Environmentally friendly electricity supply of Egri Korona Borház restaurant and grape processing with solar system (Q3936100)
Jump to navigation
Jump to search
Project Q3936100 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Environmentally friendly electricity supply of Egri Korona Borház restaurant and grape processing with solar system |
Project Q3936100 in Hungary |
Statements
47,800,000 forint
0 references
237,576.916 Euro
0.0027336256 Euro
15 December 2021
0 references
86,909,090.909 forint
0 references
55.0 percent
0 references
2 March 2021
0 references
28 February 2022
0 references
Egri Korona Borház Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság
0 references
A vállalkozás az elmúlt évben 3,888 MW teljesítményű napelem parkot (fotovoltaikus kis erőmű) épített hitelből, amelynek a kivitelezését a Green Plan Energy Kft végezte. Ennek a beruházásnak köszönhetően a vállalkozás különböző, a szakmát jól ismerő szakemberekkel került kapcsolatba, akik segítettek összeállítani, illetve meghatározni a szükséges napelemek mennyiségét és teljesítményét. A műszaki tartalom összeállítását a Green Plan Energy Kft végezte, amely óriási tapasztalattal rendelkezik a fotovoltaikus rendszerek tekintetében. A vállalkozás napelem parkja 3395 Demjén 0207/21 hrsz alatt épült, kizárólag kereskedelmi energiatermelés céllal. Ez azt jelenti, hogy a napelemek által megtermelt elektromos áram az áramszolgáltató hálózatába termel, mely a megtermelt mennyiséget közvetlenül megvásárolja társaságunktól. Ezek alapján, a napelem park által megtermelt elektromos áram nem szolgálja ki a társaság egyetlen tevékenységéhez szükséges elektromos áram szükségletét sem, az ahhoz szükséges energiamennyiséget, a társaság az áramszolgáltatótól közvetlenül megvásárolja. A beruházás költségei részletezésre kerültek a költségek pontban. A beruházás nem építési engedély köteles, hiszen kizárólag napelemes fejlesztés történik. Csatolásra kerül az építési tercdokumentáció, amely vázlatosan tartalmazza a napelemek elhelyezkedését. (Hungarian)
0 references
Last year, the company built a 3.888 MW solar cell park (a small photovoltaic power plant) with a loan carried out by Green Plan Energy Kft. Thanks to this investment, the company came into contact with various professionals who knew the profession, who helped to assemble and determine the amount and performance of the solar panels needed. The technical content was compiled by Green Plan Energy Kft, which has a huge experience with photovoltaic systems. The company’s solar panel park was built on 3395 Demén under 0207/21 for the sole purpose of commercial energy production. This means that the electricity produced by solar panels produces into the electricity supply network, which buys the production directly from our company. On this basis, the electricity produced by the solar panel park does not serve the electricity needed for any of the company’s activities, and the amount of energy required for that activity is purchased directly by the company from the electricity supplier. The costs of the investment are detailed in the section Costs. The project is not subject to a building permit, since only solar-voltaic development takes place. The construction terc documentation is attached, which outlines the location of the solar panels. (English)
8 February 2022
0 references
L’année dernière, la société a construit un parc de cellules solaires de 3,88 MW (une petite centrale photovoltaïque) avec un prêt effectué par Green Plan Energy Kft. Grâce à cet investissement, l’entreprise est entrée en contact avec divers professionnels qui connaissaient la profession, qui ont aidé à assembler et à déterminer la quantité et la performance des panneaux solaires nécessaires. Le contenu technique a été compilé par Green Plan Energy Kft, qui a une grande expérience avec les systèmes photovoltaïques. Le parc solaire de la société a été construit sur 3395 Demén sous 0207/21 dans le seul but de produire de l’énergie commerciale. Cela signifie que l’électricité produite par les panneaux solaires produit dans le réseau de distribution d’électricité, qui achète la production directement à notre société. Sur cette base, l’électricité produite par le parc de panneaux solaires ne dessert pas l’électricité nécessaire à l’une quelconque des activités de l’entreprise et la quantité d’énergie nécessaire à cette activité est achetée directement par l’entreprise auprès du fournisseur d’électricité. Les coûts de l’investissement sont détaillés dans la section Coûts. Le projet n’est pas soumis à un permis de construire, car seul le développement solaire-voltaïque a lieu. La documentation de construction en terc est jointe, qui décrit l’emplacement des panneaux solaires. (French)
10 February 2022
0 references
Demjén, Heves
0 references
Identifiers
GINOP-4.1.4-19-2020-03396
0 references