Building energy development aimed at increasing energy efficiency at Modinvest Kft. (Q3935842)

From EU Knowledge Graph
Revision as of 10:31, 10 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: Adding French translations)
Jump to navigation Jump to search
Project Q3935842 in Hungary
Language Label Description Also known as
English
Building energy development aimed at increasing energy efficiency at Modinvest Kft.
Project Q3935842 in Hungary

    Statements

    0 references
    76,463.2 Euro
    0.00276521 Euro
    3 December 2021
    0 references
    27,651,860 forint
    0 references
    137,436.059 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    50,276,109.091 forint
    0 references
    55.0 percent
    0 references
    1 January 2021
    0 references
    31 December 2021
    0 references
    Modinvest Épitőipari-Beruházó-és Kereskedelmi Korlátolt Felelősségű Társaság
    0 references
    0 references

    46°25'40.26"N, 19°28'59.92"E
    0 references
    Építtető elhatározása szerint indul a Széchenyi 2020 keretében megjelent „Megújuló energia használatát, energiahatékonyság növelését célzó épületenergetikai fejlesztések támogatása” című (GINOP-4.1.4-19 kódszámú) pályázaton. A kezelésében lévő, tervezés tárgyát képező épület több, mint 30 éve épült, folyamatos fejlesztéseken esett át. Szerkezetileg megfelelő állapotú, de a szakipari és energetikai kondíciói a mai energetikai követelményeknek már nem felel meg.Jelen pályázat azonban csak az energetikai megtakarítást generáló beavatkozásokat támogatja, így feladat is ezekre szűkül A fejlesztés fő elemei: • régebbi homlokzati nyílászáró cseréje Az épület határoló épületszerkezetei a folyamatos felújítások és fejlesztések során a kor igényeit követve modernizálódtak, egyre jobb minőségűek és jobb hőszigetelő képességűekre lettek cserélve. A szerkezetek felújítása során a megöregedett fanyílászárók többségét modern műanyag nyílászáróra cserélték. Az épületen 11 db régi, rossz minőségű faszerkezetű nyílászárót cserélünk modern műanyag nyílászáróra. Az elhelyezni kívánt műanyag kültéri nyílászárók, hőszigetelt, fokozott légzárású ablak kerülnek elhelyezése előre kihagyott falnyílásba, PUR hab tömítéssel, (újszerelvénnyel, finombeállítással), hatkamrás profilból, egyszárnyú kivitelben, bukó-nyíló vasalattal pl.: REHAU Euro-Design 86 vagy azzal azonos műszaki tartalmú ablak és ajtó, három rétegű hőszigetelő üvegezéssel, fehér színben, UR < 1,1 W/m2K hővezetési tulajdonsággal. • fűtési rendszer, kapcsolódó gépészeti egységek cseréje, modernizációja, fejlesztése A meglévő gázkazánokat, konvektorok elbontása után új gépészeti egységek kerülnek elhelyezésre. A fűtés energia hatékonyságának növelése érdekében a fűtési energiát hőszivattyúval állítjuk elő, a tervezett új gázkazán elsősorban a használati melegvíz ellátást szolgálja és szélsőséges időjárás esetén segít a hőszivattyúknak a fűtési melegvíz előállításában, mint tartalék. • napelemes rendszer telepítése A tervezett energetikai fejlesztés másik eleme a felhasznált energia megújuló energiára történő váltása során az elektromos energia kiváltása a közművekről. Ennek lehetséges megoldása napelemek használata. A fejlesztéssel érintett épület lapostető felülete jó helyet biztosít a napelemek elhelyezésére. A tervezet napelem mennyiség a felhasznált energiának és a hőszivattyús fejlesztés többlet energia igényének megfelelően lett kiszámítva. NAPELEM MODUL napelem panelek kerülnek a lapostető két részére elhelyezésre. Összesen 36,36 kWp teljesítményű napelemet telepítünk. Az tervezett inverter, a jobb oldali épületszárnyba tervezett hőközpontba kerül elhelyezésre 2 db S inverter. A teljeskörű fejlesztés ezzel ér körbe, az épület határoló szerkezetei teljes mértékben energia takarékosak és a hatályos energetikai előírásokat teljesítik, a meglévő közművekről történő energia felhasználást pedig átváltjuk megújuló energiák felhasználására. Az elektromos energia igényt napelemmel, a földgáz igényt pedig hőszivattyúval váltjuk ki. (Hungarian)
    0 references
    The developer decided to launch the competition entitled ‘Support for building energy development to use renewable energy and increase energy efficiency’ (code number GINOP-4.1.4-19) published in the framework of Széchenyi 2020. The building under its management, which was planned, has been built for more than 30 years and has undergone continuous improvements. Structurally appropriate, but the professional and energy conditions no longer meet today’s energy requirements. However, this tender only supports interventions generating energy savings, so the task is limited to these main elements of the development: • replacement of older facade doors The building’s bordering building structures have been modernised according to the needs of the age during the continuous renovations and improvements, and have been replaced with improved thermal insulation capabilities. During the renovation of the structures, most of the aged wooden openings were replaced with modern plastic doors and windows. We replace 11 old doors and windows with low-quality wooden structure with modern plastic doors and windows. Plastic outdoor windows, insulated windows, high air-tight windows are placed in a pre-missed wall opening, PUR foam seal, (with new fitting, fine adjustment), six-chamber profile, single wing design, with roll-open iron, e.g.: REHAU Euro-Design 86 windows and doors with the same technical content, with three layers of thermal insulation glazing in white, with UR < 1.1 W/m2K thermal conductivity. • replacement, modernisation and development of heating system, related mechanical units. After dismantling existing gas boilers and convectors, new mechanical units will be installed. In order to increase the efficiency of heating energy, the heating energy is produced by a heat pump, the planned new gas boiler primarily serves domestic hot water supply and helps heat pumps produce heating hot water as a reserve in case of extreme weather. • installation of a solar system Another element of the planned energy development is the replacement of electricity from utilities during the conversion of the energy used to renewable energy. A possible solution to this is the use of solar panels. The flat roof surface of the building affected by the development provides a good place for the installation of solar panels. The planned amount of solar panels has been calculated according to the energy used and the additional energy demand of the heat pump development. Solar panel MODUL solar panels are placed in two parts of the flat roof. A total of 36,36 kWp solar panel is installed. The planned inverter will be placed in a heat centre designed for the right wing 2 S inverters. This is the complete development, the building’s containment structures are completely energy-saving and meet the existing energy requirements, and the use of energy from existing utilities is converted to renewable energy. The electricity demand is triggered by solar energy and the natural gas demand is generated by a heat pump. (English)
    8 February 2022
    0 references
    Le promoteur a décidé de lancer le concours intitulé «Soutien au développement énergétique des bâtiments en vue d’utiliser les énergies renouvelables et d’accroître l’efficacité énergétique» (numéro de code GINOP-4.1.4-19) publié dans le cadre de Széchenyi 2020. Le bâtiment sous sa gestion, planifié, a été construit depuis plus de 30 ans et a subi des améliorations continues. Structurellement appropriés, mais les conditions professionnelles et énergétiques ne répondent plus aux besoins énergétiques actuels. Toutefois, le présent appel d’offres ne soutient que des interventions générant des économies d’énergie, de sorte que la tâche est limitée à ces principaux éléments du développement: • remplacement des anciennes portes de façade Les structures voisines du bâtiment ont été modernisées en fonction des besoins de l’époque lors des rénovations et des améliorations continues, et ont été remplacées par des capacités d’isolation thermique améliorées. Lors de la rénovation des structures, la plupart des ouvertures en bois vieillies ont été remplacées par des portes et des fenêtres en plastique modernes. Nous remplaçons 11 vieilles portes et fenêtres par une structure en bois de faible qualité avec des portes et des fenêtres en plastique modernes. Les fenêtres extérieures en plastique, les fenêtres isolées, les fenêtres hautes étanches à l’air sont placées dans une ouverture murale pré-missée, joint en mousse PUR, (avec nouveau raccord, réglage fin), profil six chambres, conception à simple aile, avec fer à rouler, p.ex.: REHAU Euro-Design 86 fenêtres et portes avec le même contenu technique, avec trois couches de vitrage isolant thermique en blanc, avec UR < 1.1 W/m2K conductivité thermique. • remplacement, modernisation et développement du système de chauffage, unités mécaniques connexes. Après démontage des chaudières et convecteurs à gaz existants, de nouvelles unités mécaniques seront installées. Afin d’accroître l’efficacité de l’énergie de chauffage, l’énergie de chauffage est produite par une pompe à chaleur, la nouvelle chaudière à gaz prévue sert principalement à l’alimentation en eau chaude domestique et aide les pompes à chaleur à produire de l’eau chaude de chauffage comme réserve en cas de temps extrême. • installation d’un système solaire Un autre élément du développement énergétique prévu est le remplacement de l’électricité produite par les services publics lors de la conversion de l’énergie utilisée en énergie renouvelable. Une solution possible est l’utilisation de panneaux solaires. La surface du toit plat du bâtiment affecté par le développement fournit un bon endroit pour l’installation de panneaux solaires. La quantité prévue de panneaux solaires a été calculée en fonction de l’énergie utilisée et de la demande d’énergie supplémentaire du développement de la pompe à chaleur. Panneaux solaires MODUL Les panneaux solaires sont placés dans deux parties du toit plat. Un total de 36,36 kWp panneau solaire est installé. L’onduleur prévu sera placé dans un centre de chaleur conçu pour les onduleurs 2 S de droite. C’est le développement complet, les structures de confinement du bâtiment sont entièrement économes en énergie et répondent aux besoins énergétiques existants, et l’utilisation de l’énergie provenant des services publics existants est convertie en énergie renouvelable. La demande d’électricité est déclenchée par l’énergie solaire et la demande de gaz naturel est générée par une pompe à chaleur. (French)
    10 February 2022
    0 references
    Kiskunhalas, Bács-Kiskun
    0 references

    Identifiers

    GINOP-4.1.4-19-2020-03046
    0 references