Investment aimed at increasing energy efficiency at PLATT 2003 Kft.'s site in uppertárkányi (2408.hrsz) (Q3934617)
Jump to navigation
Jump to search
Project Q3934617 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Investment aimed at increasing energy efficiency at PLATT 2003 Kft.'s site in uppertárkányi (2408.hrsz) |
Project Q3934617 in Hungary |
Statements
23,420,802.0 forint
0 references
42,583,278.0 forint
0 references
55.0 percent
0 references
1 April 2020
0 references
31 March 2022
0 references
PLATT 2003. Fémszerkezet Gyártó,Szerelő és Szolgáltató Korlátolt Felelősségű Társaság
0 references
A beadott pályázat eredményes elfogadása esetében Platt 2003 Kft. fejleszteni tervezi épületének energiahatékonyságát, csökkentve annak energiafogyasztását, csökkentve a fosszilis energiahordozók alkalmazásával előálló légköri emissziót és egyéb környezeti terhelést, valamint megújuló energia alkalmazásával tovább csökkenti a különféle közműhálózatokból vásárolt energiafogyasztás mennyiségét. Az épület jelenlegi éves primer villamos energia felhasználásunk 472 620 kWh/év. A beruházásnak köszönhetően az éves fajlagos primer energia fogyasztás megtakarítás mértéke a fejlesztés előtti állapothoz képest 42,52 % lesz. A fejlesztés eredményeképp a következő további eredményeket érjük el: Az üvegházhatású gázok becsült éves csökkenése (t/év): 38,62 Energiahatékonysági fejlesztések által elért primer energia felhasználás csökkenés (GJ/év): 723,46 Üvegházhatást okozó gázok éves csökkenésének aránya a fejlesztés előtti kibocsátáshoz képest (%/év): 40,53 Összes éves fajlagos primer energia fogyasztás megtakarítás mértéke a fejlesztés előtti állapothoz képest (% /év): 42,52 Fejlesztés részletei: Fujitsu Waterstage S 10 Comfort V2 (WSYA100DG6 / WOYA100LFTA) 10 kw-os hőszivattyú telepítését (elektromos bekötését) képzett szakember végzi. A rendszer külső levegőből von el hőt és ezzel a hővel vizet melegít, ami azután telephelyünk fűtőtesteiben kering. A homlokzati és ferdetetős hőszigetelést szendvicspanellel javasolt megoldani. A homlokzatra és a ferdetetőre egyaránt 10 cm vastagságú, PUR hab töltetű szendvicspanel szerelése történik meg. Mivel az épület nem lapostetős, ezért a ferdetetőre kerülő hőszigetelő réteg esetében ugyanúgy kell eljárni, mint függőleges felület esetében, vagyis tartószerkezet beépítése szükséges. Kondenzációs gázkazán radiátoros fűtési rendszer telepítése valósul meg. Gázüzemű fűtő készülék elhelyezését, víz- és gázoldali bekötését szakember végzi. Viessmann Vitodens 200-W Gázüzemű kondenzációs falikazán, nemesacél fűtőfelülettel, névleges teljesítmény: 105 kW. A világításkorszerűsítés úgy valósul meg, hogy a meglévő korszerűtlen világítótestek és fényforrások a korszerűsítés eredményeként, a szabvány szerint előírt megvilágítási érték elérése mellett, jelentős villamos energia megtakarítást produkál. A lámpákat a meglévő világítási vezetékhálózat megtartásával, a meglévő lámpák helyére szerelik föl, lámpatest csere történik. Összesen 43 ledes világítóest kerül beépítésre. Előkészítési tevékenységek: • Építési tevékenység nem építési engedély köteles, melyről nyilatkoztunk, a kivitelező megtette nyilatkozatát a megkezdésre vonatkozóan. • A felújításhoz szükséges tervezési dokumentumok a kivitelező által elkészültek. • Az épületet energetikus felmérte és elkészítette a jelenlegi valamint tervezett állapotra vonatkozó energetikai tanúsítványokat, energetikai számításokat, illetve összefoglalta fejlesztési javaslatait. • Épületgépész megvizsgálta az épületet és megállapította, hogy a műszaki kritériumoknak a tervezett hőszivattyús rendszer megfelel. • Műszaki ellenőrrel egyeztetés, árajánlatkérés (Hungarian)
0 references
In the event of the successful acceptance of the submitted tender, Platt 2003 Kft. plans to improve the energy efficiency of its building, reducing its energy consumption, reducing the atmospheric emissions and other environmental pressures generated by the use of fossil fuels, and by using renewable energy further reduces the amount of energy consumption purchased from various utilities networks. The building’s current annual primary electricity consumption is 472 620 kWh/year. Thanks to the investment, the annual savings of primary energy consumption will be 42.52 % compared to the pre-development situation. As a result of the development, the following results will be achieved: Estimated annual reduction of greenhouse gases (t/year): 38,62 Reduction of primary energy consumption achieved by energy efficiency improvements (GJ/year): 723,46 Rate of annual reduction of greenhouse gases compared to pre-development emissions (%/year): 40,53 Total annual specific primary energy consumption savings compared to pre-development (%/year): 42.52 Detailed development: Fujitsu Waterstage S 10 Comfort V2 (WSYA100DG6/WOYA100LFTA) is equipped with a 10 kw heat pump installation (electrical connection). The system extracts heat from outside air and heats water, which then circulates in the heaters of our premises. The facade and oblique thermal insulation is recommended with a sandwich panel. A 10 cm thick sandwich panel with PUR foam load is installed on both the facade and the inclined roof. As the building is not flat-roofed, the heat insulating layer placed on the inclined roof should be applied in the same way as in the case of a vertical surface, i.e. the installation of a support structure is required. A condensation gas boiler radiator heating system is installed. The installation of a gas-fuelled heating device is carried out by a specialist. Viessmann Vitodens 200-W Gas-based condensation galvan with stainless steel heating surface, rated output: 105 kW. The modernisation of lighting is achieved in such a way that existing illumination and light sources generate significant electricity savings as a result of the modernisation, while achieving the illumination value required in accordance with the standard. The lamps are installed in place of existing lamps by maintaining the existing lighting wiring network, replacement of luminaires takes place. A total of 43 led lights will be installed. Preparatory activities: • Construction activities are not subject to a building permit, which we have declared, the contractor has made his declaration of commencement. • The design documents required for the refurbishment have been completed by the contractor. • The building was energeticly assessed and prepared energy certifications, energy calculations, and a summary of its development proposals for the current and planned state. • A building engineer examined the building and concluded that the technical criteria were met by the planned heat pump system. • Consultation with the technical inspector, request for quotation (English)
8 February 2022
0 references
En cas d’acceptation de l’offre soumise, Platt 2003 Kft. prévoit d’améliorer l’efficacité énergétique de son bâtiment, de réduire sa consommation d’énergie, de réduire les émissions atmosphériques et d’autres pressions environnementales générées par l’utilisation de combustibles fossiles, et en utilisant les énergies renouvelables, de réduire encore la consommation d’énergie achetée auprès de divers réseaux de services publics. La consommation annuelle actuelle d’électricité primaire du bâtiment est de 472 620 kWh/an. Grâce à cet investissement, les économies annuelles de consommation d’énergie primaire seront de 42,52 % par rapport à la situation pré-développement. Grâce à cette évolution, les résultats suivants seront atteints: Réduction annuelle estimée des gaz à effet de serre (t/an): 38,62 Réduction de la consommation d’énergie primaire grâce à l’amélioration de l’efficacité énergétique (GJ/an): 723,46 Taux de réduction annuelle des gaz à effet de serre par rapport aux émissions antérieures au développement (%/an): 40,53 Total des économies annuelles spécifiques de consommation d’énergie primaire par rapport à l’avant-développement (%/an): 42.52 Évolution détaillée: Fujitsu Waterstage S 10 Comfort V2 (WSYA100DG6/WOYA100LFTA) est équipé d’une installation de pompe à chaleur de 10 kW (raccordement électrique). Le système extrait la chaleur de l’air extérieur et chauffe l’eau, qui circule ensuite dans les chauffages de nos locaux. La façade et l’isolation thermique oblique sont recommandées avec un panneau sandwich. Un panneau sandwich de 10 cm d’épaisseur avec charge en mousse PUR est installé à la fois sur la façade et sur le toit incliné. Comme le bâtiment n’est pas à toit plat, la couche isolante thermique placée sur le toit incliné doit être appliquée de la même manière que dans le cas d’une surface verticale, c’est-à-dire que l’installation d’une structure de support est requise. Un système de chauffage par radiateur à gaz de condensation est installé. L’installation d’un dispositif de chauffage au gaz est effectuée par un spécialiste. Viessmann Vitodens 200-W galvan de condensation à base de gaz avec surface chauffante en acier inoxydable, puissance nominale: 105 kW. La modernisation de l’éclairage est réalisée de telle sorte que l’éclairage et les sources lumineuses existantes génèrent d’importantes économies d’électricité grâce à la modernisation, tout en atteignant la valeur d’éclairage requise conformément à la norme. Les lampes sont installées à la place des lampes existantes en maintenant le réseau de câblage d’éclairage existant, le remplacement des luminaires a lieu. Un total de 43 lumières LED seront installées. Activités préparatoires: • Les activités de construction ne sont pas soumises à un permis de construire, que nous avons déclaré, le contractant a fait sa déclaration de début. • Les documents de conception requis pour la rénovation ont été complétés par le contractant. • Le bâtiment a été évalué avec énergie et préparé des certifications énergétiques, des calculs énergétiques et un résumé de ses propositions de développement pour l’état actuel et prévu. • Un ingénieur du bâtiment a examiné le bâtiment et a conclu que les critères techniques étaient remplis par le système de pompe à chaleur prévu. • Consultation de l’inspecteur technique, demande de devis (French)
10 February 2022
0 references
Felsőtárkány, Heves
0 references
Identifiers
GINOP-4.1.4-19-2020-01370
0 references