Installation of solar system at “HAPP” Kft. (Q3935184)

From EU Knowledge Graph
Revision as of 21:58, 8 February 2022 by DG Regio (talk | contribs) (‎Changed an Item: Adding English translations)
Jump to navigation Jump to search
Project Q3935184 in Hungary
Language Label Description Also known as
English
Installation of solar system at “HAPP” Kft.
Project Q3935184 in Hungary

    Statements

    0 references
    97,761,600 forint
    0 references
    270,331.35 Euro
    0.00276521 Euro
    3 December 2021
    0 references
    485,897.477 Euro
    0.0027336256 Euro
    15 December 2021
    0 references
    177,748,363.636 forint
    0 references
    55.0 percent
    0 references
    1 June 2020
    0 references
    31 May 2022
    0 references
    "HAPP" Fuvarozó és Szállítmányozó Korlátolt Felelősségű Társaság
    0 references
    0 references

    47°8'33.40"N, 17°48'51.30"E
    0 references
    A projekt során az alábbi fejlesztés valósul meg: Napelemes rendszer telepítése. A tetőn elhelyezett összesen 350,4 kWp teljesítményű napelemrendszer beüzemelése valósul meg. A projekt előkészítése során idáig megtörtént a projekt megfelelő előkészítése. Felkértük a Felhívásnak előírásainak mindenben megfelelő a Magyar Mérnöki Kamara névjegyzékében szereplő, cégünktől független TÉ jogosultsággal rendelkező szakértőt, hogy készítse el a pályázat benyújtásához szükséges energetikai számításokat, és nyilatkozatokat. A nyilatkozatokat a pályázat mellékleteként csatoltuk. Felkértük a tervezőt a megfelelő tervek elkészítésére. Elkészült a műszaki leírás, valamint a tervrajzok, amelyeket szintén a pályázat mellékleteként csatoltunk. Utánajártunk annak, hogy az építési beruházás nem engedélyköteles tevékenység, így építési engedély beszerzése nem vált szükségessé. A projekt legfontosabb következő lépései a kivitelezési munkák megrendelése, a műszaki ellenőr megrendelése, majd a kivitelezés nyomon követése, dokumentálás és végül az elszámolás. A kivitelezési munkák megfelelő színvonalú elkészítését ME-V jogosultsággal rendelkező műszaki ellenőr fogja felügyelni. A projekt végén az elszámoláshoz szükséges nyilatkozatok, valamint a hálózathasználati szerződés beszerzése történik, ezt követően benyújtásra kerül a záró elzsámolás. A megvalósítás során külsős, tapasztalattal rendelkező projkektmenedzser segíti majd a megvalósítást. A projektmenedzser 10 éves pályázati projektmegvalósítási tapasztalattal rendelkezik, több, sikeresen megvalósult épületenergetikai projekt megvalósítását koordinálta már. Jelen projekt keretében csak a napelemes rendszer beruházásának költségeit kívánjuk elszámolni. Megvalósítani kívánt célterületek: A. Megújuló energiafelhasználás növelését célzó tevékenységek III. Napelemes rendszer telepítése hálózati villamosenergia-termelés céljából, kizárólag a fejlesztésben érintett épület és az abban folyó gazdasági-termelési folyamatok villamosenergia-ellátásához Ide terveztünk be 876 db panelből álló, Luxor Eco Line MonoPERC 400 WP Monokristályos napelemekből álló, összesen 350,4 kW teljesítményű napelemrendszer díját. A napelemek a tetőn kerülnek elhelyezésre. A rendszerhez 4 db SolarEdge 3 Phase SE82,8K Inverter kerül beszerzésre. (Hungarian)
    0 references
    The following development will be carried out during the project: Installation of solar system. A total of 350,4 kWp solar panel system installed on the roof will be installed. The project has been properly prepared to date during the preparation of the project. In all respects, we have invited an expert who is independent of our company and listed in the register of the Hungarian Chamber of Engineers to prepare the energy calculations and declarations necessary for the submission of the application, in accordance with the requirements of the call. The declarations are attached as an annex to the application. We asked the designer to prepare the appropriate plans. The technical specifications as well as the blueprints have been prepared, which are also attached as an annex to the tender. We checked that the works were not subject to authorisation, so it was not necessary to obtain a building permit. The most important next steps of the project are the ordering of the construction works, the order of the technical inspector, followed by the follow-up of the implementation, documentation and finally the accounting. The completion of the construction works will be supervised by a technical inspector with ME-V authorisation. At the end of the project, the declarations required for the settlement and the contract of use of the network will be obtained, after which the final check will be submitted. The implementation will be supported by an external and experienced projkekt manager. The project manager has 10 years of project implementation experience and has already coordinated the implementation of several successfully implemented building energy projects. In the framework of this project, we only wish to declare the costs of the investment of the solar system. Target areas to be achieved: A. Activities to increase renewable energy use III. Installation of a solar panel system for the production of electricity in the grid, exclusively for the electricity supply of the building concerned by the development and the economic and production processes involved in the development. This is where we planned the charge of a solar panel system consisting of 876 panels, Luxor Eco Line MonoPERC 400 WP Monocrystalline solar panels with a total capacity of 350.4 kW. Solar panels are placed on the roof. 4 SolarEdge 3 Phase SE82,8K Inverters are purchased for the system. (English)
    8 February 2022
    0 references
    Márkó, Veszprém
    0 references

    Identifiers

    GINOP-4.1.4-19-2020-02168
    0 references