URGENT WORK TO SECURE, RESTORE AND CONSOLIDATE AS A RESULT OF INSTABILITY AND LANDSLIDES ON THE 66 FACILITY BETWEEN CAMEROTA, LICUSATI AND SR EX SS 562- URGENT CIVIL PROTECTION INTERVENTIONS — BENEFICIARY PROVINCE OF SALERNO (Q2023242)

From EU Knowledge Graph
Revision as of 15:38, 12 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: The budget was changed)
Jump to navigation Jump to search
Project Q2023242 in Italy
Language Label Description Also known as
English
URGENT WORK TO SECURE, RESTORE AND CONSOLIDATE AS A RESULT OF INSTABILITY AND LANDSLIDES ON THE 66 FACILITY BETWEEN CAMEROTA, LICUSATI AND SR EX SS 562- URGENT CIVIL PROTECTION INTERVENTIONS — BENEFICIARY PROVINCE OF SALERNO
Project Q2023242 in Italy

    Statements

    0 references
    409,560.74 Euro
    0 references
    546,081.0 Euro
    0 references
    75.0 percent
    0 references
    23 December 2013
    0 references
    30 May 2019
    0 references
    PROVINCIA DI SALERNO
    0 references
    0 references

    40°1'57.00"N, 15°22'21.97"E
    0 references
    L'INTERVENTO CONSISTE NELLA MESSA IN SICUREZZA DI DUE TRATTI DEL TRACCIATO STRADALE SP 66 E DI UN TRATTO DELLA SR EX SS 562, INTERVENENDO IN MODO PRIORITARIO SULLE STRUTTURE DI SOSTEGNO DEL PIANO CARRABILE IN CORRISPONDENZA DEL DISSESTO CHE INTERESSA LA STRADA. IL PROGETTO SI SUDDIVIDE IN 3 AREE DI INTERVENTO E PREVEDE LA REALIZZAZIONE DI UNA PARATIA DI PALI A CONTENIMENTO DEL FRONTE IN FRANA NELL'AREA DI INTERVENTI 1, UN MURO DI SOSTEGNO NELL'AREA DI INTERVENTO 2 ED UNA GABBIONATA AL DI SOTTO DEL PIANO VIABILE NELL'AREA DI INTERVENTO 3 (Italian)
    0 references
    THE INTERVENTION CONSISTS OF THE SECURING OF TWO SECTIONS OF THE ROAD SECTION SP 66 AND A SECTION OF THE SR EX SS 562, ACTING AS A PRIORITY ON THE SUPPORT STRUCTURES OF THE PLANE RACK IN LINE WITH THE ROAD FAILURE AFFECTING THE ROAD. THE PROJECT CONSISTS OF 3 INTERVENTION AREAS AND PROVIDES FOR THE ESTABLISHMENT OF A PARTITION PILE IN THE FRONT OF THE 1 INTERVENTION AREA, A SUPPORT WALL IN THE AREA OF INTERVENTION 2 AND AN GABBIOONATA UNDER THE PLANE OF INTERVENTION 3 (English)
    0 references
    L’INTERVENTION CONSISTE À SÉCURISER DEUX TRONÇONS DE LA ROUTE SP 66 ET UN TRONÇON DU SR EX SS 562, EN PRIVILÉGIANT LES STRUCTURES DE SOUTÈNEMENT DU PLAN ROUTIER EN FAUTE DE LA ROUTE. LE PROJET EST DIVISÉ EN 3 ZONES D’INTERVENTION ET PRÉVOIT LA CONSTRUCTION D’UNE CLOISON DE POTEAUX POUR CONTENIR L’AVANT EN GLISSEMENT DE TERRAIN DANS LA ZONE D’INTERVENTION 1, UN MUR DE SOUTIEN DANS LA ZONE D’INTERVENTION 2 ET UN GABBIONATA SOUS LE PLAN ROUTIER DANS LA ZONE D’INTERVENTION 3 (French)
    14 December 2021
    0 references
    DE INTERVENTIE BESTAAT ERIN TWEE GEDEELTEN VAN DE WEGROUTE SP 66 EN EEN DEEL VAN DE SR EX SS 562 VEILIG TE STELLEN, WAARBIJ VOORRANG WORDT GEGEVEN AAN DE ONDERSTEUNENDE STRUCTUREN VAN HET WEGENPLAN TEN NADELE VAN DE WEG. HET PROJECT IS VERDEELD IN DRIE INTERVENTIEGEBIEDEN EN VOORZIET IN DE BOUW VAN EEN SCHOT VAN PALEN OM HET FRONT IN AARDVERSCHUIVING TE BEPERKEN OP HET GEBIED VAN INTERVENTIE 1, EEN STEUNMUUR OP HET GEBIED VAN INTERVENTIE 2 EN EEN GABBIONATA ONDER HET WEGENPLAN OP HET GEBIED VAN INTERVENTIE 3 (Dutch)
    23 December 2021
    0 references
    DIE INTERVENTION BESTEHT IN DER SICHERUNG ZWEIER ABSCHNITTE DER STRASSE SP 66 UND EINES ABSCHNITTS DER SR EX SS 562, WOBEI DIE STÜTZSTRUKTUREN DES STRASSENPLANS BEI VERKEHRSVERSCHULDUNG VORRANGIG BEHANDELT WERDEN. DAS PROJEKT IST IN DREI INTERVENTIONSBEREICHE UNTERTEILT UND SIEHT DEN BAU EINES PFAHLS VOR, DAS DIE FRONT IM ERDRUTSCH IM INTERVENTIONSBEREICH 1, EINE STÜTZMAUER IM INTERVENTIONSBEREICH 2 UND EINE GABBIONATA UNTERHALB DES STRASSENPLANS IM INTERVENTIONSBEREICH 3 ENTHÄLT. (German)
    24 December 2021
    0 references
    LA INTERVENCIÓN CONSISTE EN ASEGURAR DOS TRAMOS DE LA CARRETERA SP 66 Y UN TRAMO DE LA SR EX SS 562, DANDO PRIORIDAD A LAS ESTRUCTURAS DE APOYO DEL PLAN DE CARRETERA A FALTA DE LA CARRETERA. EL PROYECTO SE DIVIDE EN 3 ÁREAS DE INTERVENCIÓN Y PREVÉ LA CONSTRUCCIÓN DE UN MAMPARO DE POSTES PARA CONTENER EL FRENTE EN DESLIZAMIENTO DE TIERRA EN EL ÁREA DE INTERVENCIÓN 1, UN MURO DE APOYO EN LA ZONA DE INTERVENCIÓN 2 Y UN GABBIONATA POR DEBAJO DEL PLAN DE CARRETERA EN LA ZONA DE INTERVENCIÓN 3 (Spanish)
    24 January 2022
    0 references
    CAMEROTA
    0 references

    Identifiers

    H99J14003010006
    0 references