    0 references
    83,062.91 Euro
    0.00276521 Euro
    3 December 2021
    0 references
    30,038,554 forint
    0 references
    149,298.473 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    54,615,552.727 forint
    0 references
    54.999998 percent
    0 references
    1 June 2020
    0 references
    31 May 2022
    0 references
    GET Gyártó és Szolgáltató Korlátolt Felelősségű Társaság
    0 references
    0 references

    46°44'48.30"N, 17°32'58.06"E
    0 references
    A projekt keretében a GET Gyártó és Szolgáltató Kft. fonyódi telephelyének komplett fűtési, hűtési és melegvíz rendszerének korszerűsítésére, valamint egy 49,2 kWp névleges teljesítményű napelemes rendszer telepítésére kerül sor, továbbá a telephelyen található régi üzemépület homlokzatának szigetelésére és az irodaépületben lévő raktár rész és a régi üzemépület lapos tetejeinek szigetelésére. A fűtési, hűtési és melegvíz rendszer esetében komplett épületgépészeti rendszer kerül kialakításra, internetes szabályozási és vezérlési lehetőséggel. A régi üzemépület homlokzatára elvégzett hőtechnikai számítások szerint a rétegrend hőátbocsátási tényezője nem elégíti ki a 7/2006. TNM rendelet 5. mellékletében meghatározott követelményt, így ezt a projekt keretében polisztirolhab szigetelés felhelyezésével kívánja a cég orvosolni. Az irodaépület lapos tetős raktár része szintén nem elégíti ki az előírásban foglaltakat, így itt homlokzati kőzetgyapot szigeteléssel kívánja a cég a problémát megoldani. A fűtési hőenergiát az épületegyüttesben egy régebbi 80 kW-os fatüzelésű kazán biztosítja egy puffer tároló közbeiktatásával. A kazán hatásfoka cca: 70%. Egy új, 70 kW-os faelgázosító kazán beépítésével kíván a cég itt energiahatékonysági javulást elérni, melynek 90%-os a hatásfoka (gépkönyv szerint), így további energia és CO megtakarítás érhető el. Emellett a meglévő inverteres hőszivattyú berendezés helyett, melynek teljesítménye 30/32 kW (H/F), egy levegő-víz hőszivattyús folyadékhűtő kerül beépítésre (teljesítménye: 25/28 kW (H/F), mely szintén javítja az épületegyüttes energiahatékonyságát. A faelgázosító kazán és a folyadékhűtő beépítését követően kerül kialakításra a komplett épületfelügyeleti rendszer, melynek segítségével a beállításokat és a beszabályozást, valamint a szükséges beavatkozásokat is el lehet végezni illetve ezeket nyomon lehet követni az interneten keresztül is (hibajelző beépítésével). Az épület elektromos energiájának fedezésére napelemek elhelyezését tervezte be a cég a projektben, összesen 49,2 kWp nagyságrendben. A lapos tetőkre összesen 27 kWp teljesítménnyel, melyből az irodaépület raktár részére kerülne 21,6 kWp, míg a régi üzem tetejére 5,4 kWp teljesítmény. A keleti tetőrészre 9,6 kWp, míg a Ny-i tetőre 12,6 kWp teljesítmény kerülne elhelyezésre. 300 Wp/db teljesítményű napelemmel számolva összesen 164 db van szükség. A számítások szerint a várható éves hozam: 57.056 kW. Ez több, mint az épület éves elektromos energia igénye, mely számítások szerint 39.800 kW. A telephely éves elektromos energia felhasználása cca. 94.000 kWh. A napelemek által megtermelt többlet energiát másodsorban az irodaházban működő elektromos berendezések, míg elsősorban az üzemben lévő gépek üzemeltetésére kívánja a cég fordítani. Ezzel a megoldással megújuló energia felhasználásával képessé válik a cég az épületegyüttes teljes elektromos energia igényét fedezni úgy, hogy a termeléshez szükséges áram egy részét is ebből fedezi. A beruházással a cég teljes működése válik energia- és költséghatékonyabbá, miközben rendkívül jelentős CO2 kibocsájtás-csökkenést ér el. (Hungarian)
    0 references
    The project involves the modernisation of the complete heating, cooling and hot water system of the GET Manufacturer and Service Ltd. in Fonyód, as well as the installation of a solar panel system with a rated output of 49.2 kWp, insulation of the facade of the old plant building on the site and insulation of the warehouse part of the office building and the flat tops of the old plant building. In the case of heating, cooling and hot water systems, a complete technical building system is set up with internet control and control. According to the thermal engineering calculations carried out for the facade of the old plant building, the heat transfer factor of the stratum does not satisfy the requirements of Article 7/2006. In the framework of the project, the company intends to remedy the requirement set out in Annex 5 to Decree No TNM by installing polystyrene foam insulation. The flat roofed warehouse part of the office building also does not satisfy the requirements of the regulation, so the company wants to solve the problem with insulation of facade stone wool. The heating thermal energy in the building complex is provided by an older 80 kW wood-fired boiler with a buffer storage. Boiler efficiency cca: 70 %. By installing a new 70 kW wood gasification boiler, the company intends to achieve an energy efficiency improvement, which has a 90 % efficiency (according to the machinebook), so that additional energy and CO savings can be achieved. In addition, instead of the existing inverter heat pump equipment with a power of 30/32 kW (H/F), an air-to-water heat pump liquid cooler is installed (power: 25/28 kW (H/F), which also improves the energy efficiency of the building complex. Following the installation of the wood gasifying boiler and the liquid cooler, the complete building monitoring system is set up, which allows the settings, adjustment and necessary interventions to be carried out and monitored via the Internet (by installing a fault alarm). To cover the electrical energy of the building, the company planned the installation of solar panels in the order of 49,2 kWp. For flat roofs with a total output of 27 kWp, the office building would cost 21.6 kWp and 5.4 kWp on top of the old plant. 9,6 kWp would be placed on the eastern roof and 12.6 kWp on the Ny roof. Based on 300 Wp/pcs solar battery, a total of 164 are required. The expected annual yield is calculated as follows: 57.056 kW. This is more than the annual electricity demand of the building, which is calculated at 39.800 kW. The site uses annual electrical energy cca. 94.000 kWh. Secondly, the company intends to use the additional energy generated by the solar panels for the operation of electrical equipment in the office building, and primarily for the operation of the machines in operation. With this solution, using renewable energy will enable the company to cover the entire electricity demand of the building complex by covering part of the electricity needed for production. The investment will make the full operation of the company more energy- and cost-effective, while achieving a very significant reduction in CO2 emissions. (English)
    8 February 2022
    0 references
    Le projet comprend la modernisation de l’ensemble du système de chauffage, de refroidissement et d’eau chaude du GET Manufacturer and Service Ltd. à Fonyód, ainsi que l’installation d’un système de panneaux solaires d’une puissance nominale de 49,2 kWp, l’isolation de la façade de l’ancien bâtiment de l’usine sur le site et l’isolation de la partie entrepôt du bâtiment de bureaux et des hauts plats de l’ancien bâtiment de l’usine. Dans le cas des systèmes de chauffage, de refroidissement et d’eau chaude, un système technique complet de construction est mis en place avec contrôle et contrôle Internet. Selon les calculs d’ingénierie thermique effectués pour la façade de l’ancien bâtiment de l’usine, le facteur de transfert thermique de la strate ne satisfait pas aux exigences de l’article 7/2006. Dans le cadre du projet, l’entreprise entend remédier à l’exigence énoncée à l’annexe 5 du décret no TNM en installant une isolation en mousse de polystyrène. La partie de l’entrepôt à toit plat du bâtiment de bureaux ne satisfait pas non plus aux exigences de la réglementation, de sorte que l’entreprise veut résoudre le problème avec l’isolation de la laine de pierre de façade. L’énergie thermique du complexe du bâtiment est alimentée par une chaudière à bois de plus de 80 kW dotée d’un stockage tampon. Efficacité de la chaudière cca: 70 %. En installant une nouvelle chaudière à gazéification du bois de 70 kW, l’entreprise entend réaliser une amélioration de l’efficacité énergétique, avec un rendement de 90 % (selon le manuel de machines), afin de réaliser des économies d’énergie et de CO supplémentaires. En outre, au lieu de l’équipement existant de pompe à chaleur inverseur d’une puissance de 30/32 kW (H/F), un refroidisseur de liquide par pompe à chaleur air-eau est installé (puissance: 25/28 kW (H/F), ce qui améliore également l’efficacité énergétique du complexe du bâtiment. Suite à l’installation de la chaudière à gazéification du bois et du refroidisseur à liquide, le système complet de surveillance du bâtiment est mis en place, ce qui permet d’effectuer et de contrôler les réglages, les réglages et les interventions nécessaires via Internet (par l’installation d’une alarme de défaut). Pour couvrir l’énergie électrique du bâtiment, l’entreprise a prévu l’installation de panneaux solaires de l’ordre de 49,2 kWp. Pour les toitures plates d’une puissance totale de 27 kWp, l’immeuble de bureaux coûterait 21,6 kWp et 5,4 kWp sur l’ancienne usine. 9,6 kWp seraient placés sur le toit oriental et 12,6 kWp sur le toit Ny. Basé sur 300 Wp/pcs batterie solaire, un total de 164 sont nécessaires. Le rendement annuel attendu est calculé comme suit: 57,056 kW. Il s’agit de plus que la demande annuelle d’électricité du bâtiment, qui est calculée à 39 800 kW. Le site utilise l’énergie électrique annuelle cca. 94,000 kWh. Deuxièmement, l’entreprise a l’intention d’utiliser l’énergie supplémentaire produite par les panneaux solaires pour le fonctionnement de l’équipement électrique dans le bâtiment des bureaux, et principalement pour l’exploitation des machines en fonctionnement. Grâce à cette solution, l’utilisation d’énergies renouvelables permettra à l’entreprise de couvrir l’ensemble de la demande d’électricité du complexe immobilier en couvrant une partie de l’électricité nécessaire à la production. L’investissement permettra à l’entreprise de fonctionner pleinement de manière plus efficace sur le plan énergétique et économique, tout en réalisant une réduction très significative des émissions de CO2. (French)
    10 February 2022
    0 references
    Fonyód, Somogy
    0 references

    Identifiers

    GINOP-4.1.4-19-2020-01141
    0 references