Püspökladány — Bihor Cross bottleneck replacement and electrification (Q3942979)

From EU Knowledge Graph
Revision as of 09:32, 9 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: Adding English translations)
Jump to navigation Jump to search
Project Q3942979 in Hungary
Language Label Description Also known as
English
Püspökladány — Bihor Cross bottleneck replacement and electrification
Project Q3942979 in Hungary

    Statements

    0 references
    64,923,144,187 forint
    0 references
    179,526,127.54 Euro
    0.00276521 Euro
    4 December 2021
    0 references
    283,321,736.534 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    103,643,211,613.799 forint
    0 references
    62.641128 percent
    0 references
    28 April 2017
    0 references
    31 December 2023
    0 references
    NIF Nemzeti Infrastruktúra Fejlesztő zártkörűen működő Részvénytársaság
    0 references
    0 references

    47°8'19.18"N, 21°42'6.44"E
    0 references
    Jelen projekt az alább részletezett műszaki szakmai tartalom előkészítésének elvégzésére irányul, úgymint: MT, CBA, engedélyeszési tervek elkészítése, hatósági engedélyek megszerzése, kivitelezési tenderdokumentáció összeállítása. A Püspökladány – Biharkeresztes oh. országos törzshálózati vasútvonal része a transz-európai vasúti árufuvarozási hálózatnak. A vasúti pálya egyvágányú, a jelenleg alkalmazható tengelyterhelés 210 kN. Az engedélyezett pályasebesség 100 km/h, de a vonalon jelentős számban állandó és ideiglenes lassújelek vannak. A tervezett fejlesztéseknél az EU által elvárt paraméterek teljesítése a cél. Minimum 100 km/h pályasebesség biztosítása, esélyegyenlőségi feltételek javítása. A pontos műszaki tartalom meghatározása a Megvalósíthatósági Tanulmány elkészültét követően lehetséges. Villamos felsővezeték, alállomás és erősáramú munkák: Püspökladánytól villamos felsővezeték építés Biharkeresztes-oh. fázishatárig, egyvágányú pályán, állomásokon és forgalmi kitérőben, 55,6 km hosszban. A villamos felsővezetéki berendezés helyi és távfelügyelete Debrecen központból történik. Az energiaellátás biztosítása érdekében új alállomás létesítése szükséges Berettyóújfalun 4 km kitápláló vezeték megépítésével. A felsővezeték kiépítésével együtt FET-HETA berendezés épül, mely bekötésre kerül a más projekt keretében kiépítendő tervezett debreceni FET központba Pályalétesítmények: A MÁV Zrt. által korában átépítésre kerülő Berettyóújfalu – Mezőpeterd, Biharkeresztes-oh. vonalszakaszok kivételével a nyílt vonalakat és az állomások jelenleg 48. rendszerű átmenő és megelőző vágányait szükséges átépíteni 54. rendszerű felépítménnyel. Az építési költség 250 mFt/km fajlagos ár alkalmazásával lett meghatározva. Az állomásokon vasbetonaljas kitérők, sk+55 cm magas peronok, esőbeállók épülnek a szükséges vágánybontásokkal. Távközlési- és biztosítóberendezési munkák: A vonalhálózat teljes hosszában fényvezető szálas kábel épül a felsővezetéki rendszer oszlopain rögzítve, a biztosítóberendezés és távközlési igények kiszolgálására. A meglévő vonali berendezések, állomási fényjelzős mechanikus berendezések megmaradnak, védelembe helyezésük biztosítandó. (Hungarian)
    0 references
    The present project aims to prepare the technical technical content detailed below, such as: Preparation of MT, CBA, licensing plans, obtaining official licenses, preparation of construction tender documentation. The Püspökladány — Biharkeresztes oh. national core network railway is part of the trans-European rail freight network. The railway track is single-track, the currently applicable axle load is 210 kN. The authorised track speed is 100 km/h, but a significant number of constant and temporary slow signals are present on the line. The aim is to meet the parameters expected by the EU in the planned developments. Ensuring a minimum speed of 100 km/h and improving equal opportunities conditions. It is possible to determine the exact technical content after the feasibility study has been completed. Overhead contact line, substation and power work: Construction of electric overhead contact line from Püspökladány to Biharkeresztes-oh. phase boundary, single-track track, stations and traffic detours, 55.6 km length. The local and remote monitoring of the overhead contact line equipment is carried out from the centre of Debrecen. In order to ensure the energy supply, a new substation is needed in Berettyóújfalu with the construction of a 4 km power line. Together with the construction of the overhead contact line, FET-HETA equipment is being built, which will be connected to the planned FET centre in Debrecen: With the exception of the Berettyóújfalu — Mezőpeterd, Biharkeresztes-oh. sections of the Berettyóújfalu — Mezőpeterd, Biharkeresztes-oh., which will be rebuilt by MÁV Zrt., it is necessary to rebuild open lines and the current 48th system of cross-border and preventive tracks of stations with a 54th system superstructure. The construction cost was determined by applying a specific price of 250 mt/km. The stations are equipped with reinforced concrete detours, sk+ 55 cm high platforms, rain stops with the necessary track breakdowns. Telecommunications and interlocking works: The entire length of the line network is based on optical fibre cables fixed on the columns of the overhead contact line system to serve the interlocking and telecommunications needs. Existing line equipment and station-based mechanical devices will remain in place to ensure their protection. (English)
    9 February 2022
    0 references
    Biharkeresztes, Hajdú-Bihar
    0 references

    Identifiers

    IKOP-2.1.0-15-2017-00035
    0 references