Building energy development of Optimit Hungária Ltd. in Derecsken (Q3924934)
Jump to navigation
Jump to search
Project Q3924934 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Building energy development of Optimit Hungária Ltd. in Derecsken |
Project Q3924934 in Hungary |
Statements
39,836,232 forint
0 references
242,533.059 Euro
0.0027336256 Euro
15 December 2021
0 references
88,722,120.267 forint
0 references
44.900001 percent
0 references
22 August 2019
0 references
30 December 2020
0 references
OPTIMIT HUNGÁRIA Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság
0 references
A pályázó a bejegyzett telephelyén 836,8 m2 területen - mely az épület fűtött alapterülete - valósítja meg az épületenergetikai korszerűsítést. Az épület jelenlegi energetikai minőség szerinti besorolása ”FF”, a fejlesztést követően ez várhatóan eléri a ”BB” minősítést, amely közel nulla energiaigényre vonatkozó követelményeknek megfelelő besorolás. Az épület előregyártott vasbeton vázas rendszerrel épült előregyártott födémpanelekkel, kitöltő és merevítő falakkal, részben kétszintes kialakítással, belső vasbeton lépcsővel, fém nyílászárókkal épült. Az épület rendeltetésének változása, illetve a használata jelentősebb szerkezeti átalakítást nem igényelt és eredményezett. Az épület a Bocskai utca felőli részén az utcáról közvetlenül megközelíthetően egy üzlet van kialakítva. Itt kapott helyet a kiskereskedelmi ellátást szolgáló üzlet öltözővel és wc-blokkal. Az épület többi helyisége a nagykereskedelmi raktárakat, gyártást és a szükséges kiszolgáló helyiségeket (iroda, öltöző, wc-blokk) foglalja magában. Az áru beszállítása az épület mellett meglévő rakodórámpán keresztül történik. Az épület felújításának célja az épület energetikai jellemzőinek javítása és ezáltal energia megtakarítás elérése. A felújítás során az épület szerkezeti rendszere nem igényel átalakítást. Utólagos hőszigetelés: Az épület külső homlokzatán eps külső hőszigetelés készül 20 cm vastagságban (pl. Austrotherm AT H80), a lábazaton xps lapokkal (pl.: Masterplast Isomaster XPS). A homlokzati felületen el kell helyezni az előírásoknak megfelelően a tűzgátló sávokat kőzetgyapot elemek felhasználásával (pl. Rockwool Frontrock Max E). Nyílászárócsere: A meglévő nyílászárók helyére korszerű műanyag, illetve alumínium nyílászárók kerülnek beépítésre az átalakítási tervekben jelölt mérettel és kialakítással. A műanyag nyílászárók jellemzői: legalább 5 kamrás profil, háromrétegű üvegezés (Ug = 0,70 W/m2K). A magas elhelyezésű ablakoknál távnyitók kerülnek beépítésre. A földszinten lévő 270x290 méretű raktárba vezető kétszárnyú ajtó hőhídmentes alumínium szerkezettel készül. Tetőszigetelés: A lapostetőn már előkészített felületre kerül egy rétegben bitumenes lemezzel kasírozott eps hőszigetelés 20 cm vastagságban (pl.: Bachl EPS 100 Bitu), majd erre 5 mm vastagságú SBS modifikált zárólemez (pl.: Villa E-PV 5,0 S/F Extra). Fűtési rendszer korszerűsítése kondenzációs kazán beépítésével: Az épület fűtési rendszerét jelenleg két kazán biztosítja. Az átalakítás során az emeleten lévő kazán, mivel már zárt égésterű, korszerű, megmarad. A földszinti kazán kicserélésre kerül. Ide is zárt égésterű kazán kerül elhelyezésre. A fűtési rendszert az új kazán működéséhez át kell alakítani, ki kell építeni a megfelelő szabályozhatóságot a kazánhoz kapcsolódó hálózatban, illetve a radiátoroknál is szelepcserével és termosztatikus szabályzó fejek elhelyezésével. A kazán beépítéséhez bejövő gázvezetéket a homlokzatra kerülő hőszigetelés miatt a gázórától újra kell építeni, illetve a régi helyén új gázóra helyet kell kialakítani. A melegvíz-ellátás az optimális kialakítás érdekében elektromos vízmelegítőkkel lesz megoldva. Megújuló energia: A tetőfelületen a terveknek megfelelően acél tartószerkezetre 36 db napelem kerül elhelyezésre. A 9 kW teljesítményű napelemes rendszer telepítése a jelenlegi elektromos hálózati paraméterek figyelembe vételével történik. A napelemes termelő berendezés összsúlya 50 kg/m2. (Hungarian)
0 references
The applicant implements the building energy renovation on its registered site on an area of 836.8 m², which is the heated floor area of the building. The building’s current energy quality rating is ‘FF’, which is expected to reach the ‘BB’ rating after its development, which is a classification in line with nearly zero energy requirements. The building was built with prefabricated reinforced concrete frame system with prefabricated floor panels, filling and stiffening walls, partly two-storey design, internal reinforced concrete staircases, metal doors and windows. Changes in the design and use of the building did not require and resulted in major structural changes. On the side of Bocskai street there is a shop located directly from the street. This is where the retail store is located with changing rooms and toilets. The other premises of the building include wholesale warehouses, manufacturing and necessary service rooms (office, dressing room, toilet block). The goods are transported by means of an existing loading ramp next to the building. The renovation of the building aims to improve the energy performance of the building and thereby achieve energy savings. During the renovation, the structural system of the building does not require any modification. Retrofitting thermal insulation: On the outer facade of the building, eps external thermal insulation is made in 20 cm thickness (e.g. Austrotherm AT H80) with xps tiles on the plinth (e.g.: Masterplast Isomaster XPS). The surface of the facade shall be positioned in accordance with the specifications of fire-retardant strips using rock wool elements (e.g. Rockwool Frontrock Max E). Replacement of doors and windows: Modern plastic and aluminium doors are installed in place of existing doors and windows with the size and design indicated in the conversion plans. Characteristics of plastic doors and windows: minimum 5-chamber profile, three-layer glazing (Ug = 0,70 W/m2K). Remote openers are installed on high-positioned windows. The two-leaf door leading to the 270x290 warehouse on the ground floor is made of a heat bridge-free aluminium structure. Roof insulation: The surface already prepared on the flat roof is covered in a layer of eps with bituminous sheets in a thickness of 20 cm (e.g.: Bachl EPS 100 Bitu), followed by a modified SBS end plate of 5 mm thickness (e.g.: Villa E-PV 5.0 S/F Extra). Modernisation of heating system by installing a condensing boiler: The building’s heating system is currently provided by two boilers. During the refurbishment, the boiler on the floor, since it is already closed, modern, remains. The ground-floor boiler is replaced. A closed fronted boiler is also installed here. The heating system must be adapted to the operation of the new boiler, the proper control in the boiler-connected network, and the replacement of valves and the installation of thermostatic control heads in the radiators. For the installation of the boiler, the incoming gas pipeline must be rebuilt from the gas meter due to thermal insulation on the facade, or a new gas hour space must be constructed in the old place. The hot water supply will be provided with electric water heaters for optimal design. Renewable energy: 36 solar panels are installed on the roof surface according to the plans. The 9 kW solar system is installed taking into account the current electrical network parameters. The total weight of the solar generating plant shall be 50 kg/m². (English)
8 February 2022
0 references
La requérante met en œuvre la rénovation énergétique du bâtiment sur son site enregistré sur une superficie de 836,8 m², soit la surface au sol chauffée du bâtiment. La cote actuelle de qualité énergétique du bâtiment est «FF», qui devrait atteindre la cote «BB» après son développement, qui est une classification conforme aux exigences énergétiques quasi nulles. Le bâtiment a été construit avec un système de charpente préfabriquée en béton armé avec des panneaux de sol préfabriqués, des murs de remplissage et de raidissement, une conception partielle de deux étages, des escaliers internes en béton armé, des portes métalliques et des fenêtres. Les modifications apportées à la conception et à l’utilisation du bâtiment n’ont pas nécessité d’importants changements structurels. Sur le côté de la rue Bocskai il y a un magasin situé directement de la rue. C’est là que se trouve le magasin de détail avec vestiaires et toilettes. Les autres locaux du bâtiment comprennent les entrepôts de gros, la fabrication et les salles de service nécessaires (bureau, dressing, wc). Les marchandises sont transportées au moyen d’une rampe de chargement existante à côté du bâtiment. La rénovation du bâtiment vise à améliorer la performance énergétique du bâtiment et, partant, à réaliser des économies d’énergie. Lors de la rénovation, le système structurel du bâtiment ne nécessite aucune modification. Mise à niveau de l’isolation thermique: Sur la façade extérieure du bâtiment, l’isolation thermique externe eps est réalisée en 20 cm d’épaisseur (par exemple Austrotherm AT H80) avec des carreaux xps sur le socle (par exemple: Masterplast isomaster XPS). La surface de la façade doit être positionnée conformément aux spécifications des bandes ignifuges utilisant des éléments de laine de roche (par exemple Rockwool Frontrock Max E). Remplacement des portes et fenêtres: Des portes modernes en plastique et en aluminium sont installées à la place des portes et fenêtres existantes avec la taille et le design indiqués dans les plans de conversion. Caractéristiques des portes et fenêtres en plastique: profil minimum de 5 chambres, vitrage à trois couches (Ug = 0,70 W/m2K). Les ouvreurs à distance sont installés sur des fenêtres hautes positions. La porte à deux feuilles menant à l’entrepôt 270x290 au rez-de-chaussée est constituée d’une structure en aluminium sans pont thermique. Isolation du toit: La surface déjà préparée sur le toit plat est recouverte d’une couche d’éps avec des feuilles bitumineuses d’une épaisseur de 20 cm (par exemple: Bachl EPS 100 Bitu), suivie d’une plaque d’extrémité SBS modifiée d’une épaisseur de 5 mm (par exemple: Villa E-PV 5.0 S/F Extra). Modernisation du système de chauffage par l’installation d’une chaudière à condensation: Le système de chauffage du bâtiment est actuellement fourni par deux chaudières. Lors de la rénovation, la chaudière au sol, puisqu’elle est déjà fermée, moderne, reste. La chaudière au rez-de-chaussée est remplacée. Une chaudière frontale fermée est également installée ici. Le système de chauffage doit être adapté au fonctionnement de la nouvelle chaudière, au bon fonctionnement du réseau raccordé à la chaudière, au remplacement des vannes et à l’installation de têtes de commande thermostatiques dans les radiateurs. Pour l’installation de la chaudière, le gazoduc entrant doit être reconstruit à partir du compteur de gaz en raison d’une isolation thermique sur la façade, ou un nouvel espace horaire de gaz doit être construit à l’ancien endroit. L’alimentation en eau chaude sera fournie avec des chauffe-eau électriques pour une conception optimale. Énergies renouvelables: 36 panneaux solaires sont installés sur la surface du toit selon les plans. Le système solaire de 9 kW est installé en tenant compte des paramètres actuels du réseau électrique. Le poids total de l’installation solaire est de 50 kg/m². (French)
10 February 2022
0 references
Derecske, Hajdú-Bihar
0 references
Identifiers
GINOP-4.1.1-8-4-4-16-2017-00132
0 references