129,931.19 Euro
0 references
259,862.38 Euro
0 references
50.0 percent
0 references
31 May 2019
0 references
1 April 2021
0 references
HOTEL MONTE CHERZ DI DE DORIGO GIORGIO AND C. SNC
0 references
IL PROGETTO PREVEDE UN AMPLIAMENTO DELL¿IMMOBILE A MONTE DELL¿EDIFICIO VERSO NORD PER LA REALIZZAZIONE DI UN CORPO DI FABBRICA A SE STANTE MA COLLEGATO ALL¿ESISTENTE DA ADIBIRE A CAMERE PER IL PERSONALE AL PIANO TERRA, CENTRO BENESSERE CON PISCINA AL PRIMO PIANO E SALA CONGRESSI AL SECONDO PIANO. (Italian)
0 references
THE PROJECT PROVIDES FOR AN EXTENSION OF THE PROPERTY TO BE EXTENDED UPSTREAM OF THE BUILDING TO THE NORTH FOR THE PURPOSE OF CARRYING OUT A SEPARATE WORKS OF CONSTRUCTION WORKS IN ITS OWN RIGHT BUT ATTACHED TO THE EXISTING ZONE TO BE USED BY CHAMBERS FOR STAFF ON THE GROUND FLOOR, WELLNESS WITH A SWIMMING POOL AT THE FIRST FLOOR AND CONFERENCE ROOM ON THE SECOND FLOOR. (English)
0 references
LE PROJET COMPREND UNE EXTENSION DE L’IMMEUBLE À MONTE DU BÂTIMENT VERS LE NORD POUR LA CONSTRUCTION D’UN BÂTIMENT SÉPARÉ MAIS RELIÉ À L’EXISTANT POUR SERVIR DE LOCAUX POUR LE PERSONNEL AU REZ-DE-CHAUSSÉE, CENTRE DE BIEN-ÊTRE AVEC PISCINE AU PREMIER ÉTAGE ET SALLE DE CONFÉRENCE AU DEUXIÈME ÉTAGE. (French)
16 December 2021
0 references
HET PROJECT OMVAT EEN UITBREIDING VAN HET GEBOUW IN MONTE VAN HET GEBOUW NAAR HET NOORDEN VOOR DE BOUW VAN EEN APART GEBOUW, MAAR VERBONDEN MET HET BESTAANDE TE GEBRUIKEN ALS KAMERS VOOR PERSONEEL OP DE BEGANE GROND, WELLNESSCENTRUM MET ZWEMBAD OP DE EERSTE VERDIEPING EN CONFERENTIERUIMTE OP DE TWEEDE VERDIEPING. (Dutch)
23 December 2021
0 references
DAS PROJEKT BEINHALTET EINE ERWEITERUNG DES GEBÄUDES IN MONTE IN RICHTUNG NORDEN FÜR DEN BAU EINES SEPARATEN GEBÄUDES, ABER VERBUNDEN MIT DEM BESTEHENDEN, ALS RÄUME FÜR DAS PERSONAL IM ERDGESCHOSS, WELLNESS-CENTER MIT SCHWIMMBAD IM ERSTEN STOCK UND KONFERENZRAUM IM ZWEITEN STOCK GENUTZT WERDEN. (German)
24 December 2021
0 references
EL PROYECTO IMPLICA UNA AMPLIACIÓN DEL EDIFICIO EN MONTE DEL EDIFICIO HACIA EL NORTE PARA LA CONSTRUCCIÓN DE UN EDIFICIO SEPARADO PERO CONECTADO CON EL EXISTENTE PARA SER UTILIZADO COMO SALAS PARA EL PERSONAL EN LA PLANTA BAJA, CENTRO DE BIENESTAR CON PISCINA EN EL PRIMER PISO Y SALA DE CONFERENCIAS EN EL SEGUNDO PISO. (Spanish)
25 January 2022
0 references
LIVINALLONGO DEL COL
0 references
Identifiers
B91G19000120009
0 references