DIRECTOR SIMERI-MUCONE (Q2021716)

From EU Knowledge Graph
Revision as of 22:58, 9 February 2022 by DG Regio (talk | contribs) (‎Removed claims)
Jump to navigation Jump to search
Project Q2021716 in Italy
Language Label Description Also known as
English
DIRECTOR SIMERI-MUCONE
Project Q2021716 in Italy

    Statements

    0 references
    13 March 2018
    0 references
    30 November 2020
    0 references
    TERNA - RETE ELETTRICA NAZIONALE
    0 references
    0 references

    38°57'17.96"N, 16°38'28.00"E
    0 references
    IL PRESENTE PROGETTO RIGUARDA INTERVENTI DI ADEGUAMENTO DELLA LINEA DI TRASPORTO A 150 KV SIMERI-CATANZARO ATTRAVERSO LA SOSTITUZIONE DI CONDUTTORI CON CONDUTTORI INNOVATIVI AD ALTA CAPACITà (CONDUTTORI A CORDA DI LEGA DI ALLUMINIO (ZTAL) - LEGA FE-NI RIVESTITA DI ALLUMINIO (ACI) Ø 22,75 MM), INSTALLAZIONE DI COMPONENTI TECNOLOGICAMENTE AVANZATI QUALI PHASOR MEASUREMENT UNIT PRESSO LE S.E. DI CATANZARO, CALUSIA E MUCONE E L'INSTALLAZIONE DI UN TRASFORMATORE AD OLIO VEGETALE (DI NUOVA GENERAZIONE) PRESSO LA STAZIONE DI CATANZARO. (Italian)
    0 references
    THIS PROJECT RELATES TO THE ADAPTATION OF THE TRANSPORT LINE OF 150 KV SIMERI-CATANZARO THROUGH THE REPLACEMENT OF CONDUCTORS WITH AN ALUMINIUM ALLOY ROPE (ZTAL) — WITH ALUMINIUM ALLOY CORD (ACI) BEING 22.75 MM), INSTALLATION OF TECHNOLOGICALLY ADVANCED COMPONENTS SUCH AS PHASOR MEASUREMENT UNIT IN CATANZARO, CALUSIA AND MUCONE AND THE INSTALLATION OF A (NEW GENERATION) PLANT TRANSFORMER IN CATANZARO PLANT. (English)
    0 references
    CE PROJET CONCERNE L’ADAPTATION DE LA LIGNE DE TRANSPORT SIMERI-CATANZARO 150 KV PAR LE REMPLACEMENT DES CONDUCTEURS PAR DES CONDUCTEURS INNOVANTS À HAUTE CAPACITÉ (CONDUCTEURS DE CÂBLES EN ALLIAGE D’ALUMINIUM (ZTAL) — ALLIAGE FE-NI REVÊTU D’ALUMINIUM (ACI) 22,75 MM), L’INSTALLATION DE COMPOSANTS TECHNOLOGIQUEMENT AVANCÉS TELS QUE L’UNITÉ DE MESURE DU PHASOR À LA S.E. DE CATANZARO, CALUSIA ET MUCONE ET L’INSTALLATION D’UN TRANSFORMATEUR D’HUILE VÉGÉTALE (NOUVELLE GÉNÉRATION) À LA STATION DE CATANZARO. (French)
    14 December 2021
    0 references
    DIT PROJECT HEEFT BETREKKING OP DE AANPASSING VAN DE TRANSPORTLIJN SIMERI-CATANZARO 150 KV DOOR DE VERVANGING VAN GELEIDERS DOOR INNOVATIEVE HOOGVERMOGEN GELEIDERS (ALUMINIUMLEGERING (ZTAL) KABELGELEIDERS — ALUMINIUM-GECOATE FE-NI-LEGERING (ACI) 22,75 MM), INSTALLATIE VAN TECHNOLOGISCH GEAVANCEERDE COMPONENTEN ZOALSPHASORMEETEENHEID BIJ DE S.E. VAN CATANZARO, CALUSIA EN MUCONE EN DE INSTALLATIE VAN EEN TRANSFORMATOR VOOR PLANTAARDIGE OLIE (NIEUWE GENERATIE) IN HET CATANZARO-STATION. (Dutch)
    23 December 2021
    0 references
    DIESES PROJEKT BETRIFFT DIE ANPASSUNG DER TRANSPORTLINIE SIMERI-CATANZARO 150 KV DURCH DEN AUSTAUSCH VON LEITERN DURCH INNOVATIVE HOCHLEISTUNGSLEITER (ALUMINIUMLEGIERUNG (ZTAL) SEILLEITER – ALUMINIUM-BESCHICHTETE FE-NI-LEGIERUNG (ACI) 22,75 MM), INSTALLATION VON TECHNOLOGISCH FORTSCHRITTLICHEN KOMPONENTEN WIE PHASOR-MESSEINHEIT AN DER S.E. VON CATANZARO, CALUSIA UND MUCONE UND DIE INSTALLATION EINES PFLANZENÖLTRANSFORMATORS (NEUE GENERATION) AN DER STATION CATANZARO. (German)
    24 December 2021
    0 references
    ESTE PROYECTO SE REFIERE A LA ADAPTACIÓN DE LA LÍNEA DE TRANSPORTE SIMERI-CATANZARO 150 KV MEDIANTE LA SUSTITUCIÓN DE CONDUCTORES POR CONDUCTORES INNOVADORES DE ALTA CAPACIDAD (ALEACIÓN DE ALUMINIO (ZTAL) — ALEACIÓN FE-NI (ACI) REVESTIDA DE ALUMINIO (ACI) 22,75 MM), LA INSTALACIÓN DE COMPONENTES TECNOLÓGICAMENTE AVANZADOS COMO LA UNIDAD DE MEDICIÓN DE FASES EN LA S.E. DE CATANZARO, CALUSIA Y MUCONE Y LA INSTALACIÓN DE UN TRANSFORMADOR DE ACEITE VEGETAL (NUEVA GENERACIÓN) EN LA ESTACIÓN DE CATANZARO. (Spanish)
    24 January 2022
    0 references
    SIMERI CRICHI
    0 references

    Identifiers

    G83G17000840007
    0 references