Solution Ltd. Heat engineering modernisation and renewable energy use of the office building on the site (Q3935202)
Jump to navigation
Jump to search
Project Q3935202 in Hungary
Language | Label | Description | Also known as |
---|---|---|---|
English | Solution Ltd. Heat engineering modernisation and renewable energy use of the office building on the site |
Project Q3935202 in Hungary |
Statements
32,002,758 forint
0 references
159,061.016 Euro
0.0027336256 Euro
15 December 2021
0 references
58,186,832.727 forint
0 references
54.999997 percent
0 references
1 February 2021
0 references
30 September 2022
0 references
MEGOLDÁS Környezetvédelmi és Kereskedelmi Korlátolt Felelősségü Társaság
0 references
A fejlesztés helyszíne Szombathely, Körmendi út 92. A fejlesztendő épület a 10457/13 hrsz alatt található. Az épület 1 irodaházból áll, ezt érinti az energetikai fejlesztés. Projekt megvalósításának főbb lépései: - épület hőszigetelése - tetőszigetelés - épület nyílászáróinak cseréje - fűtési rendszer korszerűsítése - világítási rendszer korszerűsítése - napelem rendszer kiépítése – 10kWp - hőszivattyú telepítése – 20kW Ütemezés: 2020. február-április: Projekt előkészítés 2020. október – 2020 november: kivitelezés 1. rész (hőszivattyú beépítés, fűtéskorszerűsítés), nyilvánosság 2020. december-2021. január: kivitelezés 2. rész (világítási rendszer korszerűsítése) 2021. március-2021 május: kivitelezés 3. rész (nyílászárócsere) 2021. szeptember-2021 október: kivitelezés 4. rész (hőszigetelés) 2022. július – 2022. augusztus: kivitelezés 5. rész (napelem beépítés), 2022. szeptember: nyilvánosság Projektmenedzsment: A projektmenedzsment annak figyelembe vételével került összeállításra, hogy a projekt megvalósításához szükséges valamennyi szakértelem, tapasztalat megjelenjen benne. A fejlesztés megvalósításában a Projektgazda saját apparátusával, valamint külső partnerek közreműködésével vesz részt. A projekttel kapcsolatos stratégiai menedzsment feladatokat a projektgazda vezetője látja el, a projektmenedzsment operatív feladatait és a projekt megvalósításának megfelelő adminisztrációját belső projektmenedzser végzi tanácsadó bevonásával. A projekt megvalósításához szükséges pénzügyi teendőket a projektgazda szervezet könyvelését végző cég, a megfelelő műszaki tartalom megvalósításáért műszaki szakértő (műszaki ellenőr) kerül bevonásra. A projektgazda több projektet (beruházást) bonyolított már, több nyertes EU-s pályázata volt a korábbi években. Projektmenedzsment projektszakértői több mint 15 éves projektmenedzseri tapasztalattal rendelkeznek, önkormányzati továbbá vállalkozói projektek megvalósításában és elszámolásában. Projekt tanácsadó 10 éves Közreműködő Szervezeti tapasztalattal is rendelkezik. Projektben tervezett tevékenységek: Projekt-előkészítési tevékenységek (nem elszámolt tevékenység) Előzetes tanulmányok, tervek, alátámasztó dokumentumok, energetikai számítások elkészítése Épületek hőtechnikai adottságainak javítása, hőveszteségének csökkentése (Felhívás 3.1.1 B.I.a) Fűtött és fűtetlen teret elválasztó, nem nyílászáró szerkezetnek minősülő épülethatároló szerkezetek hőszigetelése Fűtött és fűtetlen teret elválasztó, nyílászáró szerkezetnek minősülő épülethatároló szerkezetek cseréje / energia-megtakarítást eredményező korszerűsítése Megújuló energiafelhasználás növelését célzó tevékenységek (Felhívás 3.1.1 A. III. és IV.) Napelemes rendszer telepítése hálózati, vagy autonóm (hálózatra nem kapcsolódó) villamosenergia-termelés céljából, kizárólag a fejlesztésben érintett épület villamosenergia-ellátásához Hőszivattyú rendszerek alkalmazása fűtésre és/vagy hűtésre és/vagy használati melegvíz-termelésre és/vagy fűtésrásegítésre Műszaki ellenőrzési tevékenység és Kötelező nyilvánosság biztosítása (nem elszámolt tevékenység) A beruházás hozzájárul az épületek energiatakarékosságának és energiahatékonyságának megújuló energiaforrások felhasználásával történő javításához. Egyszerre szolgálja a környezettudatos gazdasági versenyképesség erősítését, a környezetterhelés és a felhasznált primer energia mennyiségének csökkentését, illetve a vállalkozás rezsiköltségének csökkentését. (Hungarian)
0 references
The development takes place in Szombathely, Körmendi út 92. The building to be developed is located under Hr. 10457/13. The building consists of 1 office building, which is affected by energy development. Main steps for the implementation of the project: — building insulation — roof insulation — replacement of doors and windows in a building — modernisation of the heating system — modernisation of the lighting system — installation of solar panel system — 10kWp — installation of a heat pump — 20 kW Schedule: February-April 2020: Project preparation October 2020 — November 2020: works Part 1 (heat pump installation, heating upgrade), public December 2020 — January 2021: construction Part 2 (modernisation of lighting system) March 2021-May 2021: implementation part 3 (replacement of openings) September 2021 — October 2021: construction Part 4 (heat insulation) July 2022 — August 2022: execution part 5 (solar panel installation), September 2022: public Project Management: Project management has been compiled taking into account that all the expertise and experience required for the implementation of the project are present. The Project Owner participates in the implementation of the development with its own apparatus and with the participation of external partners. Strategic management tasks related to the project are carried out by the project owner’s manager, the operational tasks of project management and the proper administration of the project are carried out by an internal project manager with the involvement of an internal project manager. The financial tasks necessary for the implementation of the project will be involved by the company carrying out the accounting of the project owner, a technical expert (technical inspector) for the implementation of the relevant technical content. The project promoter has already carried out several projects (investments) and had several winners in the EU in previous years. Project management project experts have more than 15 years of experience as project manager, as well as in the implementation and accounting of municipal and entrepreneurial projects. Project consultant also has 10 years of Intermediate Organisation experience. Activities planned in the project: Project preparation activities (non-accounted activity) Preliminary studies, plans, supporting documents, energy calculations Preliminary studies, plans, supporting documents, energy calculations to improve the thermal capabilities of buildings, reduction of heat loss (Call 3.1.1 B.I.a) Thermal insulation of heated and unheated building envelopes other than doors and windows separating Heated and unheated spaces, replacement/replacement of building envelopes considered as doors and doors (call 3.1.1 B.I.a.) Heated and unheated building envelopes other than doors and windows for building envelopes, replacement of building envelopes/replacement of building envelopes classified as door closures/replacement of building envelopes/renewables resulting in energy saving (call 3.1.1 A. III and IV) Installation of solar systems for network or autonomous (network-connected) heating/cooling systems for the exclusive purpose of heating and/or the use of electricity or cooling for the use of public utilities (call 3.1.1 A. III and IV) for the construction of electricity and for the construction of energy-power generation for the construction of electricity and for the production of electricity, for the exclusive use of power generation and for the construction of power generation, and the installation of energy-related energy sources for the construction of electricity and for the provision of electricity and energy for the exclusive use of electricity and for the construction of energy-related installations (Call 3.1.1 A. III and IV). At the same time, it serves to strengthen green economic competitiveness, reduce the environmental burden and the amount of primary energy consumed and reduce the cost of the company’s utilities. (English)
8 February 2022
0 references
Szombathely, Vas
0 references
Identifiers
GINOP-4.1.4-19-2020-02198
0 references