Performing tasks related to the preparation and implementation of broadband developments (Q3924871)

From EU Knowledge Graph
Revision as of 21:41, 14 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: fix budget)
Jump to navigation Jump to search
Project Q3924871 in Hungary
Language Label Description Also known as
English
Performing tasks related to the preparation and implementation of broadband developments
Project Q3924871 in Hungary

    Statements

    0 references
    2,200,000,000.0 forint
    0 references
    6,219,400.0 Euro
    0.002827 Euro
    14 February 2022
    0 references
    2,200,000,000.0 forint
    0 references
    6,219,400.0 Euro
    0.002827 Euro
    14 February 2022
    0 references
    100.0 percent
    0 references
    1 November 2016
    0 references
    31 December 2021
    0 references
    KORMÁNYZATI INFORMATIKAI FEJLESZTÉSI ÜGYNÖKSÉG
    0 references
    0 references

    47°29'30.62"N, 18°58'44.15"E
    0 references
    1. Program tervezési tevékenységek Magyarország szélessávú lefedettségének kiterjesztése érdekében a GINOP-3.4.1-15 felhívásban meghirdetett járási támogatási kérelmek értékelését (I. ütem) követően lefedetlen igényhelyek kimaradására lehet számítani. A 1162/2014. (III. 25.) Korm. határozatban rögzített 100%-os lefedettség 2018-ig történő elérése érdekében három ütemben meghatározott feladatok elvégzése szükséges, amelyek közül a II. és III ütem tevékenységei e felhívás keretében támogatottak. II. ütemben: A GINOP-3.4.1-15-ben megvalósított első ütemű támogatási kérelmek értékelése után kimaradó területek a szórvány beépítésű, tanyajellegű településszerkezet okán gazdaságosan nagy valószínűséggel vezeték nélküli megoldásokkal fedhetők le. Sikeres fejlesztések megvalósítása érdekében szükséges tevékenységek: • a kimaradó igényhelyek elhelyezkedésének területi azonosítása, az első ütemű mapping adatok validálása, szükség esetén részleges vagy teljes új felmérés elkészítése; • nagy földrajzi kiterjedésű területek szélessávú internet ellátására alkalmas technológiák felmérése; • üzleti modellezés a fenntartható szolgáltatás földrajzi és technológiai lehatárolására, az alapvető műszaki és szolgáltatási paraméterek meghatározására; • második ütemben kiírandó pályázatok feltételrendszerének kidolgozása, földrajzi kiterjedés lehatárolása, pályáztatási egységek és a pénzügyi feltételek meghatározása; • a pályázati felhívás műszaki mellékleteinek elkészítése; • pályáztatás során a műszaki értékelésből adódó feladatok teljes körű ellátása; • hálózat tervezése; • vezeték nélküli szolgáltatásokhoz adó toronyépítés, illetve szükség esetén megerősítés tervezése; • eszközök beszerzése (bázisállomás, antenna, telepítési anyagok) tervezése, előkészítése; • gerinchálózati bővítés és kapacitás-bővítés tervezése; • telephely infrastruktúra kialakítása (tápellátás, klíma, stb.) tervezése; • az internet szolgáltatás biztosításához kapcsolódó tervezés. III. ütemben: A szolgáltatók hároméves fejlesztési terveiben vállalt fejlesztések esetleges elmaradása további lefedetlen területként jelentkeznek. Ezért 2017 folyamán célzott ellenőrzés kerül végrehajtásra az önkéntes vállalások teljesítése vonatkozásában. A bármilyen okból nem teljesülő önerős szolgáltatói vállalások területeire harmadik ütemben pályázat kerül kiírásra. A harmadik ütemben kiírandó pályázatok tervezése előkészítése és lebonyolítása a II. ütemben tervezett tevékenységek szerint történik. Tekintve, hogy a programban megvalósuló fejlesztések érintenek minden kormányzati célú hálózatot, és külön feltétel rendszer került kidolgozásra a közintézmények korszerű NGA ellátására, ennek konzekvens megvalósítása a II. és a III. ütemben is szükséges. 2. Felügyelő mérnöki tevékenység Magyarország szélessávú lefedettségének kiterjesztése érdekében a GINOP-3.4.1-15 projektben meghirdetett járási pályázatok eredményhirdetését követően a közösségi források hatékony elköltése érdekében kormányzati oldalról követni és ellenőrizni szükséges a kedvezményezett szolgáltatók által megvalósított hálózatfejlesztéseket a projekt teljes befejezéséig (2018.12.31-ig). A szolgáltatók által hároméves távlatban vállalt önerős fejlesztési terveik megvalósítását az egységes szolgáltatás minőség biztosítása érdekében az NFM-el kötött megállapodás értelmében az állam ugyancsak követni és ellenőrizni jogosult. Tervezett tevékenységek: • A GINOP 3.4.1-15 Kedvezményezettek kiviteli tervezési és kivitelezési tevékenységének követése Tervezést felügyelő mérnök (TFEM) tevékenysége: • a kedvezményezett szolgáltatók által készített engedélyezési tervek és a nyertes pályázat műszaki mellékletében (pályázói tervben) foglaltak tartalmi egyezőségének ellenőrzése; • részvétel a szakhatósági ügyintézés során felmerülő problémák megoldásában; • kedvezményezett visszatérítendő támogatást is igénybe vétele esetén az MFB megbízásából műszaki ellenőri feladatok ellátása; • közvetítés az állami tulajdonú ingatlanok építési hozzájárulásának beszerzésében; • az NMHH szabályozáson felüli, a Tervezési és Hálózatépítési Ajánlásban (THA) foglalt formai és tartalmi követelmények teljesítésének ellenőrzése a kiviteli tervekben; • ellenőrzési jelentések, riportok, vezetői jelentések, valamint statisztikák készítése. Kivitelezést felügyelő mérnök (KFEM) tevékenysége: • az engedélyezési tervben foglalt műszaki tartalom tényleges megvalósulásának, azaz a hálózatok megépítésének mennyiségi (lefedettségi), minőségi (technológiai) és projekt ütemezési szempontú felügyelete; • kritikus hálózati csomópontokon, végpontokon a kivitelező közreműködésével műszeres mérések végzése; • ellenőrzési jelentések, riportok, vezetői jelentések, valamint statisztikák készítése. (Hungarian)
    0 references
    1. In order to extend the broadband coverage of Hungary, programme planning activities are expected to be missed following the assessment of district aid applications announced in the GINOP-3.4.1-15 call (Stage I). PARAGRAPH 1162/2014. (III. 25.) In order to achieve the 100 % coverage set out in the Government Decision by 2018, it is necessary to carry out tasks defined in three stages, of which the activities of Stage II and III are supported under this call. In phase II: After the evaluation of the first phase of aid applications implemented in GINOP-3.4.1-15, the areas left out are economically likely to be covered by wireless solutions due to the scattered, farm-like settlement structure. Activities needed to implement successful developments: • regional identification of the location of missing needs, validation of the first-stage mapping data and, if necessary, a partial or complete new survey; • assessment of broadband internet technologies in large geographical areas; • business modelling for the geographical and technological delimitation of sustainable services, the definition of basic technical and service parameters; • development of the criteria for proposals to be launched in the second phase, delimitation of geographical scope, tendering units and the definition of financial conditions; • preparation of technical annexes to the call for proposals; • full performance of the tasks resulting from the technical evaluation during tendering; • network design; • designing towers for wireless services and, if necessary, reinforcements; • planning and preparation of equipment (base station, antenna, installation materials); • planning for backbone expansion and capacity expansion; • planning of site infrastructure (power supply, climate, etc.); • planning related to the provision of internet service. In phase III: The potential lack of development undertaken in the three-year development plans of the service providers is an additional uncovered area. Therefore, a specific audit will be carried out in 2017 on the fulfilment of voluntary commitments. A third-stage tender will be launched for the areas of self-sufficiency commitments that are not fulfilled for any reason. The planning and implementation of the third phase proposals will be carried out according to the activities planned in Phase II. Given that all government networks are affected by the improvements in the programme and a special condition has been developed for the provision of modern NGA to public institutions, the consistent implementation of this system is also necessary in Phases II and III. 2. In order to extend the broadband coverage of Hungary, following the announcement of the results of the district tenders announced in the GINOP-3.4.1-15 project, it is necessary to monitor and monitor from the government the network developments implemented by the beneficiary service providers until the project is completed (31.12.2018) in order to efficiently spend community resources. Under the agreement concluded with the Ministry of National Development, the State is also entitled to monitor and monitor the implementation of the self-sufficiency development plans undertaken by the service providers over a three-year perspective in order to ensure uniform service quality. Planned activities: • Follow-up of the design and construction activities of GINOP 3.4.1-15 Beneficiaries Design Engineer (TFEM): • checking the consistency of the content of the licensing plans drawn up by the beneficiary service providers with those set out in the technical annex (candidate plan) of the winning tender; • participate in solving problems encountered in the administration of the administration; • in case of receipt of repayable assistance, the beneficiary performs tasks of technical inspector on behalf of the MFB; • intermediation in the acquisition of contributions to the construction of state-owned property; • verify compliance with the formal and content requirements set out in the Design and Networking Recommendation (THA) in the construction plans in addition to the NMHH regulation; • production of audit reports, reports, management reports and statistics. The activities of the engineer supervising the construction (KFEM): • overseeing the actual implementation of the technical content contained in the permit plan, i.e. the construction of networks in terms of quantitative (coverage), quality (technological) and project scheduling; • perform instrument measurements at critical network nodes and endpoints with the assistance of the contractor; • production of audit reports, reports, management reports and statistics. (English)
    8 February 2022
    0 references
    1. Afin d’étendre la couverture à large bande de la Hongrie, les activités de planification des programmes devraient être manquées à la suite de l’évaluation des demandes d’aide de district annoncée dans l’appel GINOP-3.4.1-15 (phase I). POINT 1162/2014. (III. 25.) Afin d’atteindre la couverture de 100 % prévue dans la décision gouvernementale d’ici 2018, il est nécessaire de mener à bien les tâches définies en trois étapes, dont les activités des phases II et III sont soutenues dans le cadre du présent appel. Dans la phase II: Après l’évaluation de la première phase des demandes d’aide mises en œuvre dans le GINOP-3.4.1-15, les zones exclues sont économiquement susceptibles d’être couvertes par des solutions sans fil en raison de la structure de peuplement éparse, semblable à celle des exploitations. Activités nécessaires pour mettre en œuvre des développements réussis: • l’identification régionale de l’emplacement des besoins manquants, la validation des données cartographiques de première étape et, le cas échéant, une nouvelle enquête partielle ou complète; • évaluation des technologies de l’internet à haut débit dans de grandes zones géographiques; • modélisation des entreprises pour la délimitation géographique et technologique des services durables, définition des paramètres techniques et de service de base; • l’élaboration des critères de lancement des propositions au cours de la deuxième phase, la délimitation du champ d’application géographique, les unités d’appel d’offres et la définition des conditions financières; • préparation des annexes techniques de l’appel à propositions; • l’exécution intégrale des tâches résultant de l’évaluation technique lors de l’appel d’offres; • conception du réseau; • conception de tours pour les services sans fil et, si nécessaire, de renforcements; • planification et préparation des équipements (station de base, antenne, matériel d’installation); • planification de l’expansion de l’épine dorsale et de l’expansion des capacités; • planification de l’infrastructure du site (approvisionnement en énergie, climat, etc.); • planification liée à la fourniture d’un service Internet. Dans la phase III: Le manque potentiel de développement entrepris dans les plans de développement triennal des fournisseurs de services est un autre domaine non couvert. Par conséquent, un audit spécifique sera réalisé en 2017 sur le respect des engagements volontaires. Un appel d’offres de troisième étape sera lancé pour les domaines d’engagements d’autosuffisance qui ne sont pas remplis pour quelque raison que ce soit. La planification et la mise en œuvre des propositions de la troisième phase seront réalisées conformément aux activités prévues au cours de la phase II. Étant donné que tous les réseaux gouvernementaux sont touchés par les améliorations apportées au programme et qu’une condition particulière a été mise en place pour la fourniture de NGA modernes aux institutions publiques, la mise en œuvre cohérente de ce système est également nécessaire dans les phases II et III. 2. Afin d’étendre la couverture haut débit de la Hongrie, à la suite de l’annonce des résultats des appels d’offres de district annoncés dans le projet GINOP-3.4.1-15, il est nécessaire de suivre et de suivre par le gouvernement les développements du réseau mis en œuvre par les prestataires de services bénéficiaires jusqu’à ce que le projet soit achevé (31.12.2018) afin de dépenser efficacement les ressources communautaires. En vertu de l’accord conclu avec le Ministère du développement national, l’État est également habilité à suivre et à suivre la mise en œuvre des plans de développement de l’autosuffisance entrepris par les prestataires de services sur une période de trois ans afin d’assurer une qualité de service uniforme. Activités prévues: • Suivi des activités de conception et de construction du GINOP 3.4.1-15 Bénéficiaires Design Engineer (TFEM): • vérifier la cohérence du contenu des plans d’octroi de licences établis par les prestataires de services bénéficiaires avec ceux figurant dans l’annexe technique (plan candidat) de l’offre retenue; • participer à la résolution des problèmes rencontrés dans l’administration de l’administration; • en cas de réception d’une aide remboursable, le bénéficiaire accomplit des tâches d’inspecteur technique pour le compte de la MFB; • l’intermédiation dans l’acquisition de contributions à la construction de biens appartenant à l’État; • vérifier le respect des exigences formelles et de contenu énoncées dans la recommandation sur la conception et la mise en réseau (THA) dans les plans de construction, en plus du règlement sur les HNH; • production de rapports d’audit, de rapports, de rapports de gestion et de statistiques. Les activités de l’ingénieur chargé de la construction (KFEM): • superviser la mise en œuvre effective du contenu technique contenu dans le plan d’autorisation, c’est-à-dire la construction de réseaux en termes quantitatifs (couverture), de qua... (French)
    10 February 2022
    0 references
    Budapest, Budapest
    0 references

    Identifiers

    GINOP-3.4.4-16-2016-00001