REPLACING LUCERNE WORKING GROUP, LIGHTING REPLACEMENT AND INSTALLATION OF PHOTOVOLTAIC INSTALLATIONS (Q2074781)

From EU Knowledge Graph
Revision as of 08:29, 10 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: import item from Italy)
Jump to navigation Jump to search
Project Q2074781 in Italy
Language Label Description Also known as
English
REPLACING LUCERNE WORKING GROUP, LIGHTING REPLACEMENT AND INSTALLATION OF PHOTOVOLTAIC INSTALLATIONS
Project Q2074781 in Italy

    Statements

    0 references
    36,772.26 Euro
    0 references
    73,544.53 Euro
    0 references
    50.0 percent
    0 references
    8 June 2018
    0 references
    11 February 2019
    0 references
    14 December 2018
    0 references
    SEMINART S.R.L.
    0 references
    0 references
    0 references

    45°38'49.31"N, 11°49'49.51"E
    0 references
    GLI INTERVENTI CHE FANNO PARTE DEL PROGETTO SONO: SOSTITUZIONE DEL GRUPPO DI LAVORO ADIBITO ALLA LAVORAZIONE DELL'ERBA MEDICA, SOSTITUZIONE DELL'ILLUMINAZIONE CON LAMPADE A LED AD ALTA EFFICIENZA ED INSTALLAZIONE DI UN IMPIANTO FOTOVOLTAICO DA 134,40 KWP POSIZIONATO IN COPERTURA DELL'UNITA' PRODUTTIVA PER AUTOCONSUMO, CONNESSO IN RETE IN REGIME DI SCAMBIO SUL POSTO. (Italian)
    0 references
    THE INTERVENTIONS THAT FORM PART OF THE PROJECT ARE: REPLACEMENT OF THE LUCERNE WORKING GROUP, REPLACEMENT OF LIGHTING WITH HIGH EFFICIENT LED LAMPS AND INSTALLATION OF A PHOTOVOLTAIC INSTALLATION OF 134,40 KWP PLACED AS COVER FOR THE PRODUCTION UNIT FOR SELF-CONSUMPTION, CONNECTED TO THE NETWORK UNDER THE ON-SITE EXCHANGE SYSTEM. (English)
    0 references
    LES INTERVENTIONS QUI FONT PARTIE DU PROJET SONT LES SUIVANTES: REMPLACEMENT DU GROUPE DE TRAVAIL POUR LE TRAITEMENT DE LA LUZERNE, REMPLACEMENT DE L’ÉCLAIRAGE PAR DES LAMPES À LED À HAUT RENDEMENT ET INSTALLATION D’UN SYSTÈME PHOTOVOLTAÏQUE DE 134,40 KWP SITUÉ SUR LE TOIT DE L’UNITÉ DE PRODUCTION POUR AUTOCONSOMMATION, RACCORDÉ AU RÉSEAU PENDANT L’ÉCHANGE SUR PLACE. (French)
    16 December 2021
    0 references
    DE INTERVENTIES DIE DEEL UITMAKEN VAN HET PROJECT ZIJN: VERVANGING VAN DE WERKGROEP VOOR DE VERWERKING VAN ALFALFA, VERVANGING VAN VERLICHTING DOOR HOOGRENDEMENT LEDLAMPEN EN INSTALLATIE VAN EEN 134,40 KWP FOTOVOLTAÏSCHE INSTALLATIE IN HET DAK VAN DE PRODUCTIE-EENHEID VOOR ZELFVERBRUIK, AANGESLOTEN OP HET NETWERK TIJDENS DE UITWISSELING TER PLAATSE. (Dutch)
    23 December 2021
    0 references
    DIE MASSNAHMEN, DIE TEIL DES PROJEKTS SIND, SIND: AUSTAUSCH DER ARBEITSGRUPPE FÜR DIE VERARBEITUNG VON ALFALFA, AUSTAUSCH VON BELEUCHTUNG DURCH HOCHEFFIZIENTE LED-LAMPEN UND INSTALLATION EINER 134,40 KWP PHOTOVOLTAIKANLAGE AUF DEM DACH DER PRODUKTIONSEINHEIT FÜR DEN EIGENVERBRAUCH, DIE WÄHREND DES AUSTAUSCHS VOR ORT MIT DEM NETZ VERBUNDEN IST. (German)
    24 December 2021
    0 references
    LAS INTERVENCIONES QUE FORMAN PARTE DEL PROYECTO SON: SUSTITUCIÓN DEL GRUPO DE TRABAJO PARA EL PROCESAMIENTO DE ALFALFA, SUSTITUCIÓN DE LA ILUMINACIÓN POR LÁMPARAS LED DE ALTA EFICIENCIA E INSTALACIÓN DE UN SISTEMA FOTOVOLTAICO DE 134,40 KWP SITUADO EN EL TECHO DE LA UNIDAD DE PRODUCCIÓN PARA AUTOCONSUMO, CONECTADO A LA RED DURANTE EL INTERCAMBIO IN SITU. (Spanish)
    25 January 2022
    0 references
    TOMBOLO
    0 references

    Identifiers

    B47B18000080009
    0 references