ELECTRIC STATION PICERNO (Q2021711)

From EU Knowledge Graph
Revision as of 22:58, 9 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: The budget was changed)
Jump to navigation Jump to search
Project Q2021711 in Italy
Language Label Description Also known as
English
ELECTRIC STATION PICERNO
Project Q2021711 in Italy

    Statements

    0 references
    0.0 Euro
    0 references
    7,829,660.8 Euro
    0 references
    0.0 percent
    0 references
    6 September 2017
    0 references
    31 July 2019
    0 references
    TERNA - RETE ELETTRICA NAZIONALE
    0 references
    0 references

    40°38'18.46"N, 15°38'9.13"E
    0 references
    L'INTERVENTO RIGUARDA LA REALIZZAZIONE DI UNA NUOVA STAZIONE RTN IN DOPPIA SBARRA A 150 KV DA INSERIRE IN ENTRA-ESCE SUI NUOVI COLLEGAMENTI A 150 KV 'CP TITO SMISTAMENTO-CP AVIGLIANO' E 'CP TITO SMISTAMENTO-TANAGRO'.LA REALIZZAZIONE DI TALE STAZIONE SI RENDE NECESSARIA PER AUMENTARE L'AFFIDABILITà DELLA RTN IN UN'AREA NELLA QUALE VI Ê UN'ELEVATA RICHIESTA DI CONNESSIONI (STMG APPROVATE PER 479 MW) OLTRE A PREVENTIVI ACCETTATI DAL DISTRIBUTORE (63 MW SULLA RETE AT E 6 MW SULLA RETE BTBT) CHE, IN ASSENZA DELL'OPERA IN ESAME, NON POTREBBERO ESSERE IMMESSE IN RETE A CAUSA DELLA LIMITATA PORTATA DELLE DIRETTRICI 150 KV 'TANAGRO-POTENZA' E 'TANAGRO-TITO-POTENZA' CHE HANNO UNA CAPACITà DI TRASPORTO NOMINALE DI CIRCA 145 MW CIASCUNA, PER UN TOTALE COMPLESSIVO PARI A 290 MW.L'INTERVENTO OLTRE ALLA REALIZZAZIONE DELLA NUOVA S.E. RIGUARDERà ANCHE LA REALIZZAZIONE DEI RELATIVI RACCORDI I CUI TRACCIATI SI DIRAMANO DAI DUE ELETTRODOTTI ESISTENTI TITO SMISTAMENTO-AVIGLIANO E TITO SMISTAMENTO-TA (Italian)
    0 references
    THE INTERVENTION CONCERNS THE CONSTRUCTION OF A NEW 150 KV DOUBLE RAIL NETWORK STATION TO BE INTEGRATED INTO ENTRA-ESEC ON THE NEW 150 KV ‘CP TITO SMISTINGTO-CP AVILIANO’ AND ‘CP TITO SMISTINGTO-TANAGRO’. THE CONSTRUCTION OF THIS STATION IS NECESSARY TO INCREASE L’AFFIDABILITY IN AN AREA WHERE THERE IS A HIGH DEMAND FOR CONNECTIONS (479 MW ON THE TA NETWORK AND 6 MW ON THE BTBT NETWORK), WHICH, IN THE ABSENCE OF THE WORK IN QUESTION, CANNOT BE PLACED ON THE NETWORK BECAUSE OF THE LIMITED SCOPE OF THE 63 KV GUIDELINES ‘TANAGRO-JUDGMENT’ AND ‘TANAGRO-TITO-POWERED’, WHICH ALSO HAVE THE CONNECTIONS SET OUT IN THE TWO EXISTING LINES, TITO SMISTINGTO-AVIOGLIANO AND TITO SMISTINGTO-TA. (English)
    0 references
    LE PROJET CONCERNE LA CONSTRUCTION D’UNE NOUVELLE STATION RTN EN DOUBLE BARRE À 150 KV QUI SERA INSÉRÉE DANS LES NOUVELLES CONNEXIONS DE 150 KV «CP TITO TRI-CP AVIGLIANO» ET «CP TITO TRI-TANAGRO».LA CONSTRUCTION DE CETTE STATION EST NÉCESSAIRE POUR ACCROÎTRE LA FIABILITÉ DU RTN DANS UNE ZONE OÙ LA DEMANDE DE CONNEXIONS EST ÉLEVÉE (STMG APPROUVÉE POUR 479 MW) EN PLUS DES ESTIMATIONS ACCEPTÉES PAR LE DISTRIBUTEUR (63 MW SUR LE RÉSEAU ET 6 MW SUR LE RÉSEAU BTBT) QUI, EN L’ABSENCE DES TRAVAUX EN QUESTION, N’ONT PAS PU ÊTRE ALIMENTÉES DANS LE RÉSEAU DE RACCORDEMENTS (STMG APPROUVÉ POUR 479 MW) DONT LA CAPACITÉ TOTALE À DEUX MW EST SUPÉRIEURE À LA CAPACITÉ TOTALE DE DEUX MW. (French)
    14 December 2021
    0 references
    HET PROJECT BETREFT DE BOUW VAN EEN NIEUW RTN-STATION IN DUBBELE BAR BIJ 150 KV DAT MOET WORDEN OPGENOMEN IN DE NIEUWE 150 KV-AANSLUITINGEN „CP TITO SORTING-CP AVIGLIANO” EN „CP TITO SORTING-TANAGRO”. DE BOUW VAN DIT STATION IS NOODZAKELIJK OM DE BETROUWBAARHEID VAN HET RTN TE VERGROTEN IN EEN GEBIED WAAR EEN GROTE VRAAG NAAR AANSLUITINGEN BESTAAT (GOEDGEKEURD STMG VOOR 479 MW) NAAST RAMINGEN DIE DOOR DE DISTRIBUTEUR ZIJN AANVAARD (63 MW OP HET NETWERK EN 6 MW OP HET BTBT-NETWERK), DIE BIJ GEBREKE VAN DE BETROKKEN WERKZAAMHEDEN NIET IN HET AANSLUITNET KONDEN WORDEN OPGENOMEN (GOEDGEKEURDE STMG VOOR 479 MW) EN EEN TOTALE CAPACITEIT VAN ONGEVEER TWEE MW HEEFT. (Dutch)
    23 December 2021
    0 references
    DAS PROJEKT BETRIFFT DEN BAU EINER NEUEN RTN-STATION IN DOPPELBALKEN BEI 150 KV, DIE IN DIE NEUEN 150 KV-VERBINDUNGEN „CP TITO SORTING-CP AVIGLIANO“ UND „CP TITO SORTING-TANAGRO“ EINGEFÜGT WERDEN SOLL.DER BAU DIESER STATION IST ERFORDERLICH, UM DIE ZUVERLÄSSIGKEIT DES RTN IN EINEM GEBIET ZU ERHÖHEN, IN DEM EINE HOHE NACHFRAGE NACH VERBINDUNGEN (STMG FÜR 479 MW) ZUSÄTZLICH ZU DEN SCHÄTZUNGEN DES VERTEILERS (63 MW AUF DEM NETZ UND 6 MW IM BTBT-NETZ) BESTEHT, DIE IN ERMANGELUNG DER BETREFFENDEN ARBEITEN NICHT IN DAS VERBINDUNGSNETZ (STMG GENEHMIGT FÜR 479 MW) EINGESPEIST WERDEN KONNTEN (FÜR 479 MW GENEHMIGT). (German)
    24 December 2021
    0 references
    EL PROYECTO SE REFIERE A LA CONSTRUCCIÓN DE UNA NUEVA ESTACIÓN RTN EN DOBLE BARRA A 150 KV QUE SE INSERTARÁ EN LAS NUEVAS CONEXIONES DE 150 KV «CP TITO SORTING-CP AVIGLIANO» Y «CP TITO CLASSING-TANAGRO».LA CONSTRUCCIÓN DE ESTA ESTACIÓN ES NECESARIA PARA AUMENTAR LA FIABILIDAD DE LA RTN EN UNA ZONA EN LA QUE EXISTE UNA GRAN DEMANDA DE CONEXIONES (STMG APROBADO PARA 479 MW) ADEMÁS DE LAS ESTIMACIONES ACEPTADAS POR EL DISTRIBUIDOR (63 MW EN LA RED Y 6 MW EN LA RED BTBT) QUE, A FALTA DE LOS TRABAJOS EN CUESTIÓN, NO PODRÍAN ALIMENTARSE EN LA RED DE CONEXIONES (STMG APROBADO PARA 479 MW) DE CAPACIDAD TOTAL DE POTENCIA, ADEMÁS DE LA CAPACIDAD TOTAL DE LA ESTACIÓN DE CAMBIO. (Spanish)
    24 January 2022
    0 references
    PICERNO
    0 references

    Identifiers

    G83G17000880007
    0 references