M35 motorway No. 4 — Main road 481, main road 481 — Berettyóújfalu section and implementation of main road 481 (Q3942932)
Jump to navigation
Jump to search
Project Q3942932 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | M35 motorway No. 4 — Main road 481, main road 481 — Berettyóújfalu section and implementation of main road 481 |
Project Q3942932 in Hungary |
Statements
70,316,437,339.0 forint
0 references
91,662,066,542.0 forint
0 references
76.71 percent
0 references
30 May 2016
0 references
29 December 2020
0 references
NIF Nemzeti Infrastruktúra Fejlesztő zártkörűen működő Részvénytársaság
0 references
Az M35 autópálya 4. sz. főút – Berettyóújfalu közötti szakasza az M4 autópálya Berettyóújfalu - Nagykereki (Oh.) közötti szakasszal egyetemben a Transzeurópai Közlekedési Hálózat (Trans-European Network-Transport, TEN-T) részeként a Balti-tengert a Fekete-tengerrel összekötő (un. Lancuti vonal) távlati gyorsforgalmi vonalon belül - többek között - a Kassa- Debrecen-Nagyvárad gyorsforgalmi kapcsolatot is biztosítani fogja. Ugyancsak a hivatkozott két autópálya szakasz által kap kapcsolatot az Észak-Erdélyi autópálya a magyarországi gyorsforgalmi úthálózattal. M35 autópálya I. ütem: a 43+620 – 49+050 km szelvények (4. sz. főút – 481. sz. főút) között, 5,43 km hosszban valósul meg. Érintett települések: Debrecen, Ebes. Keresztmetszeti kialakítás: 2x2 forgalmi sávos autópálya leállósávval és középső elválasztó sávval, 26,60 m koronaszélességgel. M35 autópálya II. ütem: a 49+050 – 67+790 km szelvények (481. sz. főút - Berettyóújfalu) között, 18,74 km hosszban valósul meg. Keresztmetszeti kialakítás: 2x2 forgalmi sávos autópálya leállósávval és középső elválasztó sávval, 26,60 m koronaszélességgel. Az M35 autópálya és a 4816. j. ök. út keresztezésénél külön szintű közúti csomópont épül. 1 db egyszerű (Mikepércs) és 1 db komplex (Derecske) pihenőhely építése. M4 autópálya: az 1+025 – 2+550 km szelvények között, 1,525 km hosszban valósul meg. Keresztmetszeti kialakítás: 2x2 forgalmi sávos autópálya leállósávval és középső elválasztó sávval, 26,60 m koronaszélességgel. Az M35 autópálya és az M4 autópálya között 800 m hosszú indirekt ág épül. 481. sz. főút: az M35 autópálya és a 47. sz. főút között, hossza: 5,5 km, keresztmetszeti kialakítás: 2x1 forgalmi sávos főút. Koronaszélesség 12,00 m, forgalmi sávok szélessége 3,50 m, padkaszélesség 2,50 m. 4803. j. Földes-Derecske ök. út: szilárd burkolattal történő kiépítés a 6+650 – 9+238 km szelvények között, mely 2,588 km hosszban valósul meg. Keresztmetszeti kialakítás: 2x1 forgalmi sávos összekötő út, 9,50 m koronaszélességgel. A szakasz a következő külön szintű közúti forgalmi csomópontokat tartalmazza: - M35 autópálya-4. sz. főút forgalmi csomópont (Debrecen), - M35 autópálya-481. sz. főút forgalmi csomópont (Debrecen), - M35 autópálya-4816. j. ök. út forgalmi csomópont (Derecske). A szakasz magában foglalja valamennyi érintett közmű kiváltását és védelembe helyezését, a keresztezéssel érintett országos és helyi közutak nyomvonal korrekcióját, az ingatlanok megközelítését biztosító párhuzamos szerviz úthálózat építését, egy egyszerű és egy komplex pihenőhely megépítését. A beruházás keretében megépül a 481. sz. főút, mely az M35 autópálya és a 47. sz. főút közötti közúti kapcsolatot fogja megteremteni Debrecen közigazgatási területén. Megépül az M4 autópálya az 1+025 – 2+550 km szelvények közötti szakaszon, valamint elkészül a 4803. j. Földes-Derecske ök. út szilárd burkolattal történő kiépítése a 6+650 – 9+238 km szelvények között. A szakaszon tervezetten 19 db hídműtárgy épül. A szakasz előkészítése során elvégzendő feladatok: - területbiztosítás, lőszermentesítés, megelőző régészeti feltárás. A szakasz kivitelezése során elvégzendő feladatok: - M35 autópálya 4. sz. főút – Berettyóújfalu közötti szakasz építése, műszaki ellenőrzése, - forgalomba helyezési eljárások lefolytatása, - pótkisajátítási eljárások lefolytatása, telekalakítási engedélyek beszerzése, ingatlan-nyilvántartásban való átvezetés elvégzése. (Hungarian)
0 references
The section of the M35 motorway No. 4 — Berettyóújfalu, along with the section of the M4 motorway between Berettyóújfalu — Nagyköri (Oh.) connecting the Baltic Sea to the Black Sea as part of the Trans-European Network-Transport (TEN-T) network. Lancuti line) within the long-term expressway line — among others — the Košice — Debrecen-Oradea expressway connection will also be provided. The North Transylvania motorway is also connected to the express road network in Hungary by means of the two motorway sections referred to. M35 Motorway Phase I: between the sections 43+ 620-49+ 050 (main road 4 — main road 481), 5.43 km long. Municipalities concerned: Debrecen, Ebes. Cross-sectional design: 2x2 lane highway with stop lane and middle separator lane with a crown width of 26.60 m. M35 Motorway Phase II: between the sections 49+ 050-67+ 790 km (481 — Berettyóújfalu), 18.74 km length. Cross-sectional design: 2x2 lane highway with stop lane and middle separator lane with a crown width of 26.60 m. A separate level road junction is built at the junction of the M35 motorway and the road 4816 j. Construction of 1 simple (Mikepércs) and 1 complex (Derecske) rest area. M4 motorway: between 1+ 025-2+ 550 km sections, 1.525 km long. Cross-sectional design: 2x2 lane highway with stop lane and middle separator lane with a crown width of 26.60 m. An indirect branch of 800 m long between the M35 motorway and the M4 motorway is built. Main road 481: between the M35 motorway and main road No 47, length: 5.5 km, cross-sectional design: Highway 2x1 lane. Crown width 12.00 m, width of traffic lanes 3.50 m, bench width 2.50 m. 4 803 m. j. Ground-Derecske e. road: construction with solid pavement between the 6+ 650-9+ 238 km sections, which takes place in 2.588 km length. Cross-sectional design: 2x1 lane connecting road with a crown width of 9.50 m. This section includes the following separate levels of road nodes: — Highway M35 — Main Road 4 (Debrecen), — Highway M35 — Main Road No 481 (Debrecen), — M35 motorway — Road 4816 j. road junction (Derecske). The section includes the replacement and protection of all relevant public utilities, the correction of the national and local roads affected by the crossing, the construction of a parallel service road network ensuring access to real estate, the construction of a simple and complex resting place. As part of the investment, the main road No 481 will be built, which will establish a road link between the M35 motorway and the main road no. 47 in the administrative area of Debrecen. The M4 motorway will be built on the section between the 1+ 025-2+ 550 km sections, and the construction of the 4803.j. Földes-Derecske ec. road with solid pavement between the 6+ 650-9+ 238 km sections will be completed. 19 bridge artworks will be built on the section. Tasks to be carried out during the preparation of the phase: — area insurance, demunition, preventive archaeological excavation. Tasks to be carried out during the execution of the section: — M35 motorway No. 4 — Construction and technical inspection of the section between Berettyóújfalu (Berettyóújfalu), — carrying out entry into service procedures, — carrying out supplementary expropriation procedures, obtaining land conversion permits and carrying out a transfer to the land register. (English)
9 February 2022
0 references
Le tronçon de l’autoroute M35 no 4 — Berettyóújfalu, ainsi que le tronçon de l’autoroute M4 reliant Berettyóújfalu — Nagyköri (Oh.) reliant la mer Baltique à la mer Noire dans le cadre du réseau transeuropéen de transport (RTE-T). Ligne Lancuti) à l’intérieur de la ligne à long terme de l’autoroute — entre autres — la liaison de l’autoroute Košice — Debrecen-Oradea. L’autoroute Nord de la Transylvanie est également reliée au réseau routier express en Hongrie au moyen des deux tronçons autoroutiers mentionnés. M35 Phase I de l’autoroute: entre les sections 43+ 620-49+ 050 (route principale 4 — route principale 481), 5,43 km de long. Communes concernées: Debrecen, Ebes. Conception de la coupe transversale: 2x2 voie autoroute avec voie d’arrêt et voie de séparation centrale avec une largeur de couronne de 26,60 m. M35 Phase II de l’autoroute: entre les sections 49+ 050-67+ 790 km (481 — Berettyóújfalu), 18,74 km de longueur. Conception de la coupe transversale: 2x2 voie autoroute avec voie d’arrêt et voie de séparation centrale avec une largeur de couronne de 26,60 m. Un carrefour routier à niveau séparé est construit à l’intersection de l’autoroute M35 et de la route 4816. Construction d’une aire de repos simple (Mikepércs) et d’un complexe (Derecske). Autoroute M4: entre 1+ 025-2+ 550 km de sections, 1,525 km de long. Conception de la coupe transversale: 2x2 voie autoroute avec voie d’arrêt et voie de séparation centrale avec une largeur de couronne de 26,60 m. Une branche indirecte de 800 m de long entre l’autoroute M35 et l’autoroute M4 est construite. Route principale 481: entre l’autoroute M35 et la route principale no 47, longueur: 5,5 km, en coupe transversale: Voie de l’autoroute 2x1. Largeur de la couronne 12,00 m, largeur des voies de circulation 3,50 m, largeur du banc 2,50 m. 4 803 m. j. Terrain-Derecske e. route: construction avec chaussée solide entre les sections 6+ 650-9+ 238 km, qui a lieu sur 2,588 km de longueur. Conception de la coupe transversale: 2x1 voie reliant la route avec une largeur de couronne de 9,50 m. Cette section comprend les niveaux distincts suivants des nœuds routiers: — Autoroute M35 — route principale 4 (Debrecen), — route M35 — route principale no 481 (Debrecen), — autoroute M35 — route 4816 carrefour routier (Derecske). La section comprend le remplacement et la protection de tous les services publics concernés, la correction des routes nationales et locales touchées par le passage à niveau, la construction d’un réseau routier de service parallèle assurant l’accès à l’immobilier, la construction d’un lieu de repos simple et complexe. Dans le cadre de l’investissement, la route principale no 481 sera construite, qui établira une liaison routière entre l’autoroute M35 et la route principale no 47 dans la zone administrative de Debrecen. L’autoroute M4 sera construite sur le tronçon entre les tronçons 1+ 025-2+ 550 km, et la construction de la route 4803.j. Földes-Derecske ec. avec chaussée solide entre les 6+ 650-9+ 238 km sera achevée. 19 œuvres d’art du pont seront construites sur la section. Tâches à effectuer lors de la préparation de la phase: — assurance de surface, démunition, fouilles archéologiques préventives. Tâches à effectuer lors de l’exécution de la section: — Autoroute M35 no 4 — Construction et contrôle technique du tronçon entre Berettyóújfalu (Berettyóújfalu), — exécution des procédures d’entrée en service, — exécution de procédures complémentaires d’expropriation, obtention de permis de conversion des terres et transfert au cadastre. (French)
10 February 2022
0 references
Identifiers
IKOP-1.1.0-15-2016-00010
0 references