SMART GRID PROJECT OF THE PRIMARY MOLINARA CAR PROJECT (Q2017736)

From EU Knowledge Graph
Revision as of 22:15, 9 February 2022 by DG Regio (talk | contribs) (‎Removed claims)
Jump to navigation Jump to search
Project Q2017736 in Italy
Language Label Description Also known as
English
SMART GRID PROJECT OF THE PRIMARY MOLINARA CAR PROJECT
Project Q2017736 in Italy

    Statements

    0 references
    26 March 2018
    0 references
    31 December 2020
    0 references
    E-DISTRIBUZIONE SPA
    0 references

    41°17'26.27"N, 14°54'37.22"E
    0 references
    IL PROGETTO COMPRENDE INTERVENTI SIA DI STRUTTURA CHE DI IMPLEMENTAZIONE DELLE FUNZIONALITà SMART GRID. GLI INTERVENTI STRUTTURALI MIRANO A MODIFICARE LA CONFIGURAZIONE DELL'IMPIANTO AL FINE DI MIGLIORARNE LE CONDIZIONI DI ESERCIZIO E LE PRESTAZIONI.IL PROGETTO CONSISTE NELLA REALIZZAZIONE DI UNA NUOVA CABINA PRIMARIA, IN LINEA CON I PIù RECENTI STANDARD TECNOLOGICI, RENDENDO SMART ANCHE I CENTRI SATELLITE SOTTESI. INOLTRE VERRANNO IMPLEMENTATE NUOVE LINEE MT UTILIZZANDO I NUOVI CAVI IN ALLUMINIO E IN ALLUMINIO ELICORD.IL PROGETTO SI QUALIFICA COME SMART GRID IN QUANTO PREVEDE L'INSTALLAZIONE DI DISPOSITIVI TECNOLOGICI E DI APPARECCHIATURE INTELLIGENTI FINALIZZATE AD UNA GESTIONE EVOLUTA DELLA RETE ELETTRICA, CON L'OBIETTIVO DI AGEVOLARE L'INCREMENTO DELLA QUOTA DI FABBISOGNO ENERGETICO COPERTO DA GENERAZIONE DISTRIBUITA DA FONTI RINNOVABILI. IN TAL SENSO SI IMPLEMENTANO LE SEGUENTI FUNZIONALITà SMART:-SELETTIVITà LOGICA DEL TRONCO GUASTO-OSSERVABILITà DELLA RETE MT-CONTROLLO EVOL (Italian)
    0 references
    THE PROJECT COMPRISES BOTH STRUCTURAL AND OPERATIONAL MEASURES FOR SMART GRIDS. THE STRUCTURAL INTERVENTIONS SHALL AIM AT MODIFYING THE DESIGN OF THE INSTALLATION IN ORDER TO IMPROVE THE CONDITIONS FOR OPERATION AND THE DESIGN OF THE INSTALLATION IS TO CARRY OUT A NEW PRIMARY CABIN, IN ACCORDANCE WITH THE RECENT TECHNOLOGICAL STANDARDS, MAKING THE SATELLITE CENTRES BEHIND THEM SMART. IN ADDITION, NEW MT LINES WILL BE IMPLEMENTED USING NEW ALUMINIUM AND ALUMINIUM WIRE CABLES. THIS PROJECT QUALIFIES AS SMART GRIDS FOR THE INSTALLATION OF SMART TECHNOLOGY DEVICES AND APPLIANCES FOR THE IMPROVED MANAGEMENT OF THE ELECTRICITY GRID, WITH THE AIM OF FACILITATING THE INCREASE IN THE SHARE OF ENERGY DEMAND COVERED BY GENERATION FROM RENEWABLE SOURCES. IN THIS RESPECT, THE FOLLOWING FEATURES ARE USED AS A TOOL FOR SMART: — ATTRIBUTE TO THE UASTO-ROBSERVABILITY TRUNK OF THE MT-CONTROL NETWORK. (English)
    0 references
    LE PROJET COMPREND À LA FOIS LA STRUCTURE ET LA MISE EN ŒUVRE DE FONCTIONNALITÉS DE RÉSEAU INTELLIGENT. LES INTERVENTIONS STRUCTURELLES VISENT À MODIFIER LA CONFIGURATION DE L’INSTALLATION AFIN D’AMÉLIORER LES CONDITIONS D’EXPLOITATION ET LES PRESTATIONS.LE PROJET CONSISTE EN LA RÉALISATION D’UNE NOUVELLE CABINE PRIMAIRE, EN CONFORMITÉ AVEC LES DERNIÈRES NORMES TECHNOLOGIQUES, RENDANT AUSSI INTELLIGENTS LES CENTRES SATELLITAIRES SOUS-JACENTS. EN OUTRE, DE NOUVELLES LIGNES MT SERONT MISES EN ŒUVRE À L’AIDE DU NOUVEAU CABLES ELICORD ALUMINIUM ET ALUMINIUM.LE PROJET EST QUALIFIÉ DE RÉSEAU INTELLIGENT PUISQU’IL PRÉVOIT L’INSTALLATION D’APPAREILS TECHNOLOGIQUES ET D’ÉQUIPEMENTS INTELLIGENTS DESTINÉS À UNE GESTION AVANCÉE DU RÉSEAU ÉLECTRIQUE, DANS LE BUT DE FACILITER L’AUGMENTATION DE LA PART DES BESOINS ÉNERGÉTIQUES COUVERTS PAR LA PRODUCTION DISTRIBUÉE À PARTIR DE SOURCES RENOUVELABLES. EN CE SENS, LES FONCTIONS INTELLIGENTES SUIVANTES SONT MISES EN ŒUVRE:-SELETTIVITY LOGIQUE DE L’OBSERVABILITÉ DU TRONC DÉFECTUEUX DU RÉSEAU MT-CONTROL EVOL (French)
    14 December 2021
    0 references
    HET PROJECT OMVAT ZOWEL DE STRUCTUUR ALS DE IMPLEMENTATIE VAN SLIMME NETWERKFUNCTIES. DE STRUCTURELE INTERVENTIES HEBBEN TOT DOEL DE CONFIGURATIE VAN DE INSTALLATIE TE WIJZIGEN OM DE BEDRIJFSOMSTANDIGHEDEN TE VERBETEREN EN HET PROJECT PRESTATIONS.THE BESTAAT UIT DE REALISATIE VAN EEN NIEUWE PRIMAIRE CABINE, IN OVEREENSTEMMING MET DE NIEUWSTE TECHNOLOGISCHE NORMEN, WAARDOOR OOK DE ONDERLIGGENDE SATELLIETCENTRA SLIM ZIJN. DAARNAAST ZULLEN NIEUWE MT-LIJNEN WORDEN GEÏMPLEMENTEERD MET BEHULP VAN HET NIEUWE ELICORD-ALUMINIUM EN ALUMINIUM CABLES.THE-PROJECT KWALIFICEERT ALS SLIM NET, AANGEZIEN HET VOORZIET IN DE INSTALLATIE VAN TECHNOLOGISCHE APPARATUUR EN INTELLIGENTE APPARATUUR VOOR EEN GEAVANCEERD BEHEER VAN HET ELEKTRICITEITSNET, MET ALS DOEL HET VERGROTEN VAN HET AANDEEL VAN ENERGIEBEHOEFTEN DAT WORDT GEDEKT DOOR OPWEKKING UIT HERNIEUWBARE BRONNEN TE VERGEMAKKELIJKEN. IN DEZE ZIN WORDEN DE VOLGENDE SLIMME FUNCTIES GEÏMPLEMENTEERD:-SELETTIVITY LOGICA VAN DE DEFECTE ROMP-OBSERVABILITY VAN HET NETWERK MT-CONTROL EVOL (Dutch)
    22 December 2021
    0 references
    DAS PROJEKT UMFASST SOWOHL DIE STRUKTUR ALS AUCH DIE UMSETZUNG VON SMART GRID-FUNKTIONEN. DIE STRUKTURINTERVENTIONEN ZIELEN DARAUF AB, DIE KONFIGURATION DER ANLAGE ZU ÄNDERN, UM DIE BETRIEBSBEDINGUNGEN ZU VERBESSERN UND DAS PROJEKT PRESTATIONS.THE BESTEHT IN DER REALISIERUNG EINER NEUEN PRIMÄRKABINE IM EINKLANG MIT DEN NEUESTEN TECHNOLOGISCHEN STANDARDS, SO DASS SMART AUCH DIE SATELLITENZENTREN ZUGRUNDE LIEGEN. DARÜBER HINAUS WERDEN NEUE MT-LINIEN MIT HILFE DES NEUEN ELICORD-ALUMINIUM- UND ALUMINIUM-CABLES-PROJEKTS IMPLEMENTIERT.DAS PROJEKT QUALIFIZIERT SICH ALS INTELLIGENTES NETZ, DA ES DIE INSTALLATION VON TECHNOLOGISCHEN GERÄTEN UND INTELLIGENTEN GERÄTEN FÜR EINE FORTSCHRITTLICHE VERWALTUNG DES STROMNETZES VORSIEHT, UM DIE ERHÖHUNG DES ANTEILS DES ENERGIEBEDARFS ZU ERLEICHTERN, DER DURCH DIE ERZEUGUNG GEDECKT WIRD, DIE AUS ERNEUERBAREN QUELLEN VERTEILT WIRD. IN DIESEM SINNE WERDEN FOLGENDE SMART-FUNKTIONEN IMPLEMENTIERT:-SELETTIVITY LOGIK DER FEHLERHAFTEN TRUNK-BEOBACHTBARKEIT DES NETZWERKS MT-CONTROL EVOL (German)
    24 December 2021
    0 references
    EL PROYECTO INCLUYE TANTO LA ESTRUCTURA COMO LA IMPLEMENTACIÓN DE CARACTERÍSTICAS DE RED INTELIGENTE. LAS INTERVENCIONES ESTRUCTURALES TIENEN COMO OBJETIVO MODIFICAR LA CONFIGURACIÓN DE LA PLANTA CON EL FIN DE MEJORAR LAS CONDICIONES DE FUNCIONAMIENTO Y LAS PRESTACIONES. EL PROYECTO CONSISTE EN LA REALIZACIÓN DE UNA NUEVA CABINA PRIMARIA, EN LÍNEA CON LOS ÚLTIMOS ESTÁNDARES TECNOLÓGICOS, HACIENDO INTELIGENTES TAMBIÉN LOS CENTROS SATELITALES SUBYACENTES. ADEMÁS, SE IMPLEMENTARÁN NUEVAS LÍNEAS MT UTILIZANDO EL NUEVO ELICORD ALUMINIO Y ALUMINIO CABLES. EL PROYECTO SE CALIFICA COMO RED INTELIGENTE, YA QUE PREVÉ LA INSTALACIÓN DE DISPOSITIVOS TECNOLÓGICOS Y EQUIPOS INTELIGENTES DESTINADOS A UNA GESTIÓN AVANZADA DE LA RED ELÉCTRICA, CON EL OBJETIVO DE FACILITAR EL AUMENTO DE LA CUOTA DE NECESIDADES ENERGÉTICAS CUBIERTAS POR LA GENERACIÓN DISTRIBUIDA A PARTIR DE FUENTES RENOVABLES. EN ESTE SENTIDO, SE IMPLEMENTAN LAS SIGUIENTES FUNCIONES INTELIGENTES:-SELETIVIDAD LÓGICA DE LA OBSERVABILIDAD TRONCAL DEFECTUOSA DE LA RED MT-CONTROL EVOL (Spanish)
    24 January 2022
    0 references
    MOLINARA
    0 references

    Identifiers

    F55J18000000006