatok ellátásának vonatkozásában. A projekt fizikai megvalósításával olyan kivitelezőt bízunk meg, akinek kellő szakmai tapasztalata és megfelelő referenciái vannak napelemes rendszerek telepítésének területén. A projekt lebonyolításában projektmenedzser segédkezik, továbbá a cégen belül kijelölt kapcsolattartó is több pályázat kivitelezésének és elszámolásának szakmai tapasztalatával rendelkezik. (Hungarian)
    0 references
    Perfekt Engine Renovation Ltd.'s self-consumption reduction investment is carried out on 3 buildings. The solar panel systems are total. DC side rated electric power will be 40,95 kWp, the nominal connection power of the inverters is 37.6 kVA, therefore the activity is not subject to building permit (see Act LXXXVI of 2007 on electricity § 116/3./a). The PV system feeds the energy generated to the 0.4 kV internal network of the building. The planned solar system is placed on an oblique and flat roof. The inclined roof office is equipped with 36 pcs, the flat roof office 72 and the workshop 22 Hyundai HiE-S315RG, 315 W solar panels. Two SolarEdge SE type inverters will be provided: a 27.6kVA for the workshop and the flat roof office, a 10kVA for the slanted roof office system. During the planning of the project, we requested the electricity consumption of the last 12 months to the site of implementation, then we asked for offers based on the aggregated consumption data. We had the bid and consumption data examined by an energy expert and asked for the expert statement. Based on the selected system performance, we had the design documentation prepared, and in the light of the knowledge of the panel numbers and types, we reviewed the building with static, who found that the roof structure had sufficient load capacity, no reinforcement was required. We have consulted the Technical Inspector regarding the performance of the tasks required in the course of the implementation. The physical implementation of the project is entrusted to a contractor with sufficient professional experience and appropriate references in the field of installation of solar systems. The project manager assists in the implementation of the project, and the contact person appointed within the company also has professional experience in the execution and accounting of several applications. (English)
    8 February 2022
    0 references
    L’investissement d’autoconsommation de Perfekt Engine Renovation Ltd. est réalisé dans 3 bâtiments. Les systèmes de panneaux solaires sont totaux. La puissance électrique nominale en courant continu sera de 40,95 kWp, la puissance nominale de raccordement des onduleurs est de 37,6 kVA, l’activité n’est donc pas soumise à un permis de construire (voir loi LXXXVI de 2007 sur l’électricité, § 116/3./a). Le système PV alimente l’énergie produite dans le réseau interne de 0,4 kV du bâtiment. Le système solaire prévu est placé sur un toit oblique et plat. Le bureau de toit incliné est équipé de 36 pcs, le bureau de toit plat 72 et l’atelier 22 Hyundai HiE-S315RG, panneaux solaires 315 W. Deux onduleurs de type SolarEdge SE seront fournis: un 27.6kVA pour l’atelier et le bureau de toit plat, un 10kVA pour le système de bureau de toit incliné. Lors de la planification du projet, nous avons demandé la consommation d’électricité des 12 derniers mois sur le site de mise en œuvre, puis nous avons demandé des offres basées sur les données agrégées de consommation. Nous avons examiné les données de l’offre et de la consommation par un expert en énergie et nous avons demandé la déclaration de l’expert. Sur la base de la performance du système sélectionnée, nous avons préparé la documentation de conception et, à la lumière de la connaissance des numéros et des types de panneaux, nous avons examiné le bâtiment avec statique, qui a constaté que la structure du toit avait une capacité de charge suffisante, aucun renforcement n’était nécessaire. Nous avons consulté l’inspecteur technique sur l’exécution des tâches requises au cours de la mise en œuvre. La mise en œuvre matérielle du projet est confiée à un contractant possédant une expérience professionnelle suffisante et des références appropriées dans le domaine de l’installation de systèmes solaires. Le chef de projet assiste dans la mise en œuvre du projet, et la personne de contact nommée au sein de l’entreprise possède également une expérience professionnelle dans l’exécution et la comptabilité de plusieurs applications. (French)
    10 February 2022
    0 references
    Tata, Komárom-Esztergom
    0 references

    Identifiers

    GINOP-4.1.4-19-2020-00694
    0 references