Installation of the solar system of LPG-GAS Hungary Trade and Service Limited Liability Company (Q3934097)
Jump to navigation
Jump to search
Project Q3934097 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Installation of the solar system of LPG-GAS Hungary Trade and Service Limited Liability Company |
Project Q3934097 in Hungary |
Statements
5,335,000.0 forint
0 references
9,700,000.0 forint
0 references
55.0 percent
0 references
30 July 2020
0 references
7 October 2020
0 references
"LPG-GAS Hungary" Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság
0 references
Jelen projekt „Napelemes rendszer telepítése hálózati villamosenergia-termelés céljából” célterületre irányul, 15 és 50 kWp közötti napelem rendszer telepítésével. A támogatás igénybevételével telepítésre kerülő rendszer részei, azok műszaki és szakmai paraméterei, színvonalának bemutatása: A projektben 32,5 (12,5+20,0)kW névleges AC teljesítményű napelemes kiserőmű telepítése valósul meg, megújuló energia használatának, energiahatékonyság növelése céljából. A napelemek összteljesítménye: 31,320kWp. A telephely éves villamos energia fogyasztása: 36 747 kWh/év. A napelemes rendszer által éves szinten termelt villamos energia mennyisége: 34 452 kWh/év. Összesen 108 db, 290 Wp névleges teljesítményű polykristályos napelem panel kerül telepítésre. Termékgarancia minimum: 10 év, teljesítmény garancia: 12 évre minimum 90%, 25 évre pedig minimum 80%. Fedő üveglap: 3,2 mm edzett üveglap. Keret: eloxált alumíniumötvözet. Csatlakozó: MC4 kompatibilis. Panelek hosszúsága x szélessége x mélysége: 1640 mm x 992 mm x 35 mm. Súlyuk egyenként: 18,2 kg. A modulok tetőszerkezetre való rögzítés módja: al aluminium sínezés, lemeztetőhöz csavarozva. A napelemek egymáshoz előszerelt víz és UV álló, szabványos MC-plug PV-KST / MC-Socket PV-KST csatlakozókkal kapcsolódnak. A villamos összekötéseket megfelelő keresztmetszetű (megadott hosszban 1% feszültségesést meg nem haladó) UV-álló, egyenáramú vezetékek biztosítják, védőcsatornákban elvezetve, a fokozott UV és mechanikai védelm biztosítása érdekében. A napelemek tájolása az épület(ek)en: Nyugati, Keleti, Déli. Napelemek dőlésszöge: 5-15 fok. A betervezett inverterek névleges összteljesítménye 32,5 (12,5+20,0)kW A választott inverter a hálózati engedélyes által jóváhagyott berendezések listáján megtalálható. Áramszünet idején az inverternek a vonatkozó szabványok előírásai alapján, a beépített védelem-automatikák segítségével ki kell kapcsolnia, szigetüzemben nem táplálhat a hálózatra. Az inverter saját védelme érdekében csak a hálózati feszültség tartós visszatérésekor (5 perc után) kapcsolhat vissza, az előírt szinkronozási feltételekkel. Az inverterek rendelkeznek beépített túláram, és túlfeszültség elleni védelemmel, illetve leválasztó kapcsolóval is. Inverter oldalon DC csatlakozódoboz túláram és túlfeszültség védelemmel kerül ellátásra a rendszer. A projekt előkészítéseként a felmérésre került a piac, hisz megannyi gyártó/forgalmazó/kivitelező terméke érhető el. A márkák/típusok terén miután kellő ismeretet szerzett a pályázó, meghatározta igényeit és több potenciális forgalmazótól/kivitelezőtől is ajánlatot kért. Ezt követően elkészültek a műszaki dokumentációk, ajánlat, műszaki leírás, telepítési terv. Elkészültek a pályázat benyújtásához szükséges szakértői nyilatkozatok és energetikai mellékletek. Megtörtént a kapcsolatfelvétel több potenciális szakemberrel, akik a pályázat sikeres műszaki megvalósításához lesz szükséges, mint például a kivitelezés során alkalmazásra kerülő műszaki ellenőrrel, vagy a projekt energetikai számításai elvégző szakemberrel. A kivitelezési fázis a támogató döntést követően kezdődik el. A projekt megvalósítása hozzájárul jelen támogatási konstrukció céljaihoz, miszerint csökken a vállalkozás primer energia- , egyben növekedik megújuló energiaforrás-felhasználása. A beruházás egyszerre szolgálja a Pályázó gazdasági versenyképességének erősödését rezsikiadásainak csökkenésével, és egyben környezetterhelésének és primer energiafelhasználásának mérséklését. (Hungarian)
0 references
The present project concerns the target area ‘Establishment of a solar system for electricity generation in the grid’, with the installation of a solar panel system between 15 and 50 kWp. The parts of the system to be installed with the aid, the technical and professional parameters and the quality of the system: The project involves the installation of a small solar power plant with a rated AC capacity of 32,5+ 20,0)kW to increase the use of renewable energy and energy efficiency. Total power of solar panels: 31,320kWp. Annual electricity consumption of the site: 36 747 kWh/year. Annual electricity generated by the solar system: 34 452 kWh/year. A total of 108 polycrystalline solar panels with a rated output of 290 Wp will be installed. Product guarantee minimum: 10 years, performance guarantee: At least 90 % for 12 years and 80 % for 25 years. Glass lid: 3.2 mm tempered glass plate. Framework: anodised aluminium alloy. Connector: MC4 compatible. Panel length x width x depth: 1 640 mm x 992 mm x 35 mm. Their weight individually: 18.2 kg. Method of attachment of the modules to the roof structure: al aluminum railing, screwed to plate top. Solar panels are connected with pre-assembled water and UV standing standard MC-plug PV-KST/MC-Socket PV-KST connectors. Electrical connections are provided by UV-resistant direct current lines of appropriate cross-section (not to exceed 1 % voltage drop in specified length) by conductors in protective channels to ensure enhanced UV and mechanical protection. Orientation of solar panels on the building(s): West, East, South. Angle of inclination of solar panels: Five to 15 degrees. The total rated power of the designed inverters is 32,5 (12,5+ 20,0)kW The chosen inverter can be found in the list of equipment approved by the network licensee. In the event of a power outage, the inverter shall be switched off by means of built-in protection machines, in accordance with the requirements of the relevant standards, and shall not be supplied to the network in isolated mode. To protect the inverter, it can only be switched back on a permanent return of the mains voltage (after 5 minutes) with the required synchronisation conditions. The inverters have built-in overcurrent protection and protection against overvoltage and isolating switches. Inverter side DC junction box with overcurrent and overvoltage protection will be provided to the system. In preparation for the project, the market was surveyed, as many manufacturers/distributors/constructors are available. After having acquired sufficient knowledge of the brands/types, the applicant identified its needs and asked for offers from several potential distributors/computers. After that, the technical documentation, offer, technical description, installation plan were prepared. The expert statements and energy annexes required to submit the application have been prepared. Contacts have been made with several potential experts who will be necessary for the successful technical implementation of the application, such as the technical inspector to be employed during the construction process or the expert performing the energy calculations of the project. The construction phase starts after the supporting decision. The implementation of the project contributes to the objectives of the present aid scheme, which is to reduce the use of primary energy and increase the use of renewable energy sources. At the same time, the investment serves to strengthen the Applicant’s economic competitiveness by reducing its expenditure on public utilities and at the same time reducing its environmental and primary energy consumption. (English)
8 February 2022
0 references
Le présent projet concerne la zone cible «Établissement d’un système solaire pour la production d’électricité dans le réseau», avec l’installation d’un système de panneaux solaires compris entre 15 et 50 kWc. Les parties du système à installer avec l’aide, les paramètres techniques et professionnels et la qualité du système: Le projet prévoit l’installation d’une petite centrale solaire d’une capacité nominale de 32,5+ 20,0 kW pour accroître l’utilisation des énergies renouvelables et l’efficacité énergétique. Puissance totale des panneaux solaires: 31320kWp. Consommation annuelle d’électricité du site: 36 747 kWh/an. Électricité annuelle produite par le système solaire: 34 452 kWh/an. Au total, 108 panneaux solaires polycristallins d’une puissance nominale de 290 Wp seront installés. Garantie de produit minimum: 10 ans, garantie de bonne fin: Au moins 90 % pour 12 ans et 80 % pour 25 ans. Couvercle en verre: Plaque de verre trempé de 3,2 mm. Cadre: alliage d’aluminium anodisé. Connecteur: Compatible MC4. Longueur du panneau x largeur x profondeur: 1 640 mm x 992 mm x 35 mm. Leur poids individuellement: 18,2 kg. Méthode de fixation des modules à la structure du toit: balustrade en aluminium, vissée sur le plateau. Les panneaux solaires sont connectés avec des connecteurs PV-KST/MC-Socket PV-KST/MC-Socket. Les connexions électriques sont assurées par des lignes de courant continu résistant aux UV de section appropriée (ne devant pas dépasser 1 % de chute de tension dans la longueur spécifiée) par des conducteurs dans des canaux de protection afin d’assurer une meilleure protection UV et mécanique. Orientation des panneaux solaires sur le(s) bâtiment(s): Ouest, Est, Sud. Angle d’inclinaison des panneaux solaires: De 5 à 15 degrés. La puissance nominale totale des onduleurs conçus est de 32,5 (12,5+ 20,0)kW L’onduleur choisi se trouve dans la liste des équipements approuvés par le titulaire de licence de réseau. En cas de panne de courant, l’onduleur doit être éteint au moyen de machines de protection intégrées, conformément aux exigences des normes applicables, et ne doit pas être fourni au réseau en mode isolé. Pour protéger l’onduleur, il ne peut être remis en marche que sur un retour permanent de la tension du secteur (après 5 minutes) avec les conditions de synchronisation requises. Les onduleurs disposent d’une protection contre les surintensités et d’une protection contre les surtensions et les interrupteurs d’isolement. La boîte de jonction côté onduleur DC avec protection contre les surintensités et les surtensions sera fournie au système. En préparation du projet, le marché a été étudié, étant donné que de nombreux fabricants/distributeurs/constructeurs sont disponibles. Après avoir acquis une connaissance suffisante des marques/types, la requérante a identifié ses besoins et a demandé des offres à plusieurs distributeurs/ordinateurs potentiels. Après cela, la documentation technique, l’offre, la description technique, le plan d’installation ont été préparés. Les déclarations d’experts et les annexes relatives à l’énergie requises pour soumettre la demande ont été établies. Des contacts ont été établis avec plusieurs experts potentiels qui seront nécessaires à la réussite de la mise en œuvre technique de l’application, tels que l’inspecteur technique qui sera employé pendant le processus de construction ou l’expert effectuant les calculs énergétiques du projet. La phase de construction commence après la décision de soutien. La mise en œuvre du projet contribue à la réalisation des objectifs du régime d’aide actuel, qui est de réduire l’utilisation d’énergie primaire et d’accroître l’utilisation des sources d’énergie renouvelables. Dans le même temps, l’investissement sert à renforcer la compétitivité économique de la requérante en réduisant ses dépenses en faveur des services publics tout en réduisant sa consommation d’énergie environnementale et primaire. (French)
10 February 2022
0 references
Mohács, Baranya
0 references
Identifiers
GINOP-4.1.4-19-2020-00613
0 references