Development of urban green infrastructure in Tata Builders Park (Q3948809)

From EU Knowledge Graph
Revision as of 17:10, 10 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: Adding French translations)
Jump to navigation Jump to search
Project Q3948809 in Hungary
Language Label Description Also known as
English
Development of urban green infrastructure in Tata Builders Park
Project Q3948809 in Hungary

    Statements

    0 references
    553,407,756 forint
    0 references
    1,530,288.66 Euro
    0.00276521 Euro
    6 December 2021
    0 references
    1,680,899.566 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    614,897,506.667 forint
    0 references
    90.0 percent
    0 references
    9 January 2017
    0 references
    29 December 2020
    0 references
    TATA VÁROS ÖNKORMÁNYZATA
    0 references
    0 references

    47°39'0.32"N, 18°19'5.27"E
    0 references
    Projekt részletes tartalma Jelen projekt keretében Tata Város Önkormányzata, a helyi településrendezési terve alapján zöldfelület besorolású városrész fejlesztését célozta meg. A projekt közvetlen célja az akcióterületen található mező és erdős területének fejlesztése, szabadtéri szórakozási és sportolási lehetőségek kialakítása. A projekt keretében megvalósuló fejlesztések eredményeként Tata Város Önkormányzata egy olyan hosszú távon is fenntartható helyszínt hoz létre, amely otthont ad számos kulturális eseménynek és sportolási lehetőségnek. Célok illeszkedése A projekt keretében fejlesztett városrész a hatályos ITS szerint részben a 3. Akcióterület (Öreg-Tó környezete) része, annak szélső eleme. A jelenlegi ITS-ben megfogalmazott akcióterületi lehatárolás nem egyezik a jelen projekt keretében fejlesztett területtel (a parkolóhelyek az akcióterületen kívül esnek), az önkormányzat ennek megfelelően az ITS módosítását kezdeményezi. Az ITS fő fejlesztési célként az egészséges életmód és testmozgás lehetőségének fejlesztését tervezi konkrét beavatkozások meghatározásával. Fejlesztés helyszíne A 3. akcióterület a belváros legritkábban lakott területe, mindez a természetvédelmi besorolással indokolható. Az akcióterület tipikusan zöldmezős jelleget ölt, az Öreg-tó Észak-keleti keleti partját öleli fel a terület. Az akcióterület Észak-nyugati területén helyezkedik el az Építők parkja, amely jelen projektben a megvalósítási helyszíne. A terület nyugati szélén üzletsorok helyezkednek el, a terület keleti felén található a Borostyán-ház, amely a helyi erdészet kezelésében van. A fejlesztéssel érintett terület az alábbi helyrajzi számokat érinti: 3167/4 4012/16 4017/11 4013 4016 4006 4008 (4012/6 a fejlesztéssel érintett területen elhelyezkedő szennyvízátemelő, amely a Magyar Állam kezelésében van, így nem a projekt része. ) A fejlesztés részletes szakmai tartalma A projekt keretében Tata Város Építők parkja kerül megújításra az alábbiak szerint: Tevékenység A: • Városi aktív rekreációs zöldfelületek kialakítása és rekonstrukciója.; A projekt keretében az Építők Parkjának megújítása történik meg, amelynek keretében szabadidős és rekreációs tevékenységeknek helyt adó infrastruktúra valósul meg. Kiépül kisgyermekek számára egy 600 m2 alapterületű játszótér, illetve egy készségfejlesztő kalandpark 900 m2-en. A sportolási lehetőségeket a fitnesz park és a komplex sportpálya jelentik összesen 2.500 m2 alapterületen. Összesen 9000 m2 alapterületen történik meg a zöldfelület minőségének javítása. Tevékenység B: Magántőke bevonásával megvalósuló gazdaságélénkítés: A célterületen elhelyezkedő önkormányzati tulajdonban lévő Borostyánház kezelője a projekt végrehajtásával párhuzamosan a helyi sajátosságoknak megfelelő termékek árusítását végző kereskedelmi és szolgáltató helyiséget fog létrehozni. Soft tevékenység: A projektben tervezett soft tevékenység a fejlesztéshez kapcsolódó önkormányzati vezérlésű szemléletformálási tevékenységet jelent. A szemléletformálás során a helyi lakosságot tervezi a pályázó tájékoztatni a klímaváltozással, energiatakarékossággal összefüggésben. A szemléletformálási program keretében sor kerül rendezvények (pl. hulladékgyűjtés), versenyek megszervezésére, ahol a résztvevők játékos módon sajátíthatják el az energiatudatos ismereteket. A szemléletformálási képzési program kialakítása és lebonyolítása külső erőforrásból kerül megvalósításra. Önállóan nem támogatható, választható tevékenységek: • A terület rendeltetésszerű használatához szükséges eszközök beszerzése (utcabútorok); A területen a szabadidős tevékenységekhez szükséges eszközök beszerzése mellett a kevésbé aktív időtöltést elősegítendő utcai bútorok beszerzése is megtörténik, ezzel biztosítható, hogy a sportoló lakosok mellett a többi lakos is meglátogatja az Építők parkját. • Épületállomány felújítása; A parkban található nyilvános illemhely felújítása is jelen projekt keretében történik meg. • Kiegészítő infrastrukturális fejlesztések; Az akcióterületen sor kerül csapadékvíz gyűjtő kiépítésére, közműkiváltásra, illetve közvilágítás korszerűsítésére. Projekten kívüli elemként a parkolóhely kialakítását és a térfigyelő rendszer kiépítését az önkormányzat saját forrásból végzi. • Akadálymentesítés; • Nyilvánosság biztosítása; • Partnerségi tervezés A fennmaradó három tevékenység a pályázati felhívás előírásainak megfelelően történik majd meg. Műszaki-szakmai eredmények A projekt legfontosabb eredménye, hogy a város központjában lévő elhanyagolt Építők Parkja zöldítésre, megújításra kerül. A projekt eredményeként kialakul egy rekreációs és sportolás lehetőséget biztosító központ Tatán. (Hungarian)
    0 references
    In the framework of this project, the Municipality of Tata, on the basis of its local town planning plan, aimed at the development of a district classified as green surface. The direct aim of the project is to develop the field and forest area of the action area, to create outdoor entertainment and sports facilities. As a result of the development of the project, the Municipality of Tata will create a long-term sustainable venue that hosts many cultural events and sports opportunities. The part of the city developed in the framework of the project, according to the current ITS, is part of the 3. Part of the action area (Old Lake environment), its extreme element. The delineation of the action area defined in the current ITS does not correspond to the area developed under the present project (the parking spaces are outside the action area), and the municipality accordingly initiates an amendment of the ITS. The main development objective of ITS is to develop the possibility of healthy lifestyles and physical activity by defining specific interventions. The 3 rd action area is the most sparsely populated area of the city centre, all this can be justified by the nature conservation classification. The action area is typically greenfield, covering the north-eastern coast of the Old Lake. The construction park is located in the north-western part of the action area, which is the implementation site of this project. On the western edge of the area there are business lines, the Ivy House is located on the east side of the area, which is managed by local forestry. The area covered by the development concerns the following topographical numbers: 3167/4 4012/16 4017/11 4013 4016 4006 4008 (4012/6 is a sewage bridge situated in the area affected by the development, which is managed by the Hungarian State and is therefore not part of the project. ) Detailed professional content of the development The building park of Tata City will be renewed as follows: Activity A: • Design and reconstruction of active urban recreational green spaces.; The project involves the renewal of the Builders’ Park, in which the infrastructure for recreational and recreational activities will be implemented. A playground of 600 m² and a skill development adventure park will be built for young children on 900 m². Sports facilities include the fitness park and the complex sports field with a total surface area of 2.500 m². A total area of 9 000 m² will be used to improve the quality of green surface. Activity B: Private capital recovery: In parallel with the implementation of the project, the manager of the municipality-owned Ivy House in the target area will create a commercial and service space for the sale of products that meet local specificities. Soft activity: The soft activity planned in the project is a municipal-controlled awareness-raising activity related to the development. During the awareness-raising, the applicant plans to inform the local population about climate change and energy saving. The awareness-raising programme includes events (e.g. waste collection), competitions where participants can learn energy-conscious knowledge in a playful way. The development and implementation of the awareness-raising training programme will be implemented from an external resource. Optional activities that are not eligible on their own: • Purchase of equipment necessary for the proper use of the site (street furniture); In addition to the purchase of equipment for leisure activities in the area, street furniture to facilitate less active pastime is also purchased, thus ensuring that apart from the athletes, other residents visit the Builders’ Park as well. • Renovation of building stock; The renovation of the public toilet in the park is also carried out in the framework of this project. • Complementary infrastructure improvements; In the action area, rainwater collectors are built, public utilities are changed and street lighting is upgraded. As an element outside the project, the local government carries out the construction of the parking space and the construction of the surveillance system from its own resources. • Accessibility; • Publicity; • Partnership planning The remaining three activities will be carried out according to the specifications of the call for proposals. Technical-professional results The most important result of the project is that the neglected Builders’ Park in the city centre will be greened and renewed. The project will result in a recreation and sporting centre in Tata. (English)
    9 February 2022
    0 references
    Dans le cadre de ce projet, la municipalité de Tata, sur la base de son plan d’urbanisme local, visait le développement d’un district classé comme surface verte. L’objectif direct du projet est de développer le champ et la zone forestière de la zone d’action, de créer des installations de divertissement et de sport en plein air. Grâce au développement du projet, la municipalité de Tata créera un lieu durable à long terme qui accueillera de nombreux événements culturels et des occasions sportives. La partie de la ville développée dans le cadre du projet, selon l’actuelle STI, fait partie du 3. Une partie de la zone d’action (environnement du vieux lac), son élément extrême. La délimitation de la zone d’action définie dans le STI actuel ne correspond pas à la zone développée dans le cadre du présent projet (les places de stationnement sont en dehors de la zone d’action), et la municipalité amorce en conséquence une modification du STI. Le principal objectif de développement des STI est de développer la possibilité de modes de vie sains et d’activité physique en définissant des interventions spécifiques. La 3ème zone d’action est la zone la plus faiblement peuplée du centre-ville, tout cela peut être justifié par la classification de la conservation de la nature. La zone d’action est typiquement vierge et couvre la côte nord-est du vieux lac. Le parc de construction est situé dans la partie nord-ouest de la zone d’action, qui est le site de mise en œuvre de ce projet. À la limite ouest de la région, il y a des lignes d’affaires, la maison Ivy est située sur le côté est de la région, qui est gérée par la foresterie locale. La zone couverte par le développement concerne les numéros topographiques suivants: 3167/4 4012/16 4017/11 4013 4016 4006 4008 (4012/6 est un pont d’égouts situé dans la zone touchée par le développement, qui est géré par l’État hongrois et ne fait donc pas partie du projet. ) Contenu professionnel détaillé de l’aménagement Le parc immobilier de Tata City sera renouvelé comme suit: Activité A: • Conception et reconstruction d’espaces verts récréatifs urbains actifs; Le projet comprend le renouvellement du parc des constructeurs, dans lequel l’infrastructure pour les activités récréatives et récréatives sera mise en œuvre. Une aire de jeux de 600 m² et un parc d’aventure de développement des compétences seront construits pour les jeunes enfants sur 900 m². Les installations sportives comprennent le parc de remise en forme et le terrain de sport complexe d’une superficie totale de 2,500 m². Une surface totale de 9 000 m² sera utilisée pour améliorer la qualité de la surface verte. Activité B: Récupération de capitaux privés: Parallèlement à la mise en œuvre du projet, le gestionnaire de la commune Ivy House dans la zone cible créera un espace commercial et de service pour la vente de produits qui répondent aux spécificités locales. Activité douce: L’activité douce prévue dans le projet est une activité de sensibilisation contrôlée par les municipalités en rapport avec le développement. Au cours de la sensibilisation, le demandeur prévoit d’informer la population locale du changement climatique et des économies d’énergie. Le programme de sensibilisation comprend des événements (par exemple, la collecte des déchets), des concours où les participants peuvent apprendre des connaissances conscientes de l’énergie de manière ludique. L’élaboration et la mise en œuvre du programme de formation de sensibilisation seront mises en œuvre à partir d’une ressource externe. Activités facultatives qui ne sont pas éligibles à elles seules: • Achat du matériel nécessaire à la bonne utilisation du site (meubles de rue); En plus de l’achat d’équipements pour des activités de loisirs dans la région, des meubles de rue pour faciliter un passe-temps moins actif sont également achetés, ce qui garantit qu’en dehors des athlètes, d’autres résidents visitent également le parc des constructeurs. • Rénovation du parc immobilier; La rénovation des toilettes publiques du parc est également réalisée dans le cadre de ce projet. • Des améliorations complémentaires des infrastructures; Dans la zone d’action, des collecteurs d’eau de pluie sont construits, les services publics sont changés et l’éclairage public est amélioré. En dehors du projet, l’administration locale réalise la construction de l’espace de stationnement et la construction du système de surveillance à partir de ses propres ressources. • L’accessibilité; • Publicité; • Planification du partenariat Les trois autres activités seront menées conformément aux spécifications de l’appel à propositions. Résultats techniques-professionnels Le résultat le plus important du projet est que le parc des constructeurs négligé dans le centre-ville sera verdoyé et renouvelé. Le projet donnera lieu à la création d’un centre sportif et récréatif à Tata. (French)
    10 February 2022
    0 references
    Tata, Komárom-Esztergom
    0 references

    Identifiers

    TOP-2.1.2-15-KO1-2016-00002
    0 references