    0 references
    1,680,000 forint
    0 references
    4,645.55 Euro
    0.00276521 Euro
    3 December 2021
    0 references
    4,592.491 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    1,680,000.0 forint
    0 references
    100.0 percent
    0 references
    13 September 2019
    0 references
    13 March 2021
    0 references
    Derecske-COOP Kereskedelmi és Szolgáltató Zártkörűen Működő Részvénytársaság
    0 references
    0 references

    47°20'10.68"N, 21°32'3.91"E
    0 references
    A projekt megvalósítása során telepítésre kerülő napelemes rendszer a pályázó telephelyén felmerülő villamosenergia igény részleges kielégítését szolgálja. A villamosenergia felhasználása az épület üzemeltetése és a benne elhelyezett technológia áramfelvételéből ered. A projekt célja, hogy a megújuló alapon történő villamosenergia előállítás által csökkenjen a tevékenység környezet terhelése, mivel az üvegházhatású gázkibocsátás mérséklődik. A telepíteni kívánt rendszer teljesítménye: 8,4 kWp A napelem cellák száma: 28 db (300 Wp/db) Az inverter típusa: Fronius Symo 8.2-3-M és Symo 8.2-3-M Light (Hungarian)
    0 references
    The solar system to be installed during the implementation of the project serves to partially satisfy the electricity demand at the applicant’s premises. The use of electricity stems from the operation of the building and the power consumption of the technology contained therein. The aim of the project is to reduce the environmental impact of the activity by generating electricity on a renewable basis, as greenhouse gas emissions are reduced. Performance of the system you want to install: 8.4 kWp Number of solar cells: 28 pcs (300 Wp/pcs) Type of inverter: Fronius SYMO 8.2-3-M and SYMO 8.2-3-M Light (English)
    8 February 2022
    0 references
    Le système solaire à installer lors de la mise en œuvre du projet sert à satisfaire partiellement la demande d’électricité dans les locaux de la requérante. L’utilisation de l’électricité découle du fonctionnement du bâtiment et de la consommation d’énergie de la technologie qu’il contient. L’objectif du projet est de réduire l’impact environnemental de l’activité en produisant de l’électricité à partir de sources renouvelables, les émissions de gaz à effet de serre étant réduites. Performances du système que vous souhaitez installer: 8,4 kWp Nombre de cellules solaires: 28 pcs (300 Wp/pcs) Type d’onduleur: Lumière Fronius SYMO 8,2-3-M et SYMO 8,2-3-M (French)
    10 February 2022
    0 references
    Derecske, Hajdú-Bihar
    0 references

    Identifiers

    GINOP-4.1.3-19-2019-00313
    0 references