Purchase and installation of solar system on “FORZA PLUS” Bt. Mohacs, Dózsa Gy. At its registered office at U. 28. (Q3935308)
Jump to navigation
Jump to search
Project Q3935308 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Purchase and installation of solar system on “FORZA PLUS” Bt. Mohacs, Dózsa Gy. At its registered office at U. 28. |
Project Q3935308 in Hungary |
Statements
9,266,027.0 forint
0 references
16,847,322.0 forint
0 references
55.0 percent
0 references
1 December 2020
0 references
30 September 2022
0 references
"FORZA PLUS" Kereskedelmi és Szolgáltató Betéti Társaság
0 references
A projekt megvalósításával a pályázó vállalkozás azt kívánja elérni, hogy a megvalósítási helyszín villamos energia szükséglete részben megújuló energiából kerüljön biztosításra a minél gazdaságosabb és költséghatékonyabb működés elérése érdekében. Ezzel összhangban a projekt keretében megvalósuló tevékenységek a „Napelemes rendszer telepítése hálózati villamosenergia-termelés céljából” célterülethez kapcsolódnak. A telepítendő napelemes rendszer névleges teljesítménye meghaladja a 15 kWp-t, ezáltal a Felhívás alapján az önállóan támogatható tevékenységek közé tartozik (3.1.1. A) III.). A projekt előkészítésének első lépéseként a rendelkezésre álló információk összegzésével meghatározásra került a megvalósítási helyszín éves villamos-energia fogyasztása. Ezt követően megvizsgálásra került, hogy a gazdasági tevékenységnek helyet biztosító épület tetőszerkezete alkalmas-e napelemes rendszer fogadására és megtörtént az épület felmérése. A beruházás bekerülési értékének pontos meghatározása érdekében a pénzügyi és műszaki szempontok együttes mérlegelése alapján kiválasztásra került a rendszert leszállító és telepítő vállalkozás. Ezt követően a támogatási kérelem benyújtása előtt végrehajtott előkészítési tevékenység utolsó lépéseként elkészült a rendszer műszaki leírása, valamint a napelem panelek elrendezési terve. Ezen dokumentumok a támogatási kérelem mellékleteként benyújtásra kerülnek. A tervezett beruházás nem építési engedély köteles tevékenység. A napelemes rendszer csatlakozási dokumentációját az áramszolgáltatónál engedélyeztetni kell, melyre a támogatói döntést követően kerül sor. A projekt fizikai megvalósítását 2020. őszén tervezzük megkezdeni, mely során leszállításra és telepítésre kerülnek a rendszer egyes elemei. A kiépített rendszer csatlakoztatásra kerül az épület elektromos rendszeréhez, valamint a hálózathoz. Megtörténik a mérő- és szabályozó rendszerek beszerzése és felszerelése. A fizikai megvalósítás zárásaként módosításra kerül a hálózathasználati szerződés. A villamos energia fogyasztás mértéke a megvalósítási helyszínen 140.674 kWh/év. A projekt keretében telepítendő 58,59 kWp névleges teljesítményű napelemes rendszer ezen fogyasztás jelentős hányadát képes kiváltani, hozzájárulva a működési költségek csökkentéséhez és a fenntartható fejlődés biztosításához. A tervezett rendszer műszaki paraméterei az alábbiak: - napelem cellák: 189 db Seraphim 310Wp mono, termékgarancia 15 év, teljesítménygarancia 25 év – 83,1%, származási hely: Kína. - inverter: SAJ Suntrio Plus 50K SAJ Wifi modullal, 10 év gyártói termékgarancia, ami +5 év jótállással kiegészíthető, származási hely: Kína. - tartószerkezet: alu és rozsdamentes tartószerkezet ferde tetőre, - DC doboz: gyártó Hensel, származási hely: Magyarország A rendszer teljes mértékben alkalmas villamos energia termelésére, a rendszer TIER1 minősítésű panelekből, a piacon szokványos termék és teljesítmény garanciával rendelkező inverterből áll. A vállalkozás vezetése az eltelt évek során jelentős projektmegvalósítási tapasztalatra tett szert. Az eddigi működés során végrehajtott fejlesztések nagyságrendje jelentősen meghaladja a tárgyi projekt összköltségét, így a fejlesztés megvalósítása a vállalkozás vezetése számára nem jelenthet problémát. (Hungarian)
0 references
By implementing the project, the applicant company aims to ensure that the electricity needs of the implementation site are partly covered by renewable energy in order to achieve the most economical and cost-effective operation possible. In line with this, the activities under the project are linked to the target area “Establishment of a solar system for the generation of electricity in the grid”. The rated power of the solar system to be installed exceeds 15 kWp, making it one of the activities that can be independently supported on the basis of the Call (3.1.1.) (A) III). As a first step in the preparation of the project, the annual electricity consumption of the implementation site was determined by summarising the available information. It was then examined whether the roofing structure of the building where the economic activity took place was suitable for the reception of a solar system and the building was assessed. In order to accurately determine the cost of the investment, the undertaking which delivered and installed the system was selected on the basis of a combination of financial and technical criteria. The technical description of the system and the layout plan of the solar panels were then completed as the final step of the preparatory action carried out before the submission of the aid application. These documents will be submitted as an annex to the aid application. The planned works are not subject to a building permit activity. The connection documentation of the solar system shall be authorised by the power supplier, which shall be carried out after the sponsor’s decision. We plan to start the physical implementation of the project in the autumn of 2020, during which certain elements of the system will be delivered and installed. The installed system is connected to the electrical system of the building as well as to the grid. The acquisition and installation of measuring and control systems takes place. The network usage contract will be amended to close the physical implementation. The electricity consumption at the installation site is 140.674 kWh/year. The solar system to be installed under the project with a rated power of 58,59 kWp can replace a significant proportion of this consumption, contributing to reducing operating costs and ensuring sustainable development. The technical parameters of the planned system are as follows: — solar cells: 189 pcs Seraphim 310Wp mono, product warranty 15 years, performance warranty 25 years — 83.1 %, place of origin: China. — inverter: Saj Suntrio Plus 50K SAJ Wifi module, 10 years product warranty, which can be supplemented with + 5 years warranty, place of origin: China. — support structure: Alu and stainless steel support structure for inclined roof, — DC box: manufacturer Hensel, place of origin: Hungary The system is fully suitable for the production of electricity, the system consists of TIER1 certified panels, an inverter with standard product and performance guarantees on the market. The management of the company has gained significant project implementation experience over the past few years. The scale of the developments carried out in the course of operation significantly exceeds the total cost of the project in question, so the implementation of the development should not be a problem for the management of the company. (English)
8 February 2022
0 references
En mettant en œuvre le projet, la société requérante vise à garantir que les besoins en électricité du site de mise en œuvre sont partiellement couverts par les énergies renouvelables afin d’assurer l’exploitation la plus économique et la plus rentable possible. Dans le même ordre d’idées, les activités du projet sont liées à la zone cible «Établissement d’un système solaire pour la production d’électricité dans le réseau». La puissance nominale du système solaire à installer dépasse 15 kWp, ce qui en fait l’une des activités pouvant être prises en charge de manière indépendante sur la base de l’appel (3.1.1). (A) III). Comme première étape de la préparation du projet, la consommation annuelle d’électricité du site de mise en œuvre a été déterminée en résumant les informations disponibles. Il a ensuite été examiné si la structure de toiture du bâtiment où s’est déroulée l’activité économique était adaptée à la réception d’un système solaire et le bâtiment a été évalué. Afin de déterminer avec précision le coût de l’investissement, l’entreprise qui a livré et installé le système a été sélectionnée sur la base d’une combinaison de critères financiers et techniques. La description technique du système et le plan d’aménagement des panneaux solaires ont ensuite été achevés en tant qu’étape finale de l’action préparatoire menée avant la présentation de la demande d’aide. Ces documents seront présentés en annexe à la demande d’aide. Les travaux prévus ne font pas l’objet d’une activité de permis de construire. La documentation de raccordement du système solaire est autorisée par le fournisseur d’électricité, qui est effectuée après la décision du promoteur. Nous prévoyons de commencer la mise en œuvre physique du projet à l’automne 2020, au cours de laquelle certains éléments du système seront livrés et installés. Le système installé est raccordé au système électrique du bâtiment ainsi qu’au réseau. L’acquisition et l’installation de systèmes de mesure et de contrôle ont lieu. Le contrat d’utilisation du réseau sera modifié pour clore la mise en œuvre physique. La consommation d’électricité sur le site de l’installation est de 140,674 kWh/an. Le système solaire à installer dans le cadre du projet d’une puissance nominale de 58,59 kWp peut remplacer une part importante de cette consommation, contribuant ainsi à réduire les coûts d’exploitation et à assurer un développement durable. Les paramètres techniques du système prévu sont les suivants: — cellules solaires: 189 pcs Seraphim 310Wp mono, garantie du produit 15 ans, garantie de performance 25 ans — 83,1 %, lieu d’origine: La Chine. — onduleur: Module SAJ SunTrio Plus 50K SAJ Wifi, 10 ans de garantie produit, qui peut être complété par + 5 ans de garantie, lieu d’origine: La Chine. — structure d’appui: Alu et structure de support en acier inoxydable pour toit incliné, — boîte DC: fabricant Hensel, lieu d’origine: Hongrie Le système est parfaitement adapté à la production d’électricité, le système se compose de panneaux certifiés TIER1, un onduleur avec des produits standard et des garanties de performance sur le marché. L’ampleur des développements réalisés au cours de l’exploitation dépasse considérablement le coût total du projet en question, de sorte que la mise en œuvre du développement ne devrait pas être un problème pour la direction de l’entreprise. (French)
10 February 2022
0 references
Mohács, Baranya
0 references
Identifiers
GINOP-4.1.4-19-2020-02368
0 references