Energy renovation of public education buildings in the North-Hungary region (Q3944118)

From EU Knowledge Graph
Revision as of 15:01, 13 February 2022 by DG Regio (talk | contribs) (‎Removed claims)
Jump to navigation Jump to search
Project Q3944118 in Hungary
Language Label Description Also known as
English
Energy renovation of public education buildings in the North-Hungary region
Project Q3944118 in Hungary

    Statements

    0 references
    10 February 2017
    0 references
    31 December 2017
    0 references
    Egri Főegyházmegye
    0 references
    0 references

    47°55'40.91"N, 21°2'48.16"E
    0 references
    Az Egri Főegyházmegye a KEOP – 7.13.0/15 konstrukció keretében felmérte a leginkább leromlott állapotú épületeinek az energetikai állapotát. A projekt keretében a 10 db energetikailag leginkább fejlesztésre szoruló épületének a kiviteli terve is elkészítésre került. Jelen pályázat során a 10 épület közül 1 db épület lesz érintett Az érintett ingatlan: - Tiszaújvárosi Szent István Katolikus Általános Iskola (3580 Tiszaújváros, Rózsa út 12. Hrsz: 949) Az épület Tiszaújváros Város Önkormányzatának tulajdonában van, de az Egri Főegyházmegye korábban vagyonkezelésbe vette az intézmény fenntartására. A projekt célja, hogy az épületegyüttes energetikai mutatói megfeleljenek a mai kor és jogszabályok előírásainak. Ezzel csökkentve az épület káros anyag kibocsátását, csökkentve az üzemeltetési és fenntartási költségeket, és csökken a fosszilis anyagok felhasználása is. Az épület korszerűsítésével az intézmény hétköznapjait is szebbé tehetjük, és hozzájárulunk az oktatás és nevelés infrastrukturális környezetének javulásához. Tervezett fejlesztések - utólagos külső hőszigetelés - födém hőszigetelése - lapostető hőszigetelése - külső nyílászárók cseréje, korszerűsítése - fűtési rendszerek korszerűsítése (szekunder rendszer felújítása) - napelemes rendszer (31 kW) A projekt előkészítése során az épület esetében rendelkezésre állnak a jelenlegi és tervezett állapotok energetikai tanúsítványai és TNM számításai, valamint kiviteli tervei. Tervezetten 2017. elején lebonyolításra kerülnek a közbeszerzési eljárások, így az épület fejlesztése a nyáron elindulhat és az év végéig befejeződhet. Célcsoport: A fejlesztés közvetlen célcsoportja az intézményeket használó gyerekek és pedagógusok. De közvetlenül a szülők, a települések lakossága és a fenntartó is érintett lesz a fejlesztéssel. Számszerűsíthető eredmények: További kapacitás megújuló energia előállítására (MW): 0,031 A középületek éves elsődleges energia fogyasztásának csökkenése (kWh/év): 600 910 Az üvegházhatást okozó gázok éves csökkenése (tonna CO2 egyenérték): 123,27 Energiahatékonysági fejlesztések által elért primer energia felhasználás csökkenés (GJ/év): 1810 A megújuló energiaforrásból előállított energiamennyiség (GJ/év): 353 (Hungarian)
    0 references
    In the framework of the KEOP — 7.13.0/15 construction, the main church of Eger assessed the energy state of its most degraded buildings. In the framework of the project, the construction plan of the 10 buildings most in need of energy development was also prepared. In the course of this tender, 1 of the 10 buildings will be affected. — St. Stephen Catholic Primary School of Tiszaújváros (3580 Tiszaújváros, Rózsa út 12. Geographical area: 949) The building is owned by the Municipality of Tiszaújváros, but it was previously managed by the Egri County for the maintenance of the institution. The aim of the project is to ensure that the energy indicators of the building complex meet the requirements of today’s age and legislation. This reduces the emissions of the building, reduces operating and maintenance costs and reduces the use of fossil materials. By modernising the building, we can also improve the everyday life of the institution and contribute to the improvement of the infrastructural environment for education and education. Planned developments — retrospective external thermal insulation — slab thermal insulation — flat roof thermal insulation — replacement and modernisation of external doors and windows — modernisation of heating systems (renovation of secondary system) — solar panel system (31 kW) During the preparation of the project, energy certificates and TNM calculations of the current and planned conditions are available in the case of the building. Public procurement procedures are planned to be carried out at the beginning of 2017, so the development of the building can start in the summer and be completed by the end of the year. Target group: The direct target group of the development is children and educators using institutions. But directly the parents, the population of the settlements and the maintainer will be affected by the development. Quantifiable results: Additional capacity for renewable energy generation (MW): Reduction in annual primary energy consumption in public buildings (kWh/year): 600 910 Annual reduction of greenhouse gases (tonnes of CO2 equivalent): 123,27 Reduction of primary energy consumption achieved by energy efficiency improvements (GJ/year): 1810 Amount of energy from renewable sources (GJ/year): 353 (English)
    9 February 2022
    0 references
    Dans le cadre de la construction KEOP — 7.13.0/15, l’église principale d’Eger a évalué l’état énergétique de ses bâtiments les plus dégradés. Dans le cadre du projet, le plan de construction des 10 bâtiments qui ont le plus besoin de développement énergétique a également été élaboré. Dans le cadre du présent appel d’offres, 1 des 10 bâtiments sera affecté. — École primaire catholique St. Stephen de Tiszaújváros (3580 Tiszaújváros, Rózsa út 12. Zone géographique: 949) Le bâtiment appartient à la municipalité de Tiszaújváros, mais il était auparavant géré par le comté d’Egri pour l’entretien de l’institution. L’objectif du projet est de veiller à ce que les indicateurs énergétiques du complexe immobilier répondent aux exigences de l’âge et de la législation d’aujourd’hui. Cela réduit les émissions du bâtiment, réduit les coûts d’exploitation et d’entretien et réduit l’utilisation de matériaux fossiles. En modernisant le bâtiment, nous pouvons également améliorer la vie quotidienne de l’institution et contribuer à l’amélioration de l’environnement infrastructurel de l’éducation et de l’éducation. Développements prévus — isolation thermique externe rétrospective — isolation thermique dalle — isolation thermique à toit plat — remplacement et modernisation des portes extérieures et des fenêtres — modernisation des systèmes de chauffage (rénovation du système secondaire) — système de panneaux solaires (31 kW) Au cours de la préparation du projet, des certificats énergétiques et des calculs TNM des conditions actuelles et prévues sont disponibles dans le cas du bâtiment. Les procédures de passation de marchés publics devraient être menées au début de 2017, de sorte que le développement du bâtiment puisse commencer en été et être achevé d’ici la fin de l’année. Groupe cible: Le groupe cible direct du développement est les enfants et les éducateurs qui utilisent des institutions. Mais directement les parents, la population des colonies et le gardien seront affectés par le développement. Résultats quantifiables: Capacité supplémentaire de production d’énergie renouvelable (MW): Réduction de la consommation annuelle d’énergie primaire dans les bâtiments publics (kWh/an): 600 910 Réduction annuelle des gaz à effet de serre (tonnes d’équivalent CO2): 123,27 Réduction de la consommation d’énergie primaire grâce à l’amélioration de l’efficacité énergétique (GJ/an): 1810 Quantité d’énergie produite à partir de sources renouvelables (GJ/an): 353 (French)
    10 February 2022
    0 references
    Tiszaújváros, Borsod-Abaúj-Zemplén
    0 references

    Identifiers

    KEHOP-5.2.3-16-2016-00049
    0 references