Energy development of the care centre in Lábatlan (Q3951144)

From EU Knowledge Graph
Revision as of 13:33, 9 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: Adding English translations)
Jump to navigation Jump to search
Project Q3951144 in Hungary
Language Label Description Also known as
English
Energy development of the care centre in Lábatlan
Project Q3951144 in Hungary

    Statements

    0 references
    23,420,445 forint
    0 references
    64,762.45 Euro
    0.00276521 Euro
    6 December 2021
    0 references
    75,320.856 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    27,553,464.706 forint
    0 references
    84.999986 percent
    0 references
    31 March 2018
    0 references
    31 January 2020
    0 references
    LÁBATLAN VÁROS ÖNKORMÁNYZATA
    0 references
    Q3961137 (Deleted Item)
    0 references

    47°43'46.34"N, 18°30'20.02"E
    0 references
    A tervezett fejlesztés tárgya a Lábatlan Város Önkormányzatának 100%-os tulajdonában és fenntartásában levő, a 2541 Lábatlan, Dózsa György u. 19., 1400 hrsz. alatt található Gondozási Központ korszerűsítése. Az épület hagyományos falazatú, egyszintes, alápincézetlen, beépítetlen padlásterű és lapostetős épület. A sátortetős épület időben korábban épült (kb. 1930), a lapostetős részek későbbi bővítések eredményei. Az épület vakolatrendszere kopott, repedt, több helyen felázások, felfagyások nyomai láthatók. A nyílászárók a régi épületrészeken elöregedettek, energetikailag nem megfelelőek. Korábban néhány nyílászáró cseréje megtörtént, ezek jellemzően 2-6 éve beépített műanyag keretes, kértrétegű ablakok, ajtók. Az épület akadálymentesítése biztosított: külső korlát, rámpa, nyílászáró, valamint az épületen belül vizesblokk található. Az épület fűtése régi, elöregedett, rossz hatásfokú gázkazánnal van megoldva, teljesítmény-szabályozása a készülékhez kapcsolt szobatermosztáttal történik, a radiátorokon jellemzően kézikerék található. Összességében elmondható, hogy az épület megfelelő műszaki állapotban van, de a mai kornak megfelelő hőszigetelések és alternatív energia felhasználások még nem készültek el. Az épület szerkezetei a jelenlegi hőtechnikai elvárásoknak messze nem felelnek meg. A felújítás célja, hogy az épületben a nyílászárók cseréjével, a hőszigeteléssel, a fűtési rendszer korszerűsítésével az energiafogyasztást, a CO2 kibocsátást minimalizáljuk. Az épület elavult gázfűtésének cseréje az épület gázfogyasztását jelentősen csökkenti, az energetikai hatékonyság fokozása hozzájárul az energiaellátás biztonságának növeléséhez, az energiaimport-függőség mérsékléséhez. A megújuló energiaforrások használatával az üvegházhatású gázok kibocsátása csökken, a fosszilis energiafelhasználás csökkentésével hozzájárulunk a környezeti ártalmak csökkentéséhez, ezzel pedig az ország nemzetközi kötelezettségvállalásának teljesítéséhez. A korszerűsítéssel, a megújuló energia-forrás használatával példát szeretnénk mutatni a szomszédos települések önkormányzatainak, a környező épületek tulajdonosainak, üzemeltetőinek a környezetterhelés csökkentésére. A projekt további célja, hogy: - a látogatók és az épületben dolgozók jobb körülmények között legyenek; - a látogatók, a munkatársak és a lakosság elégedett legyenek; - egy kulturáltabb, élhetőbb településkép jöjjön létre; - az épített környezet minőségének javítása; - a projekt által megismertessük a lakosságot a megújuló energiaforrások hasznosításával, ezáltal szemléletmódot formáljunk és energiatudatosságra, valamint a megszerzett tudás továbbadására neveljünk. A projekt keretében az alábbi tevékenységek valósulnak meg: Energetikai szakértő bevonásával és külső szakértő segítségével elkészült a Projekt Terv. Az előkészítési szakaszban amennyiben szükséges, kiviteli tervdokumentáció készül, ami alapján a szükséges engedélyezési eljárás lefolytatásra kerül. Ezt követően beszerzési eljárás indul a Gondozási Központ energetikai korszerűsítésére vonatkozóan, mely az alábbi építési, kivitelezési munkákat tartalmazza: Önállóan támogatható tevékenységek - Utólagos küldő oldali szigetelés - Műanyag nyílászáró csere/korszerűsítés - Fűtési / HMV / Hűtési rendszer(ek) korszerűsítése - Egyéb gépészeti korszerűsítés(ek) - Napelemes rendszer (napenergiát hasznosító fotovoltaikus rendszerek) Önállóan nem támogatható, kötelezően megvalósítandó tevékenységek - Akadálymentesítés - Nyilvánosság - Képzési anyag Építési Műszaki Ellenőr alkalmazása biztosítja az kivitelezés szakszerű és gazdaságos kivitelezését. A projekt megfelelő megvalósítását több éves tapasztalattal rendelkező projektmenedzsment szervezet biztosítja. A nyilvánosság tájékoztatása az előírásoknak megfelelően történik. Területspecifikus szempontok: 1.1 A fejlesztés a területfejlesztési stratégiai program 6 prioritásából legalább 2-nek a megvalósulásához közvetlenül és igazoltan hozzájárul – igen 1.2 A projektben fejlesztett intézmény ellátási körzetének nagysága - települési szinten valósul meg 2.1 A fejlesztés olyan épületben/épületegyüttesben valósul meg, melynek energetikai felújítása komplex beavatkozásokat igényel – igen. 3.1 A fejlesztés egy épületen, illetve telephelyen belül több ellátási forma és önkormányzati feladatellátási hely energetikai korszerűsítését is célozza – igen 4.1 A fejlesztés alap- vagy középfokú oktatási intézményben valósul meg – nem 4.2 Volt-e jelentős felújítás az épületen, vagy az épületen belül az elmúlt 10 évben – nem 5.1 A projekt műemlék vagy helyi védelem alatt álló épületet vagy épületet érint – nem 5.2 A fejlesztés eredményeként az intézmény energetikai besorolása legalább kettő kategóriát javul – igen 5.3 A pályázó nyilatkozatban vállalja, hogy a felújítás után, annak következtében jelentkező megtakarításait az intézmény további fejlesztésére - különös tekintettel az energiahatékonyságra - használja fel a fenntartási időszakban javul – igen (Hungarian)
    0 references
    The subject of the planned development is the modernisation of the Care Center, which is 100 % owned and maintained by the Municipality of Lábatlan, located under Lábatlan, Dózsa György u. 19, 1400 Hrsz. The building is a traditional masonry, single-storey, uncoated, unbuilt attic and flat roof. The tent roofed building was built earlier in time (approx. 1930), the flat roofs were the result of subsequent extensions. The building’s plaster system is worn, cracked, and there are signs of halves and colds in several places. The doors and windows in the old building are aged and not energy-efficient. Previously, some doors and windows were replaced, typically 2-6 years ago, with plastic framed, requested-layer windows and doors. Accessibility of the building is ensured: there are external railings, ramps, doors and windows, and a sanitary block inside the building. The building is heated by old, old, inefficient gas boiler, its power control is done with the room thermostat connected to the device, the radiators typically have a handwheel. Overall, the building is in good technical condition, but the thermal insulation and alternative energy uses are not yet completed. The construction of the building is far from meeting the current thermal requirements. The aim of the renovation is to minimise energy consumption and CO2 emissions in the building by replacing doors and windows, thermal insulation and modernising the heating system. The replacement of outdated gas heating in the building significantly reduces the gas consumption of the building, while increasing energy efficiency contributes to increasing the security of energy supply and reducing dependence on energy imports. Using renewable energy sources, we reduce greenhouse gas emissions, by reducing fossil energy use, we contribute to reducing environmental harm and thereby meeting the country’s international commitment. By modernising and using the renewable energy source, we would like to set an example for the municipalities of neighbouring municipalities, owners and operators of neighbouring buildings to reduce the environmental burden. The project also aims to: — better conditions for visitors and staff in the building; — the satisfaction of visitors, staff and the general public; — to create a more cultural, liveable urban landscape; — improving the quality of the built environment; — the project should make the public aware of the use of renewable energy sources, thereby shaping an approach and raising energy awareness and passing on the knowledge gained. The following activities will be carried out under the project: The Project Plan was completed with the involvement of an energy expert and with the help of an external expert. During the preparation phase, if necessary, an implementation plan documentation will be prepared, on the basis of which the necessary authorisation procedure will be carried out. A procurement procedure is then launched for the energy modernisation of the Care Centre, which includes the following construction and construction works: Self-eligible activities — Post-sending side insulation — Replacement of plastic doors and windows/upgrading of plastic doors and windows — Modernisation of heating/HMV/cooling system(s) — Other mechanical upgrading(s) — Solar panel system (solar photovoltaic systems) Compulsory activities not self-eligible — Accessibility — Publicity — Application of training material Construction Technical Controller ensures that the construction is carried out professionally and economically. The proper implementation of the project is ensured by a project management organisation with several years of experience. The public shall be informed in accordance with the rules. Area-specific aspects: 1.1 The development directly and certifiably contributes to the realisation of at least 2 of the 6 priorities of the territorial development strategic programme — very 1.2 The size of the supply area of the institution developed in the project — will be realised at municipal level 2.1 The development will be carried out in a building/a complex of buildings whose energy renovation requires complex interventions — yes. 3.1 The development is aimed at the energy modernisation of several forms of supply and local government tasks within one building or site — very 4.1 The development is carried out in a primary or secondary educational institution — whether there has been a major renovation in the building or within the building in the last 10 years — not 5.1 The project concerns monuments or locally protected buildings or buildings — not 5.2 As a result of the development, the institution’s energy classification improves at least two categories — very 5.3 The applicant undertakes in the declaration to use its savings after the renovation to further develop the institution, in particular with regard to energy efficiency, during the maintenance period — yes (English)
    9 February 2022
    0 references
    Lábatlan, Komárom-Esztergom
    0 references

    Identifiers

    TOP-3.2.1-16-KO1-2017-00002
    0 references