Industrial area infrastructure development Zircen (Q3946787)

From EU Knowledge Graph
Revision as of 11:07, 9 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: Adding English translations)
Jump to navigation Jump to search
Project Q3946787 in Hungary
Language Label Description Also known as
English
Industrial area infrastructure development Zircen
Project Q3946787 in Hungary

    Statements

    0 references
    263,402,397 forint
    0 references
    728,362.94 Euro
    0.00276521 Euro
    6 December 2021
    0 references
    809,037.68 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    295,957,749.438 forint
    0 references
    88.999999 percent
    0 references
    1 February 2020
    0 references
    29 July 2022
    0 references
    ZIRC VÁROSI ÖNKORMÁNYZAT
    0 references
    0 references

    47°15'15.88"N, 17°52'15.74"E
    0 references
    A) A projektünk alapvető stratégiai célja – felhívás céljával összhangban -, hogy a helyi gazdaság erősödjön, illetve a Zirc Városában a megfelelőinfrastruktúra létrehozásával a vállalkozások száma bővüljön, a helyi gazdaság működését segítő helyi feltételek biztosítottak legyenek. A projekt közvetlen céljai: Alapinfrastruktúrával ellátott összesen 4,4515 ha területű 9 db telephely fogadására képes iparterület kialakítása, ezáltal új vállalkozások letelepedésének elősegítése a Városban. A projekt közvetett céljai: Az iparterületre betelepülő vállalkozások által a Városban működő vállalkozások számának növelése, a helyi gazdaság erősítése. A betelepülő vállalkozások által munkahelyek létrehozása és/vagy bővítése. A Város adóbevételeinek növelése (P.l.: Helyi Iparűzési Adó). A szociális kiadások csökkentése azáltal, hogy a betelepülő vállalkozások a szakképzett állás keresőket felszívják. Térségi gazdasági hálók erősítése (Helyi alapanyagokra alapuló ipar). A projekt rövid távú céljai: A projektünk rövid távú operatív célja 4,4515 ha területű közművesített iparterület létrehozása, 9 db kb. 4000 m2 betelepülésre alkalmas területtel. A projekt hosszú távú céljai: Vállalkozások betelepülése a kialakított telephelyekre, ezáltal a gazdaság erősödése, és a munkahelyek számának növekedése, a város gazdaságának és népességmegtartó erejének erősödése. A betelepülő vállalkozások, létrejövő munkahelyek által a térségi gazdasági kapcsolatok erősítése és fejlesztése. B) Projektünk keretében Zirc Város ipari besorolású területén zöldmezős beruházás megvalósítására kerül sor, amely keretében 4,4515 ha területen kerül kialakításra közművesített iparterület. A projektben érintett 07/12 hrsz. ingatlan ipari területként történő fejlesztése során a területen összesen 9 db infrastruktúrával ellátott kb. 4000 m2 területű ipari ingatlan kialakítására, és a terület teljes közművesítésére kerül sor. A fejlesztésben megvalósuló alapinfrastruktúrák kiépítése az alábbi műszaki tartalmat foglalja magában: 1. A területek megközelítését biztosító út kialakítása 2. Ivóvízhálózat létrehozása 3. Szennyvízelvezetés megoldása 4. Csapadékvíz elvezetés kialakítása 5. Elektromos hálózat – 0,4 kV hálózat ,,B" típusú töltőrendszer, és közvilágítás létrehozása 6. Optikai hálózat (távközlés, biztonságtechnika) kialakítása: 7. Gázhálózat létrehozása Az építési tevékenységek mellett az projekt előkészítéséhez és megvalósításához szükséges járulékos tevékenységek elvégzésére is sor kerül. C) A felhívás 3.4 pontjában előírt feltételek teljesülése: A Projektünk teljes körűen megfelel a kiírás 3.4. pontjában előírt feltételeknek, a projekt tervezése során mind a műszaki, illetve egyéb (Nyilvánosság, esélyegyenlőség, stb.) előírásokat teljes körűen figyelembe vettük. D) 1.1.: Igen, hozzájárul, ÜT. 1.2.: Megfelel, Önkorm. 2.1.: Megfelel, ÜT tartalmazza. 2.2.: Nem releváns. 2.3.: Megfelel, tartalmaz Önállóan támogatható tevékenységet (3.1.1. B) pont) 2.4. Nem releváns (Zöldmezős ber.) 2.6. A projekt megfelel a Felhívás műszaki-szakmai feltételeinek. 3.1.: Megfelel, ÜT mellékelve. 3.2.: Megfelel, ÜT-ben bemutatva. 3.3.: Megfelel, A tervezés során a műszaki és jogszabályi előírások figyelembevételre kerültek 4.1.: Nem releváns. 4.2. - 4.3.: A mérföldkövek a Felhívás előírásai alapján kerültek meghatározásra. 4.4.: Megfelel, az ÜT-ben került bemutatásra. 5.1.: Megfelel, szinergia fennáll. 5.2.: Megfelel, ÜT-ben bemutatva. 5.3.: A fejlesztésünk összhangban van a TOP 5. prioritással. 5.4.: Nem releváns. 6.1. - 6.2.: Megfelel, ÜT-ben bemutatva. 6.3.: Energia hatékonyság, a szükséges akadálymentesítés megvalósításra kerül. 7.1.:Közvetetten a TOP 5. prioritás 8.1.: Nem releváns. 8.2. A projekt megvalósításával a környezeti, pénzügyi fenntart. biztosított. 8.3.: Megfelel, ÜT tartalmazza. 9.1.: Megfelel, esélyegyenlőség biztosított. 10.1.: Megfele, reális és takarékos. 11.1.: Igen, "Fejlesztett vagy újonnan létesített iparterületek és ipari parkok területe" indikátorhoz 4,4515 ha-val járul hozzá. E) 1.1.: A tervezett beruházás illeszkedik a Veszprém Megye Területfejlesztési Programjához, az ÜT-ben került bemutatásra. 1.2.: A fejlesztés a Járási stratégiai célokkal és beavatkozási területekkel is összhangban van, ÜT_ben került bemutatásra. 1.3.: A tervezett fejlesztés zöldmezős beruházásként kerül megvalósításra. 2.1.: A tervezett fejlesztés a Zirci városban valósul meg, a 105/2015. Korm. rendelet szerint nem minősül kedvezményezett településnek. 2.2.: A fejlesztés a Zirci Járásban valósul meg, amely a 290/2014. Korm. rendelet alapján nem minősül kedvezményezett járásnak. 3.1.: A projekt megvalósítása során az ÜT-ben bemutatott tartalom alapján a projektgazda vállalja, hogy a megyében létrejövő megyei, helyi foglalkoztatási paktumokkal együttműködik. (Hungarian)
    0 references
    A) The basic strategic objective of our project — in line with the objective of the call — is to strengthen the local economy and to increase the number of businesses by creating the appropriate infrastructure in the City of Zirc, and to ensure local conditions for the operation of the local economy. The direct objectives of the project are: Creating an industrial area capable of hosting 9 sites with a total area of 4.4515 ha with basic infrastructure, thereby facilitating the establishment of new businesses in the City. The indirect objectives of the project are: Increase the number of enterprises operating in the City by enterprises in industrial areas and strengthen the local economy. The creation and/or expansion of jobs by the enterprises that are being set up. Increasing the city’s tax revenues (e.g.: Local Driving Tax). Reduce social spending by absorbing skilled jobseekers by setting up businesses. Strengthening regional economic networks (industry based on local raw materials). Short-term objectives of the project: The short-term operational goal of our project is to create an improved industrial area of 4.4515 ha, with 9 areas suitable for settlements of about 4 000 m². Long-term objectives of the project: The relocation of businesses to established sites, thereby strengthening the economy and increasing the number of jobs, strengthening the city’s economy and population retention. Strengthening and developing economic relations in the region through the creation of new businesses and jobs. B) As part of our project, a greenfield investment will be carried out in the industrial area of Zirc City, in which an improved industrial area will be built in 4.4515 ha. In the course of the development of the property 07/12 as an industrial area covered by the project, a total of 9 industrial real estates with infrastructure of around 4 000 m² will be built in the area and the area is fully improved. The construction of basic infrastructure in development includes the following technical content: 1. Developing a pathway to the areas 2. Establishment of a drinking water network 3. Sewage disposal solution 4. Rainwater drainage design 5. Power grid — 0.4 kV network,B" charging system and creating street lighting 6. Design of an optical network (telecommunications, security technology): 7. In addition to the construction activities, the ancillary activities necessary for the preparation and implementation of the project will be carried out. Compliance with the conditions set out in point 3.4 of the notice: Our Project fully complies with the conditions set out in point 3.4 of the tender notice, and we have taken full account of both technical and other requirements (publicity, equal opportunities, etc.) when designing the project. D) 1.1.: Yes, he’s contributing, BU. 1.2.: It’s fine, me and you. 2.1.: It’s okay, it’s included. 2.2.: It’s not relevant. 2.3.: Compliant, including self-eligible activities (3.1.1) (B) 2.4. Not relevant (Greenfield ber.) 2.6. The project meets the technical-professional conditions of the Call. 3.1.: It’s OK, BU is attached. 3.2.: It’s fine, presented in BU. 3.3.: In the course of the design, the technical and legislative requirements were taken into account 4.1.: It’s not relevant. 4.2. — 4.3.: The milestones are defined on the basis of the requirements of the Call. 4.4.: It’s all right, it was presented at the BCC. 5.1.: It’s okay, there’s synergy. 5.2.: It’s fine, presented in BU. 5.3.: Our development is in line with TOP 5 priority. 5.4.: It’s not relevant. 6.1. — 6.2.: It’s fine, presented in BU. 6.3.: Energy efficiency, the necessary accessibility will be implemented. 7.1:Indirectly, TOP priority 5 8.1: It’s not relevant. 8.2. The environmental and financial maintenance of the project is ensured. 8.3.: It’s okay, it’s included. 9.1.: Equal opportunities are guaranteed. 10.1.: Halfway, realistic and economical. 11.1.: Yes, it adds 4.4515 ha to “Area of developed or newly established industrial areas and industrial parks”. (E) 1.1: The planned investment is in line with the Regional Development Programme of Veszprém County, which was presented in the ÜT. 1.2.: The development is also in line with the District strategic objectives and areas of intervention, presented in ÜT_. 1.3.: The planned development will be implemented as a greenfield investment. 2.1.: The planned development will take place in the city of Zirci, in accordance with Article 105/2015. According to the Government Decree, it is not considered a beneficiary municipality. 2.2.: The development takes place in Zirci District, which is 290/2014. It does not qualify as a beneficiary district on the basis of the Government Decree. 3.1.: During the implementation of the project, the project promoter undertakes to cooperate with local employment pacts in the county, based on the content presented in the RCC. (English)
    9 February 2022
    0 references
    Zirc, Veszprém
    0 references

    Identifiers

    TOP-1.1.1-16-VE1-2017-00002
    0 references