Infrastructure development at the Heréd Elementary School (Q3903326)

From EU Knowledge Graph
Revision as of 21:25, 9 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: Adding German translations)
Jump to navigation Jump to search
Project Q3903326 in Hungary
Language Label Description Also known as
English
Infrastructure development at the Heréd Elementary School
Project Q3903326 in Hungary

    Statements

    0 references
    0 references
    38,927,078 forint
    0 references
    107,641.54 Euro
    0.00276521 Euro
    3 December 2021
    0 references
    125,190.655 Euro
    0.0027336256 Euro
    14 December 2021
    0 references
    45,796,562.353 forint
    0 references
    84.99999 percent
    0 references
    1 November 2017
    0 references
    30 June 2019
    0 references
    Hatvani Tankerületi Központ
    0 references
    0 references

    47°42'51.88"N, 19°38'45.92"E
    0 references
    Jelen kérelemben a fenntartó a Herédi Általános Iskola infrastrukturális fejlesztésének támogatására nyújt be pályázatot. A projekt tervezett hossza 12 hónap. A herédi általános iskolának egy 1818-ban olasz építőmesterek által épített kastély ad otthont. Az épületet az évek során többször átépítették, így már csak nyomokban őrzi eredeti pompáját, de mégis a mai napig a település egyik meghatározó épülete. 1944-ben az államosításkor vált köznevelési intézménnyé. A tervezett felújítása az épület belső tereit érinti. A tantermekben meglévő elöregedett parketta burkolatok felbontásra kerülnek és aljzatkiegyenlítést követően új nagy kopásállóságú PVC burkolat készül. Az iskolaépület jelenlegi fűtését a kazánházban elhelyezett állandó hőmérsékletű álló gázkazánok biztosítják, az épületben a hőleadók régi öntöttvas tagos radiátorok. A fűtési hálózat, a hőtermelő és hőleadó berendezések elavult szerkezetek, ezért a teljes fűtési rendszer felújításra kerül új kondenzációs gázkazánnal, korszerű acéllemezes lapradiátorokkal és falon kívül vezetett új vezetékrendszerrel A projekt keretében megvalósítandó tevékenységek: 3.1.1 Önállóan támogatható tevékenységek: A nevelési-oktatási tevékenység megvalósításához használt termek, oktatási termek és az azok elérését szolgáló folyosók, közlekedők felújítása, átalakítása (burkolat felújítás). 3.1.2.1 Kötelezően megvalósítandó, önállóan nem támogatható tevékenységek: projekt előkészítés (szakmai terv készítése, kiviteli terv készítése, közbeszerzési eljárások lebonyolítása, projekt menedzsment tevékenység biztosítása, horizontális szempontok érvényesítése és kötelező tájékoztatás és nyilvánosság biztosítása) 3.1.2.2 Választható, önállóan nem támogatható tevékenységek: az infrastrukturális fejlesztésben érintett terek használhatóságának biztosításához eszközök, berendezési tárgyak és bútorok beszerzése (eszközbeszerzés), energetikai korszerűsítés A projekt részletes szakmai tartalma a támogatási kérelem mellékleteként csatolt szakmai tervben kerül bemutatásra. (Hungarian)
    0 references
    In the present application, the maintainer submits an application to support the infrastructure development of the Heréd Primary School. The planned duration of the project is 12 months. The Herédi Primary School is home to a castle built by Italian masters in 1818. The building has been rebuilt several times over the years, so it only retains traces of its original splendor, but it is still one of the most important buildings of the settlement. In 1944, it became a public education institution at the time of nationalisation. The planned renovation affects the interiors of the building. The old parquet floor coverings in the classrooms will be opened and a new high-abrasion PVC casing will be made after the bottom is equalised. The current heating of the school building is provided by stationary gas boilers located in the boiler room, the heat dischargers in the building are old cast iron radiators. The heating network, the heat production and heat transfer equipment are outdated structures, therefore the entire heating system will be refurbished with a new condensation gas boiler, modern steel plate radiators and a new wiring system outside the wall. 3.1.1 Self-eligible activities: Refurbishment and refurbishment of the rooms, educational rooms and corridors and roadways used to carry out the educational activity. 3.1.2.1 Compulsory non-eligible activities: project preparation (professional plan preparation, construction plan, implementation of public procurement procedures, provision of project management activities, implementation of horizontal aspects and mandatory information and publicity) 3.1.2.2 Optional, ineligible activities: in order to ensure the usability of the spaces involved in the infrastructure development, the purchase of equipment and furniture (purchase of equipment), energy modernisation The detailed technical content of the project is presented in the technical plan attached to the grant application. (English)
    8 February 2022
    0 references
    Im vorliegenden Antrag reicht der Betreuer einen Antrag zur Unterstützung der Infrastrukturentwicklung der Heréd Primary School ein. Die geplante Projektlaufzeit beträgt 12 Monate. In der Grundschule Herédi befindet sich eine Burg, die 1818 von italienischen Meistern erbaut wurde. Das Gebäude wurde im Laufe der Jahre mehrmals umgebaut, so dass es nur Spuren seiner ursprünglichen Pracht enthält, aber es ist immer noch eines der wichtigsten Gebäude der Siedlung. Im Jahr 1944 wurde es eine öffentliche Bildungseinrichtung zum Zeitpunkt der Verstaatlichung. Die geplante Renovierung wirkt sich auf die Innenräume des Gebäudes aus. Die alten Parkettbeläge in den Klassenräumen werden geöffnet und ein neues Hochabrieb-PVC-Gehäuse wird hergestellt, nachdem der Boden ausgeglichen ist. Die aktuelle Heizung des Schulgebäudes wird von stationären Gaskesseln im Kesselraum bereitgestellt, die Wärmeentladungsgeräte im Gebäude sind alte Gusseisenheizkörper. Das Heiznetz, die Wärmeerzeugung und Wärmeübertragungsanlagen sind veraltete Strukturen, daher wird die gesamte Heizanlage mit einem neuen Kondensationsgaskessel, modernen Stahlplattenheizkörpern und einem neuen Verdrahtungssystem außerhalb der Wand saniert. 3.1.1 Selbstberechtigte Tätigkeiten: Renovierung und Renovierung der Räume, Bildungsräume und Korridore und Straßen, die zur Durchführung der Bildungstätigkeit genutzt werden. 3.1.2.1 Obligatorische nicht förderfähige Tätigkeiten: Projektvorbereitung (Professionelle Planung, Bauplan, Durchführung von Verfahren zur Vergabe öffentlicher Aufträge, Durchführung von Projektmanagementmaßnahmen, Umsetzung horizontaler Aspekte sowie obligatorische Information und Publizität) 3.1.2.2 Optionale, nicht förderfähige Tätigkeiten: um die Nutzbarkeit der an der Infrastrukturentwicklung beteiligten Räume, den Kauf von Ausrüstung und Mobiliar (Kauf von Geräten), Energiemodernisierung zu gewährleisten, wird der detaillierte technische Inhalt des Projekts in dem dem Zuschussantrag beigefügten technischen Plan dargestellt. (German)
    9 February 2022
    0 references
    Heréd, Heves
    0 references

    Identifiers

    EFOP-4.1.3-17-2017-00389
    0 references